L-l可靠性输电系统扩展规划的母线角差结构切割

Laura M. Escobar, Adolfo R. Escobedo, David G. Escobar, R. Romero
{"title":"L-l可靠性输电系统扩展规划的母线角差结构切割","authors":"Laura M. Escobar, Adolfo R. Escobedo, David G. Escobar, R. Romero","doi":"10.1109/EPEC.2018.8598449","DOIUrl":null,"url":null,"abstract":"This paper presents a methodology to solve the long-term transmission network expansion planning problem considering L-l reliability. The methodology supplements an underlying mixed-integer linear programming formulation with cutting planes derived from structural insights of bus-angle differences involving buses connected by paths of existing and/or expansion lines. The addition of these cutting planes expedites the solution process by yielding tighter relaxation bounds within a branch-and-cut framework, thereby reducing computational times and memory requirements. In order to solve the resulting problems, this work uses the AMPL modeling language interfaced with the CPLEX mathematical programming solver. The practicality of the methodology is tested via the Southern Brazilian System, yielding very promising results.","PeriodicalId":265297,"journal":{"name":"2018 IEEE Electrical Power and Energy Conference (EPEC)","volume":"299 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Bus-Angle Difference Structural Cuts for Transmission System Expansion Planning with L-l Reliability\",\"authors\":\"Laura M. Escobar, Adolfo R. Escobedo, David G. Escobar, R. Romero\",\"doi\":\"10.1109/EPEC.2018.8598449\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a methodology to solve the long-term transmission network expansion planning problem considering L-l reliability. The methodology supplements an underlying mixed-integer linear programming formulation with cutting planes derived from structural insights of bus-angle differences involving buses connected by paths of existing and/or expansion lines. The addition of these cutting planes expedites the solution process by yielding tighter relaxation bounds within a branch-and-cut framework, thereby reducing computational times and memory requirements. In order to solve the resulting problems, this work uses the AMPL modeling language interfaced with the CPLEX mathematical programming solver. The practicality of the methodology is tested via the Southern Brazilian System, yielding very promising results.\",\"PeriodicalId\":265297,\"journal\":{\"name\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"volume\":\"299 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPEC.2018.8598449\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Electrical Power and Energy Conference (EPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2018.8598449","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文提出了一种考虑L-l可靠性的输电网长期扩容规划问题的求解方法。该方法补充了一个潜在的混合整数线性规划公式,其中切割平面来自于母线角度差异的结构见解,涉及由现有和/或扩展线路的路径连接的母线。这些切割平面的增加通过在分支-切割框架内产生更严格的松弛边界来加快求解过程,从而减少计算时间和内存需求。为了解决由此产生的问题,本工作使用了AMPL建模语言与CPLEX数学规划求解器的接口。通过南巴西系统测试了该方法的实用性,产生了非常有希望的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Bus-Angle Difference Structural Cuts for Transmission System Expansion Planning with L-l Reliability
This paper presents a methodology to solve the long-term transmission network expansion planning problem considering L-l reliability. The methodology supplements an underlying mixed-integer linear programming formulation with cutting planes derived from structural insights of bus-angle differences involving buses connected by paths of existing and/or expansion lines. The addition of these cutting planes expedites the solution process by yielding tighter relaxation bounds within a branch-and-cut framework, thereby reducing computational times and memory requirements. In order to solve the resulting problems, this work uses the AMPL modeling language interfaced with the CPLEX mathematical programming solver. The practicality of the methodology is tested via the Southern Brazilian System, yielding very promising results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Power Mismatch Elimination Strategy for an MMC-based PV System in Unbalanced Grids Implementation and Testing of a Hybrid Protection Scheme for Active Distribution Network Evaluation of Parametric Statistical Models for Wind Speed Probability Density Estimation Modeling of Ferroresonance Phenomena in MV Networks Emulating Subsynchronous Resonance using Hardware and Software Implementation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1