{"title":"普密蓬水电站励磁系统预防性维修优化","authors":"S. Pansrisu, S. Premrudeepreechacharn","doi":"10.1109/ESD.2010.5598770","DOIUrl":null,"url":null,"abstract":"Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.","PeriodicalId":272782,"journal":{"name":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Preventive maintenance optimization for excitation system of bhumibol hydro power plant\",\"authors\":\"S. Pansrisu, S. Premrudeepreechacharn\",\"doi\":\"10.1109/ESD.2010.5598770\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.\",\"PeriodicalId\":272782,\"journal\":{\"name\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESD.2010.5598770\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESD.2010.5598770","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.