普密蓬水电站励磁系统预防性维修优化

S. Pansrisu, S. Premrudeepreechacharn
{"title":"普密蓬水电站励磁系统预防性维修优化","authors":"S. Pansrisu, S. Premrudeepreechacharn","doi":"10.1109/ESD.2010.5598770","DOIUrl":null,"url":null,"abstract":"Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.","PeriodicalId":272782,"journal":{"name":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Preventive maintenance optimization for excitation system of bhumibol hydro power plant\",\"authors\":\"S. Pansrisu, S. Premrudeepreechacharn\",\"doi\":\"10.1109/ESD.2010.5598770\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.\",\"PeriodicalId\":272782,\"journal\":{\"name\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESD.2010.5598770\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESD.2010.5598770","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

电厂的可靠性与系统设备维护任务的执行方式密切相关。从普密蓬水电站2002-2006年的运行记录来看,电站的计划外停运时数是变化的。电厂的励磁系统是影响机组运行的主要因素。因此,为了提高电厂的可靠性,必须对励磁系统的维护制度进行修改。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002–2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Result of road lighting energy saving project implementation through the use of public private partnership scheme Experimental study on heat transfer and pressure drop in a channel with triangular V-ribs Shihmen sediment prevention diversion tunnel planning and design Potential of thermoelectric power from bagasse by sugar mills of Pakistan Multi-scenarios of effective demand side management in Navanakorn industrial promotion zone
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1