{"title":"改进基于实际优先级因素的测试用例优先级","authors":"Md. Hasan Mahmood, M. S. Hosain","doi":"10.1109/ICSESS.2017.8343055","DOIUrl":null,"url":null,"abstract":"Test case prioritization involves prioritized the test cases for regression testing which improve the effectiveness of the testing process. By improving test case scheduling we can optimize time and cost as well as can produce better tested products. There are a number of methods to do prioritized test cases but not that effective or practical for the real-life large commercial systems. Most of the technique deals with finding defects or covering more test cases. In this paper, we will extend the previous work to incorporate real life practical aspects to schedule test cases. This will cover most of the businesses functionally based on the practical aspects. This approach covers more business area and ensure more defects. By prioritized test cases with this technique we will cover most important business functionally with less number of test cases.","PeriodicalId":179815,"journal":{"name":"2017 8th IEEE International Conference on Software Engineering and Service Science (ICSESS)","volume":"323 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Improving test case prioritization based on practical priority factors\",\"authors\":\"Md. Hasan Mahmood, M. S. Hosain\",\"doi\":\"10.1109/ICSESS.2017.8343055\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Test case prioritization involves prioritized the test cases for regression testing which improve the effectiveness of the testing process. By improving test case scheduling we can optimize time and cost as well as can produce better tested products. There are a number of methods to do prioritized test cases but not that effective or practical for the real-life large commercial systems. Most of the technique deals with finding defects or covering more test cases. In this paper, we will extend the previous work to incorporate real life practical aspects to schedule test cases. This will cover most of the businesses functionally based on the practical aspects. This approach covers more business area and ensure more defects. By prioritized test cases with this technique we will cover most important business functionally with less number of test cases.\",\"PeriodicalId\":179815,\"journal\":{\"name\":\"2017 8th IEEE International Conference on Software Engineering and Service Science (ICSESS)\",\"volume\":\"323 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 8th IEEE International Conference on Software Engineering and Service Science (ICSESS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSESS.2017.8343055\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 8th IEEE International Conference on Software Engineering and Service Science (ICSESS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSESS.2017.8343055","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Improving test case prioritization based on practical priority factors
Test case prioritization involves prioritized the test cases for regression testing which improve the effectiveness of the testing process. By improving test case scheduling we can optimize time and cost as well as can produce better tested products. There are a number of methods to do prioritized test cases but not that effective or practical for the real-life large commercial systems. Most of the technique deals with finding defects or covering more test cases. In this paper, we will extend the previous work to incorporate real life practical aspects to schedule test cases. This will cover most of the businesses functionally based on the practical aspects. This approach covers more business area and ensure more defects. By prioritized test cases with this technique we will cover most important business functionally with less number of test cases.