建设项目管理成熟度模型框架研究

Zhai Feng-yong, Li Renhui
{"title":"建设项目管理成熟度模型框架研究","authors":"Zhai Feng-yong, Li Renhui","doi":"10.1109/ICSSSM.2007.4280298","DOIUrl":null,"url":null,"abstract":"In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.","PeriodicalId":153603,"journal":{"name":"2007 International Conference on Service Systems and Service Management","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Study on Framework of Construction Project Management Maturity Model\",\"authors\":\"Zhai Feng-yong, Li Renhui\",\"doi\":\"10.1109/ICSSSM.2007.4280298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.\",\"PeriodicalId\":153603,\"journal\":{\"name\":\"2007 International Conference on Service Systems and Service Management\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-06-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 International Conference on Service Systems and Service Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSSSM.2007.4280298\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2007.4280298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

近年来,项目管理成熟度模型(Project Management Maturity Model, PMMM,简称PM3)在项目管理领域受到越来越多的关注,其目的是提高项目的“过程成熟度”。然而,PM3在建筑行业的应用和研究很少,而项目管理是建筑行业的重要特征。本文根据通用PM3的原理和一般建设项目的过程,构建了建设项目管理成熟度模型(CPM3)。提出了CPM3的5个成熟度等级及其结构。此外,还探讨了建设项目管理成熟度的评价与改进方法。在评价分析的同时,还进行了基于问卷的实证研究。并对CPM3的实施及相关问题进行了讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Study on Framework of Construction Project Management Maturity Model
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Game Analysis about Utility Pricing of Power Plant Based on the Coordination between Power and Environment Collaborative Analysis on Modern Logistics and Finance The Relationship between Perceived Performance and Consumer Satisfaction: The Moderating Role of Price, Price Consciousness and Conspicuous Consumption The Impact of HRMIS on Enterprise Social Capital: a View from Social Network Research of Combinative Incentives of Manager based on Services Innovation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1