35kv及以上变电站6- 10kv用户外供电可靠性评价

A. Varganova, A. S. Irihov, A. Shemetov
{"title":"35kv及以上变电站6- 10kv用户外供电可靠性评价","authors":"A. Varganova, A. S. Irihov, A. Shemetov","doi":"10.1109/UralCon49858.2020.9216312","DOIUrl":null,"url":null,"abstract":"Assessing the reliability of external power supply is an important step in choosing a circuit for a high-voltage switchgear at main step-down substations. The main task in calculating the reliability indicators is to estimate the recovery duration and the failure flow parameter in order to determine the likely economic damage, which also depends on the size and type of load. This paper proposes a unification of calculations for assessing the reliability of external power supply circuits of the main step-down substations with a voltage of 35 kV and higher, which makes it possible to speed up the process of choosing the optimal switchgear circuit and evaluate the damage from a power outage. The developed algorithm makes it possible to determine, based on the technical specifications for designing, the value of the failure flow parameter and recovery time for switchgear circuits, converting them into a structural-analytical circuit that reflects the logic of the circuit in heavy duty mode (including redundancy of individual circuits, bypass, bus junction and section switches) In the calculation, an analytical method was used, based on the equivalentization of the structural scheme using the forced downtime coefficients. The work is carried out with the financial support of a grant from the President of the Russian Federation for young scientists - candidates of sciences MK-939.2019.8.","PeriodicalId":230353,"journal":{"name":"2020 International Ural Conference on Electrical Power Engineering (UralCon)","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"External Power Supply Reliability Assessment to Consumers of 6-10 kV of the Substations of 35 kV and Higher\",\"authors\":\"A. Varganova, A. S. Irihov, A. Shemetov\",\"doi\":\"10.1109/UralCon49858.2020.9216312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Assessing the reliability of external power supply is an important step in choosing a circuit for a high-voltage switchgear at main step-down substations. The main task in calculating the reliability indicators is to estimate the recovery duration and the failure flow parameter in order to determine the likely economic damage, which also depends on the size and type of load. This paper proposes a unification of calculations for assessing the reliability of external power supply circuits of the main step-down substations with a voltage of 35 kV and higher, which makes it possible to speed up the process of choosing the optimal switchgear circuit and evaluate the damage from a power outage. The developed algorithm makes it possible to determine, based on the technical specifications for designing, the value of the failure flow parameter and recovery time for switchgear circuits, converting them into a structural-analytical circuit that reflects the logic of the circuit in heavy duty mode (including redundancy of individual circuits, bypass, bus junction and section switches) In the calculation, an analytical method was used, based on the equivalentization of the structural scheme using the forced downtime coefficients. The work is carried out with the financial support of a grant from the President of the Russian Federation for young scientists - candidates of sciences MK-939.2019.8.\",\"PeriodicalId\":230353,\"journal\":{\"name\":\"2020 International Ural Conference on Electrical Power Engineering (UralCon)\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Ural Conference on Electrical Power Engineering (UralCon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UralCon49858.2020.9216312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Ural Conference on Electrical Power Engineering (UralCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UralCon49858.2020.9216312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

外电源可靠性评估是主降压变电站高压开关柜电路选择的重要环节。可靠性指标计算的主要任务是估计恢复时间和故障流参数,以确定可能的经济损失,这也取决于负载的大小和类型。本文提出了35kv及以上主降压变电站外供电电路可靠性评估的统一计算方法,从而加快了选择最佳开关柜电路和评估停电损失的过程。所开发的算法可以根据设计技术规范确定开关柜电路的故障流量参数和恢复时间的值,并将其转换为反映电路在重负荷模式下(包括单个电路、旁路、母线结和分段开关的冗余)逻辑的结构解析电路。基于强制停机系数对结构方案进行等效化。这项工作是在俄罗斯联邦总统为青年科学家(科学候选人MK-939.2019.8)提供的资助下进行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
External Power Supply Reliability Assessment to Consumers of 6-10 kV of the Substations of 35 kV and Higher
Assessing the reliability of external power supply is an important step in choosing a circuit for a high-voltage switchgear at main step-down substations. The main task in calculating the reliability indicators is to estimate the recovery duration and the failure flow parameter in order to determine the likely economic damage, which also depends on the size and type of load. This paper proposes a unification of calculations for assessing the reliability of external power supply circuits of the main step-down substations with a voltage of 35 kV and higher, which makes it possible to speed up the process of choosing the optimal switchgear circuit and evaluate the damage from a power outage. The developed algorithm makes it possible to determine, based on the technical specifications for designing, the value of the failure flow parameter and recovery time for switchgear circuits, converting them into a structural-analytical circuit that reflects the logic of the circuit in heavy duty mode (including redundancy of individual circuits, bypass, bus junction and section switches) In the calculation, an analytical method was used, based on the equivalentization of the structural scheme using the forced downtime coefficients. The work is carried out with the financial support of a grant from the President of the Russian Federation for young scientists - candidates of sciences MK-939.2019.8.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Statistical Information for Data Trend Forecasting Analysis of Power Oscillations Parameters in Autonomous Electrical Complexes Using the Method of Customization Charts Designing System for Cleaning the Surface of Solar Modules from Dust Pollution Analysis of Power Quality and Pumping Units Operation's Optimization Device for Data Communication along Power Lines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1