提出了一种用于实时变形监测的早期GNSS预警系统的建立方法

M. Qafisheh, Angel Martin, R. Capilla
{"title":"提出了一种用于实时变形监测的早期GNSS预警系统的建立方法","authors":"M. Qafisheh, Angel Martin, R. Capilla","doi":"10.4995/cigeo2021.2021.12691","DOIUrl":null,"url":null,"abstract":"Early Warning System (EWS) for monitoring megastructures deformation, natural hazards, earthquakes, and landslidescan prevent economic and life losses. Nowadays, Real-Time Precise Point Positioning (RT-PPP) plays a vital role in thisdomain since it relies on precise real-time measurements derived from a single receiver, provides real-time monitoring andglobal coverage. Nevertheless, RT-PPP measurements and methodology is very sensitive to outliers in products, latenciesand changes in the constellation geometry. Consequently, there are long initialization periods, losses of convergence anddifferent noise sources, with a high impact on the warning system's availability or even led out to initiate false warnings.This study presents the first experiment to propose a methodology that can help the decision-makers confirm the warningbased on the probability of the detected movement by using machine learning classification models. For this, in the firstexperiment, a laser engraving machine device was modified to simulate deformations. A control unit will be designed basedon open-source software, Python libraries are implemented, and the G programming language used to control the devicemotions. All this research will be the background on which the early warning service will be developed.","PeriodicalId":145404,"journal":{"name":"Proceedings - 3rd Congress in Geomatics Engineering - CIGeo","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PROPOSED METHODOLOGY FOR ESTABLISHING AN EARLY GNSS WARNING SYSTEM FOR REAL-TIME DEFORMATION MONITORING\",\"authors\":\"M. Qafisheh, Angel Martin, R. Capilla\",\"doi\":\"10.4995/cigeo2021.2021.12691\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Early Warning System (EWS) for monitoring megastructures deformation, natural hazards, earthquakes, and landslidescan prevent economic and life losses. Nowadays, Real-Time Precise Point Positioning (RT-PPP) plays a vital role in thisdomain since it relies on precise real-time measurements derived from a single receiver, provides real-time monitoring andglobal coverage. Nevertheless, RT-PPP measurements and methodology is very sensitive to outliers in products, latenciesand changes in the constellation geometry. Consequently, there are long initialization periods, losses of convergence anddifferent noise sources, with a high impact on the warning system's availability or even led out to initiate false warnings.This study presents the first experiment to propose a methodology that can help the decision-makers confirm the warningbased on the probability of the detected movement by using machine learning classification models. For this, in the firstexperiment, a laser engraving machine device was modified to simulate deformations. A control unit will be designed basedon open-source software, Python libraries are implemented, and the G programming language used to control the devicemotions. All this research will be the background on which the early warning service will be developed.\",\"PeriodicalId\":145404,\"journal\":{\"name\":\"Proceedings - 3rd Congress in Geomatics Engineering - CIGeo\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings - 3rd Congress in Geomatics Engineering - CIGeo\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4995/cigeo2021.2021.12691\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings - 3rd Congress in Geomatics Engineering - CIGeo","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4995/cigeo2021.2021.12691","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

早期预警系统(EWS)用于监测大型建筑物变形、自然灾害、地震和山体滑坡,可以防止经济和生命损失。如今,实时精确点定位(RT-PPP)在这一领域发挥着至关重要的作用,因为它依赖于来自单个接收器的精确实时测量,提供实时监控和全球覆盖。然而,RT-PPP测量和方法对产品的异常值、潜伏期和星座几何形状的变化非常敏感。因此,初始化周期长,收敛损失大,噪声源不同,对预警系统的可用性影响很大,甚至导致误报。本研究首次提出了一种方法,该方法可以帮助决策者通过使用机器学习分类模型,根据检测到的运动的概率来确认警告。为此,在第一次实验中,对激光雕刻机装置进行了修改以模拟变形。将基于开源软件设计控制单元,实现Python库,并使用G编程语言控制设备情绪。所有这些研究都将成为开展预警服务的背景。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PROPOSED METHODOLOGY FOR ESTABLISHING AN EARLY GNSS WARNING SYSTEM FOR REAL-TIME DEFORMATION MONITORING
Early Warning System (EWS) for monitoring megastructures deformation, natural hazards, earthquakes, and landslidescan prevent economic and life losses. Nowadays, Real-Time Precise Point Positioning (RT-PPP) plays a vital role in thisdomain since it relies on precise real-time measurements derived from a single receiver, provides real-time monitoring andglobal coverage. Nevertheless, RT-PPP measurements and methodology is very sensitive to outliers in products, latenciesand changes in the constellation geometry. Consequently, there are long initialization periods, losses of convergence anddifferent noise sources, with a high impact on the warning system's availability or even led out to initiate false warnings.This study presents the first experiment to propose a methodology that can help the decision-makers confirm the warningbased on the probability of the detected movement by using machine learning classification models. For this, in the firstexperiment, a laser engraving machine device was modified to simulate deformations. A control unit will be designed basedon open-source software, Python libraries are implemented, and the G programming language used to control the devicemotions. All this research will be the background on which the early warning service will be developed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COMPARACIÓN DE INDICADORES DE SOSTENIBILIDAD ENTRE ZONAS URBANAS DE ECUADOR Y ESPAÑA EMPLEANDO IMÁGENES SENTINEL 2 MSI UNDERSTANDING VERTICAL GROUND DISPLACEMENT FROM P-SBAS USING GETIS-ORD GI* STATISTIC ANÁLISIS COMPARATIVO DE SOFTWARE PARA OBTENER MDT CON FOTOGRAMETRÍA RPAS ARQUITECTURA NEURONAL PARA PREDICCIÓN DE RADIACIÓN SOLAR EN BASE A VARIABLES METEOROLÓGICAS MONITORING CRITICAL INFRASTRUCTURE EXPOSED TO ANTHROPOGENIC AND NATURAL HAZARDS USING SATELLITE RADAR INTERFEROMETRY
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1