{"title":"重型设备挖掘地点的工作和选举分析(案例研究:Pembangunana高速公路项目三宝垄堆a€“每周包裹2 a€Sta“26 + 10 + 394 a€704)","authors":"Chairunnisa Amin","doi":"10.33603/jki.v10i2.7415","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":126649,"journal":{"name":"Jurnal Konstruksi dan Infrastruktur","volume":"186 15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISA PEMILIHAN ALAT BERAT PADA PEKERJAAN GALIAN DAN TIMBUNAN (Studi Kasus : Proyek Pembangunana Jalan Tol Semarang – Demak Paket 2 – Sta 10 + 394 – 26 + 704)\",\"authors\":\"Chairunnisa Amin\",\"doi\":\"10.33603/jki.v10i2.7415\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":126649,\"journal\":{\"name\":\"Jurnal Konstruksi dan Infrastruktur\",\"volume\":\"186 15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Konstruksi dan Infrastruktur\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jki.v10i2.7415\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Konstruksi dan Infrastruktur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jki.v10i2.7415","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
ANALISA PEMILIHAN ALAT BERAT PADA PEKERJAAN GALIAN DAN TIMBUNAN (Studi Kasus : Proyek Pembangunana Jalan Tol Semarang – Demak Paket 2 – Sta 10 + 394 – 26 + 704)