提出新的UFLS方案来模拟伊朗电网管理公司(IGMC)的约束,考虑三个主要方面:减载、频率和地理分布

Mahdi Samadi, Ali Ghaznavi, M. Hajiabadi, I. Nikoofekr, M. Yeylaghi
{"title":"提出新的UFLS方案来模拟伊朗电网管理公司(IGMC)的约束,考虑三个主要方面:减载、频率和地理分布","authors":"Mahdi Samadi, Ali Ghaznavi, M. Hajiabadi, I. Nikoofekr, M. Yeylaghi","doi":"10.1109/PSC49016.2019.9081497","DOIUrl":null,"url":null,"abstract":"In this paper, we have proposed some under-frequency load shedding (UFLS) schemes for implementation in the Khorasan Network. In this regard, we have suggested a new relation to determine the number of substations required for load shedding at each frequency step, using which, the guideline of IGMC is well observed for the UFLS schemes. In the analysis of the proposed schemes, after reviewing the required constraints, their features have been analyzed in terms of three basic aspects: 1.The amount of load shedding at each frequency step; 2.The frequency response and its stability after disturbance (generator or tie-line outage or sudden load increase); 3.The geographical distribution of substations in each scheme; The Khorasan grid was modeled in the DigSilent Power Factory software with all the actual information of loads and power plants as well as the required dynamic parameters to analyze the frequency of the system in the contingency. The results of this study will be highly effective and useful in the quantitative evaluation of UFLS and selecting the optimal schemes.","PeriodicalId":359817,"journal":{"name":"2019 International Power System Conference (PSC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Proposing New UFLS Schemes to Model the Iran Grid management Co. (IGMC) Constraints Considering Three Main Aspects: Load Shedding, Frequency and Geographical Distribution\",\"authors\":\"Mahdi Samadi, Ali Ghaznavi, M. Hajiabadi, I. Nikoofekr, M. Yeylaghi\",\"doi\":\"10.1109/PSC49016.2019.9081497\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we have proposed some under-frequency load shedding (UFLS) schemes for implementation in the Khorasan Network. In this regard, we have suggested a new relation to determine the number of substations required for load shedding at each frequency step, using which, the guideline of IGMC is well observed for the UFLS schemes. In the analysis of the proposed schemes, after reviewing the required constraints, their features have been analyzed in terms of three basic aspects: 1.The amount of load shedding at each frequency step; 2.The frequency response and its stability after disturbance (generator or tie-line outage or sudden load increase); 3.The geographical distribution of substations in each scheme; The Khorasan grid was modeled in the DigSilent Power Factory software with all the actual information of loads and power plants as well as the required dynamic parameters to analyze the frequency of the system in the contingency. The results of this study will be highly effective and useful in the quantitative evaluation of UFLS and selecting the optimal schemes.\",\"PeriodicalId\":359817,\"journal\":{\"name\":\"2019 International Power System Conference (PSC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Power System Conference (PSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PSC49016.2019.9081497\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Power System Conference (PSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSC49016.2019.9081497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在本文中,我们提出了一些低频减载(UFLS)方案来实施呼罗珊网络。在这方面,我们提出了一个新的关系式来确定每个频率步长减载所需的变电站数量,使用该关系式可以很好地观察到IGMC准则对UFLS方案的影响。在对所提方案的分析中,在审查了所需要的约束条件后,从三个基本方面分析了其特征:1。各频率阶的减载量;2.扰动(发电机或联络线中断或负载突然增加)后的频率响应及其稳定性;3.各方案变电站的地理分布;在DigSilent Power Factory软件中对呼罗珊电网进行建模,并获取所有负荷和电厂的实际信息以及所需的动态参数,以分析系统在突发事件中的频率。本文的研究结果对UFLS的定量评价和优化方案的选择具有重要的参考价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Proposing New UFLS Schemes to Model the Iran Grid management Co. (IGMC) Constraints Considering Three Main Aspects: Load Shedding, Frequency and Geographical Distribution
In this paper, we have proposed some under-frequency load shedding (UFLS) schemes for implementation in the Khorasan Network. In this regard, we have suggested a new relation to determine the number of substations required for load shedding at each frequency step, using which, the guideline of IGMC is well observed for the UFLS schemes. In the analysis of the proposed schemes, after reviewing the required constraints, their features have been analyzed in terms of three basic aspects: 1.The amount of load shedding at each frequency step; 2.The frequency response and its stability after disturbance (generator or tie-line outage or sudden load increase); 3.The geographical distribution of substations in each scheme; The Khorasan grid was modeled in the DigSilent Power Factory software with all the actual information of loads and power plants as well as the required dynamic parameters to analyze the frequency of the system in the contingency. The results of this study will be highly effective and useful in the quantitative evaluation of UFLS and selecting the optimal schemes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of PFC Improvement and THD Reduction Achieved by PFC-based Zeta Converter and PWM-Rectifier Optimal Planning of Smart Electric Vehicle Parking lot in the Active Distribution Network Improvement in Voltage Recovery Delay Phenomenon Caused by Air Conditioners Specific Performance Small Signal Modeling and Controller Design of Integrated Bidirectional Converter for PHEVs Small signal stability improvement via coordination of PSS's and SOFC power conditioner by PSO algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1