{"title":"为工业用电需求管理项目制定以性能为中心的维修策略","authors":"H. Groenewald, M. Kleingeld, J. Vosloo","doi":"10.1109/ICUE.2015.7280246","DOIUrl":null,"url":null,"abstract":"Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.","PeriodicalId":251065,"journal":{"name":"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"A performance-centred maintenance strategy for industrial DSM projects\",\"authors\":\"H. Groenewald, M. Kleingeld, J. Vosloo\",\"doi\":\"10.1109/ICUE.2015.7280246\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.\",\"PeriodicalId\":251065,\"journal\":{\"name\":\"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICUE.2015.7280246\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on the Industrial and Commercial Use of Energy (ICUE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICUE.2015.7280246","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A performance-centred maintenance strategy for industrial DSM projects
Underperformance of industrial DSM projects is often caused by a lack of proper maintenance practices. This results in wasted electricity cost-savings opportunities and an increased demand for electricity on the national grid. A solution to the problem of underperforming industrial DSM projects is to apply a performance-centered maintenance (PCM) strategy. The various aspects of the PCM strategy are presented in this paper. It is based on the plan-do-check-act (PDCA) cycle for continuous improvement, which also forms part of the ISO 50001 energy management standard. Results show that the application of the PCM strategy could result in a performance increase of up to 70% when applied to underperforming industrial DSM projects. This proves the value of the PCM strategy to maximise and sustain the performance of industrial DSM projects.