确定钢结构工作坊工作的风险,采用分析条例(AHP)

I. K. H. Wiryasuta, Qurrotus Shofiyah, Wilghis Meilinia Azizah
{"title":"确定钢结构工作坊工作的风险,采用分析条例(AHP)","authors":"I. K. H. Wiryasuta, Qurrotus Shofiyah, Wilghis Meilinia Azizah","doi":"10.57203/jriteks.v1i1.2022.41-47","DOIUrl":null,"url":null,"abstract":"Railway factory PT. Industri Kereta Api (Persero) in Banyuwangi was built by PT. Adhi Karya (Persero) Tbk. as the main contractor. The main construction used in the project is a steel structure (pre-engineered steel building). The work is not free from the emergence of risks, because of the significant weight of the work carried out. Risk cannot be eliminated, but it can be minimised by implementing risk management. One of the risk management processes is risk identification. This research aims to identify the possible risks that can occur, and the category of emergency for the project. Data were collected by distributing questionnaires to four respondents, namely the contractor’s project manager. Furthermore, the data from the questionnaire was processed using the Analytical Hierarchy Process (AHP) method to find the risk weights. The analysis process is continued by assessing the risk level for each sub-risk variable, and the most significant result is considered the dominant risk. The identification resulted in 3 high risks, three medium risks, and 18 low risks. The three most increased risks are as follows: the availability of materials with a weight of 2.581, the transfer of potential senior workers with a weight of 0.989, and changes in the work schedule with a weight of 0.779.","PeriodicalId":107540,"journal":{"name":"Jurnal Riset Teknik Sipil dan Sains","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IDENTIFIKASI RISIKO KONSTRUKSI PADA PEKERJAAN STRUKTUR BAJA WORKSHOP PT. INKA BANYUWANGI DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP)\",\"authors\":\"I. K. H. Wiryasuta, Qurrotus Shofiyah, Wilghis Meilinia Azizah\",\"doi\":\"10.57203/jriteks.v1i1.2022.41-47\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Railway factory PT. Industri Kereta Api (Persero) in Banyuwangi was built by PT. Adhi Karya (Persero) Tbk. as the main contractor. The main construction used in the project is a steel structure (pre-engineered steel building). The work is not free from the emergence of risks, because of the significant weight of the work carried out. Risk cannot be eliminated, but it can be minimised by implementing risk management. One of the risk management processes is risk identification. This research aims to identify the possible risks that can occur, and the category of emergency for the project. Data were collected by distributing questionnaires to four respondents, namely the contractor’s project manager. Furthermore, the data from the questionnaire was processed using the Analytical Hierarchy Process (AHP) method to find the risk weights. The analysis process is continued by assessing the risk level for each sub-risk variable, and the most significant result is considered the dominant risk. The identification resulted in 3 high risks, three medium risks, and 18 low risks. The three most increased risks are as follows: the availability of materials with a weight of 2.581, the transfer of potential senior workers with a weight of 0.989, and changes in the work schedule with a weight of 0.779.\",\"PeriodicalId\":107540,\"journal\":{\"name\":\"Jurnal Riset Teknik Sipil dan Sains\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Riset Teknik Sipil dan Sains\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.57203/jriteks.v1i1.2022.41-47\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Teknik Sipil dan Sains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.57203/jriteks.v1i1.2022.41-47","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

位于Banyuwangi的铁路工厂PT. Industri Kereta Api (Persero)由PT. Adhi Karya (Persero) Tbk建造。作为总承包商。本工程主要采用钢结构(预制钢结构建筑)。由于所开展的工作的重要性,这项工作并非没有出现风险。风险无法消除,但可以通过实施风险管理将其最小化。风险管理过程之一是风险识别。本研究旨在识别可能发生的风险,以及项目的紧急情况类别。收集数据的方式是向四名受访者发放问卷,即承包商的项目经理。采用层次分析法(AHP)对问卷数据进行处理,确定风险权重。分析过程通过评估每个子风险变量的风险水平继续进行,最显著的结果被认为是主导风险。识别出3个高风险、3个中等风险和18个低风险。增加最多的三个风险分别是:材料可得性(权重为2.581)、潜在高级工人转移(权重为0.989)和工作进度变化(权重为0.779)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
IDENTIFIKASI RISIKO KONSTRUKSI PADA PEKERJAAN STRUKTUR BAJA WORKSHOP PT. INKA BANYUWANGI DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP)
Railway factory PT. Industri Kereta Api (Persero) in Banyuwangi was built by PT. Adhi Karya (Persero) Tbk. as the main contractor. The main construction used in the project is a steel structure (pre-engineered steel building). The work is not free from the emergence of risks, because of the significant weight of the work carried out. Risk cannot be eliminated, but it can be minimised by implementing risk management. One of the risk management processes is risk identification. This research aims to identify the possible risks that can occur, and the category of emergency for the project. Data were collected by distributing questionnaires to four respondents, namely the contractor’s project manager. Furthermore, the data from the questionnaire was processed using the Analytical Hierarchy Process (AHP) method to find the risk weights. The analysis process is continued by assessing the risk level for each sub-risk variable, and the most significant result is considered the dominant risk. The identification resulted in 3 high risks, three medium risks, and 18 low risks. The three most increased risks are as follows: the availability of materials with a weight of 2.581, the transfer of potential senior workers with a weight of 0.989, and changes in the work schedule with a weight of 0.779.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH PENAMBAHAN ABU SABUT KELAPA TERHADAP NILAI CBR TIDAK TERENDAM PADA TANAH LEMPUNG DI DESA PESUCEN KECAMATAN KALIPURO PERHITUNGAN KAPASITAS LIFT SEBAGAI SARANA TRANSPORTASI VERTIKAL PADA GEDUNG BERTINGKAT INSPEKSI KESELAMATAN JALAN DI RUAS JALAN GATOT SUBROTO, KOTA TEGAL, JAWA TENGAH FAKTOR-FAKTOR PENYEBAB KEGAGALAN KONTRAKTOR DALAM EVALUASI PENAWARAN DI KABUPATEN BANYUWANGI EVALUASI DAYA DUKUNG DAN PENURUNAN BORED PILE BERDASARKAN HASIL PENGUJIAN PDA (PEMBANGUNAN UNIVERSITAS KH. ABDUL WAHAB HASBULLAH JOMBANG)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1