{"title":"捷运环形轨道的分析与设计","authors":"B. Prayoga, Sumarman Sumarman, Ingrid Multi Rezeki","doi":"10.33603/jgst.v2i1.1168","DOIUrl":null,"url":null,"abstract":"ABSTRACT Jakarta MRT was one of solution to solve the traffic jam in Jakarta. There are two physical constructions which serves as the main infrastructure of Jakarta MRT, elevated and underground track. It is not only the first MRT in Indonesia but also, the first large-scale underground works in Jakarta. The physical construction of underground structure became an interesting case to be researched. The use of precast concrete tunnel lining (PCTL) segment was necessary to hold the loads and to provide the space for underground track. In designing the tunnel lining, calculation of the member forces and safety check are necessary to determine the amount of rebar and the dimension, and also to know the value of safety, so, the tunnel lining can be used as the function. According to the guidelines for the design of shield tunnel lining issued by International Tunnelling Association (ITA, 2000), the member forces of tunnel lining could be calculated by (1) Elastic Equation Method, (2) Bedded Frame Method, (3) Finite Element Method (FEM). In this research, the member forces of tunnel lining are calculated using analytical method, without computer program. Therefore, method (1) is used to know the value of each member forces to be used for designing the reinforcement bars. The member forces are analysed for tunnel lining with 6.8 m outer diameters, 1.5 m width and 0.25 m thickness in Jakarta MRT CP106 (Bundaran HI). Based on research which has been done, obtained the maximum values for positive bending moment in the tunnel crown (θ = 0°) is 101.352 kN.m, for negative bending moment in the tunnel axis (θ = 90°) is -281.394 kN.m. In contrary, the value of maximum axial force is in the tunnel axis (θ = 90°) is 1094.538 kN, for minimum axial force is in the tunnel crown (θ = 0°) is 904.674 kN. While, the value of maximum shear force is in (θ = 120°) is 118.740 kN, for minimum shear force is in (θ = 30°) is -66.866 kN. The result of safety checks against member forces in tunnel lining, the value of nominal bending moment multiplied by reduction factor (ϕ · Mn) is 296.263 kN.m, bigger than the value of ultimate bending moment (Mu) is 281.394 kN.m. For the value of nominal shear force multiplied by reduction factor (ϕ · Vn) is 136.095 kN, bigger than the value of ultimate shear force (Vu) is 118.740 kN. While, safety check against thrust force of shield jack obtained the value of maximum compressive stress of concrete segment (𝜎𝑐) is 5.016 MN/m2, bigger than the value of allowable stress (𝜎𝑐𝑎) is 16 MN/m2. Keywords: Jakarta MRT, underground, tunnel lining, member forces, Elastic Equation Method.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALYSIS AND DESIGN OF MRT’S CIRCULAR TU\",\"authors\":\"B. Prayoga, Sumarman Sumarman, Ingrid Multi Rezeki\",\"doi\":\"10.33603/jgst.v2i1.1168\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Jakarta MRT was one of solution to solve the traffic jam in Jakarta. There are two physical constructions which serves as the main infrastructure of Jakarta MRT, elevated and underground track. It is not only the first MRT in Indonesia but also, the first large-scale underground works in Jakarta. The physical construction of underground structure became an interesting case to be researched. The use of precast concrete tunnel lining (PCTL) segment was necessary to hold the loads and to provide the space for underground track. In designing the tunnel lining, calculation of the member forces and safety check are necessary to determine the amount of rebar and the dimension, and also to know the value of safety, so, the tunnel lining can be used as the function. According to the guidelines for the design of shield tunnel lining issued by International Tunnelling Association (ITA, 2000), the member forces of tunnel lining could be calculated by (1) Elastic Equation Method, (2) Bedded Frame Method, (3) Finite Element Method (FEM). In this research, the member forces of tunnel lining are calculated using analytical method, without computer program. Therefore, method (1) is used to know the value of each member forces to be used for designing the reinforcement bars. The member forces are analysed for tunnel lining with 6.8 m outer diameters, 1.5 m width and 0.25 m thickness in Jakarta MRT CP106 (Bundaran HI). Based on research which has been done, obtained the maximum values for positive bending moment in the tunnel crown (θ = 0°) is 101.352 kN.m, for negative bending moment in the tunnel axis (θ = 90°) is -281.394 kN.m. In contrary, the value of maximum axial force is in the tunnel axis (θ = 90°) is 1094.538 kN, for minimum axial force is in the tunnel crown (θ = 0°) is 904.674 kN. While, the value of maximum shear force is in (θ = 120°) is 118.740 kN, for minimum shear force is in (θ = 30°) is -66.866 kN. The result of safety checks against member forces in tunnel lining, the value of nominal bending moment multiplied by reduction factor (ϕ · Mn) is 296.263 kN.m, bigger than the value of ultimate bending moment (Mu) is 281.394 kN.m. For the value of nominal shear force multiplied by reduction factor (ϕ · Vn) is 136.095 kN, bigger than the value of ultimate shear force (Vu) is 118.740 kN. While, safety check against thrust force of shield jack obtained the value of maximum compressive stress of concrete segment (𝜎𝑐) is 5.016 MN/m2, bigger than the value of allowable stress (𝜎𝑐𝑎) is 16 MN/m2. Keywords: Jakarta MRT, underground, tunnel lining, member forces, Elastic Equation Method.\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jgst.v2i1.1168\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v2i1.1168","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

雅加达捷运是解决雅加达交通拥堵的解决方案之一。雅加达捷运的主要基础设施有两个实体结构,高架轨道和地下轨道。这不仅是印尼第一条捷运,也是雅加达第一个大型地下工程。地下结构的物理构造成为一个有趣的研究案例。使用预制混凝土隧道衬砌(PCTL)管片是必要的,以保持荷载和提供地下轨道的空间。在进行隧道衬砌设计时,需要进行构件的受力计算和安全校核,以确定钢筋的用量和尺寸,并了解其安全值,从而可以作为隧道衬砌的功能。根据国际隧道协会(ITA, 2000)发布的盾构隧道衬砌设计指南,隧道衬砌构件的受力可采用(1)弹性方程法、(2)层架法、(3)有限元法进行计算。本研究采用解析法计算隧道衬砌构件受力,没有编制计算机程序。因此,采用方法(1)可知各构件的受力值,用于设计配筋。分析了雅加达MRT CP106 (Bundaran HI)隧道衬砌的成员力,衬砌外径6.8 m,宽度1.5 m,厚度0.25 m。在此基础上,得到了隧道顶部(θ = 0°)正弯矩的最大值为101.352 kN。m,隧道轴线(θ = 90°)负弯矩为-281.394 kN.m。反之,隧道轴线(θ = 90°)处的最大轴向力为1094.538 kN,隧道顶部(θ = 0°)处的最小轴向力为904.674 kN。而在(θ = 120°)处的最大剪力值为118.740 kN,在(θ = 30°)处的最小剪力值为-66.866 kN。对隧道衬砌构件受力进行安全校核,公称弯矩乘以折减系数φ·Mn为296.263 kN。m,大于极限弯矩Mu的值为281.394 kN.m。其中标称剪切力乘以折减系数(φ·Vn)的值为136.095 kN,大于极限剪切力(Vu)的值为118.740 kN。对盾构千顶推力进行安全校核,得到混凝土段最大压应力值(φ𝑐)为5.016 MN/m2,大于许用应力值(φ𝑐𝑎)为16 MN/m2。关键词:雅加达地铁,地下,隧道衬砌,构件力,弹性方程法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALYSIS AND DESIGN OF MRT’S CIRCULAR TU
ABSTRACT Jakarta MRT was one of solution to solve the traffic jam in Jakarta. There are two physical constructions which serves as the main infrastructure of Jakarta MRT, elevated and underground track. It is not only the first MRT in Indonesia but also, the first large-scale underground works in Jakarta. The physical construction of underground structure became an interesting case to be researched. The use of precast concrete tunnel lining (PCTL) segment was necessary to hold the loads and to provide the space for underground track. In designing the tunnel lining, calculation of the member forces and safety check are necessary to determine the amount of rebar and the dimension, and also to know the value of safety, so, the tunnel lining can be used as the function. According to the guidelines for the design of shield tunnel lining issued by International Tunnelling Association (ITA, 2000), the member forces of tunnel lining could be calculated by (1) Elastic Equation Method, (2) Bedded Frame Method, (3) Finite Element Method (FEM). In this research, the member forces of tunnel lining are calculated using analytical method, without computer program. Therefore, method (1) is used to know the value of each member forces to be used for designing the reinforcement bars. The member forces are analysed for tunnel lining with 6.8 m outer diameters, 1.5 m width and 0.25 m thickness in Jakarta MRT CP106 (Bundaran HI). Based on research which has been done, obtained the maximum values for positive bending moment in the tunnel crown (θ = 0°) is 101.352 kN.m, for negative bending moment in the tunnel axis (θ = 90°) is -281.394 kN.m. In contrary, the value of maximum axial force is in the tunnel axis (θ = 90°) is 1094.538 kN, for minimum axial force is in the tunnel crown (θ = 0°) is 904.674 kN. While, the value of maximum shear force is in (θ = 120°) is 118.740 kN, for minimum shear force is in (θ = 30°) is -66.866 kN. The result of safety checks against member forces in tunnel lining, the value of nominal bending moment multiplied by reduction factor (ϕ · Mn) is 296.263 kN.m, bigger than the value of ultimate bending moment (Mu) is 281.394 kN.m. For the value of nominal shear force multiplied by reduction factor (ϕ · Vn) is 136.095 kN, bigger than the value of ultimate shear force (Vu) is 118.740 kN. While, safety check against thrust force of shield jack obtained the value of maximum compressive stress of concrete segment (𝜎𝑐) is 5.016 MN/m2, bigger than the value of allowable stress (𝜎𝑐𝑎) is 16 MN/m2. Keywords: Jakarta MRT, underground, tunnel lining, member forces, Elastic Equation Method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1