{"title":"故障条件下中低压有功配电网的临时孤岛运行","authors":"F. Amadei, A. Cerretti, M. Coppo, P. Mattavelli, R. Sgarbossa, R. Turri","doi":"10.1109/UPEC.2014.6934762","DOIUrl":null,"url":null,"abstract":"In the last twenty years the Distributed Generation (DG) increased till a high level that introduced several issues to the classical management system of distribution networks. In many countries different technical rules have been introduced in order to integrate the DG units in the medium voltage (MV) and low voltage (LV) distribution network. New standards state requirements for all generators, included inverter based ones, imposing a Fault Ride Through (FRT) philosophy and new active and reactive power regulation actions with the aim of maintaining the transmission system stability at the level it was with traditional rotating generators, or even increasing it. These technical rules may not be fully compliant with the automatic reclosing cycle usually performed from the CB at the beginning of MV feeders and/or with the automatic selection procedure of faulty section selection and supply restore to healthy ones. In this paper the effects of DG units connected at MV and LV voltage level in relation to different fault conditions are analysed. The possibility of temporary uncontrolled islanded operations are investigated in order to evaluate the role of new Standards or Regulatory or Law requirements in the automatic reclosing procedure and MV network automation.","PeriodicalId":414838,"journal":{"name":"2014 49th International Universities Power Engineering Conference (UPEC)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Temporary islanding operations of MV/LV active distribution networks under fault conditions\",\"authors\":\"F. Amadei, A. Cerretti, M. Coppo, P. Mattavelli, R. Sgarbossa, R. Turri\",\"doi\":\"10.1109/UPEC.2014.6934762\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the last twenty years the Distributed Generation (DG) increased till a high level that introduced several issues to the classical management system of distribution networks. In many countries different technical rules have been introduced in order to integrate the DG units in the medium voltage (MV) and low voltage (LV) distribution network. New standards state requirements for all generators, included inverter based ones, imposing a Fault Ride Through (FRT) philosophy and new active and reactive power regulation actions with the aim of maintaining the transmission system stability at the level it was with traditional rotating generators, or even increasing it. These technical rules may not be fully compliant with the automatic reclosing cycle usually performed from the CB at the beginning of MV feeders and/or with the automatic selection procedure of faulty section selection and supply restore to healthy ones. In this paper the effects of DG units connected at MV and LV voltage level in relation to different fault conditions are analysed. The possibility of temporary uncontrolled islanded operations are investigated in order to evaluate the role of new Standards or Regulatory or Law requirements in the automatic reclosing procedure and MV network automation.\",\"PeriodicalId\":414838,\"journal\":{\"name\":\"2014 49th International Universities Power Engineering Conference (UPEC)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 49th International Universities Power Engineering Conference (UPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2014.6934762\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 49th International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2014.6934762","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

近二十年来,分布式发电(DG)发展到一个很高的水平,给传统的配电网管理系统带来了一些问题。为了将DG机组整合到中压和低压配电网中,许多国家都引入了不同的技术规则。新标准规定了对所有发电机的要求,包括基于逆变器的发电机,强加了故障穿越(FRT)理念和新的有功和无功调节措施,目的是将输电系统的稳定性保持在传统旋转发电机的水平上,甚至提高其稳定性。这些技术规则可能不完全符合通常在中压馈线开始时从CB执行的自动重合闸循环和/或故障段选择和供电恢复到健康段的自动选择程序。本文分析了中、低压两级直流机组在不同故障条件下的作用。为了评估新标准或法规或法律要求在自动重合闸程序和中压网络自动化中的作用,研究了临时不受控制的孤岛操作的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Temporary islanding operations of MV/LV active distribution networks under fault conditions
In the last twenty years the Distributed Generation (DG) increased till a high level that introduced several issues to the classical management system of distribution networks. In many countries different technical rules have been introduced in order to integrate the DG units in the medium voltage (MV) and low voltage (LV) distribution network. New standards state requirements for all generators, included inverter based ones, imposing a Fault Ride Through (FRT) philosophy and new active and reactive power regulation actions with the aim of maintaining the transmission system stability at the level it was with traditional rotating generators, or even increasing it. These technical rules may not be fully compliant with the automatic reclosing cycle usually performed from the CB at the beginning of MV feeders and/or with the automatic selection procedure of faulty section selection and supply restore to healthy ones. In this paper the effects of DG units connected at MV and LV voltage level in relation to different fault conditions are analysed. The possibility of temporary uncontrolled islanded operations are investigated in order to evaluate the role of new Standards or Regulatory or Law requirements in the automatic reclosing procedure and MV network automation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transposing phasor equation into instantaneous values equations using Hilbert transform Optimal design of a hybrid distributed generation system Modelling of reduced GB transmission system in PSCAD/EMTDC Medium-voltage cable inductive coupling to metallic pipelines: A comprehensive study UPS system: How can future technology and topology improve the energy efficiency in data centers?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1