莱莫洛1号石坝

J. C. Boyle, W. R. Barrows
{"title":"莱莫洛1号石坝","authors":"J. C. Boyle, W. R. Barrows","doi":"10.1061/JPWEAM.0000255","DOIUrl":null,"url":null,"abstract":"It is 120 ft high with 775 ft crest length; construction is of deck type with reinforced concrete deck; dam is of interest primarily because its north abutment was founded on soil consisting of mixture of old talus, ancient streambed material and clay, which is unique solution for deck type rockfill dam.","PeriodicalId":136288,"journal":{"name":"Journal of the Power Division","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1959-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Lemolo No. 1 Rockfill Dam\",\"authors\":\"J. C. Boyle, W. R. Barrows\",\"doi\":\"10.1061/JPWEAM.0000255\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is 120 ft high with 775 ft crest length; construction is of deck type with reinforced concrete deck; dam is of interest primarily because its north abutment was founded on soil consisting of mixture of old talus, ancient streambed material and clay, which is unique solution for deck type rockfill dam.\",\"PeriodicalId\":136288,\"journal\":{\"name\":\"Journal of the Power Division\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1959-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Power Division\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/JPWEAM.0000255\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Power Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JPWEAM.0000255","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

它高120英尺,顶长775英尺;结构为甲板式,钢筋混凝土甲板;大坝之所以引人注目,主要是因为它的北坝是建立在由旧土、古河床材料和粘土混合组成的土壤上的,这是甲板式堆石坝的独特解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Lemolo No. 1 Rockfill Dam
It is 120 ft high with 775 ft crest length; construction is of deck type with reinforced concrete deck; dam is of interest primarily because its north abutment was founded on soil consisting of mixture of old talus, ancient streambed material and clay, which is unique solution for deck type rockfill dam.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dynamic Analysis Using Modal Synthesis Power Conversion Systems of the 21st Century Method for Dynamic Testing of Dams Discussion of “Integrated River System Operation in a Major Flood” Discussion of Flood Protection of Crystal River Unit 3 Nuclear Plant by Ronald M. Noble and Bert Simpson
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1