{"title":"泰国首个中型风力/柴油试点项目","authors":"Supakorn Saengsrithorn, Pairach Kitworawut","doi":"10.1109/ESD.2010.5598786","DOIUrl":null,"url":null,"abstract":"Since 2005, the people in Koh Tao (Tao Island) has electrified from diesel generation for 24 hours a day. The total installed capacity of diesel generator (DEG) is 6 MW but they cannot supply electricity at rated output because of the life time of each DEG. The average of rated output of DEG can be supplied to load is around 60% of rated output. In 2009, the maximum load at Koh Tao was 3.2 MW and minimum load was 1.4 MW. The energy reserve of DEGs is 400 kW. At this island it has a problem of power quality especially in high season of travelling because the electric energy demand is rapidly growth. Other problem is loss of profit of Provincial Electricity Authority (PEA) because PEA provides and supply electricity to load. The electricity tariff at this island is around 3.5 baht/kWh (0.11 $US/kWh) which is same rate with mainland but the capital cost of electricity is around 8 baht/kWh (0.24 $US/kWh). PEA loses money about 6.5 million baht (0.2 M.USD) per month. PEA attempts to reduce loss of profit and improve the power quality by using wind energy which measured the potential more than two years. The 1 × 250 kW wind turbine has installed at mountain range of Chalok Baan Kao.","PeriodicalId":272782,"journal":{"name":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The first medium wind/diesel pilot project in Thailand\",\"authors\":\"Supakorn Saengsrithorn, Pairach Kitworawut\",\"doi\":\"10.1109/ESD.2010.5598786\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since 2005, the people in Koh Tao (Tao Island) has electrified from diesel generation for 24 hours a day. The total installed capacity of diesel generator (DEG) is 6 MW but they cannot supply electricity at rated output because of the life time of each DEG. The average of rated output of DEG can be supplied to load is around 60% of rated output. In 2009, the maximum load at Koh Tao was 3.2 MW and minimum load was 1.4 MW. The energy reserve of DEGs is 400 kW. At this island it has a problem of power quality especially in high season of travelling because the electric energy demand is rapidly growth. Other problem is loss of profit of Provincial Electricity Authority (PEA) because PEA provides and supply electricity to load. The electricity tariff at this island is around 3.5 baht/kWh (0.11 $US/kWh) which is same rate with mainland but the capital cost of electricity is around 8 baht/kWh (0.24 $US/kWh). PEA loses money about 6.5 million baht (0.2 M.USD) per month. PEA attempts to reduce loss of profit and improve the power quality by using wind energy which measured the potential more than two years. The 1 × 250 kW wind turbine has installed at mountain range of Chalok Baan Kao.\",\"PeriodicalId\":272782,\"journal\":{\"name\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESD.2010.5598786\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference on Energy and Sustainable Development: Issues and Strategies (ESD 2010)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESD.2010.5598786","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

自2005年以来,桃岛的居民每天24小时都使用柴油发电。柴油发电机组的总装机容量为6兆瓦,但由于每台柴油发电机组的使用寿命,不能以额定输出功率供电。柴油发电机组的平均额定输出功率约为额定输出功率的60%左右。2009年,岛岛的最大负荷为3.2兆瓦,最小负荷为1.4兆瓦。DEGs的能量储备为400kw。在这个岛上,由于电力需求的快速增长,特别是在旅游旺季,电力质量存在问题。另一个问题是省电力局(PEA)的利润损失,因为PEA为负荷提供和供应电力。该岛的电价约为3.5泰铢/千瓦时(0.11美元/千瓦时),与大陆的电价相同,但电力的资本成本约为8泰铢/千瓦时(0.24美元/千瓦时)。PEA每月损失约650万泰铢(20万美元)。PEA试图通过使用风能来减少利润损失并改善电能质量,该项目已经测量了两年多的潜力。1 × 250千瓦的风力涡轮机已安装在Chalok Baan Kao山脉。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The first medium wind/diesel pilot project in Thailand
Since 2005, the people in Koh Tao (Tao Island) has electrified from diesel generation for 24 hours a day. The total installed capacity of diesel generator (DEG) is 6 MW but they cannot supply electricity at rated output because of the life time of each DEG. The average of rated output of DEG can be supplied to load is around 60% of rated output. In 2009, the maximum load at Koh Tao was 3.2 MW and minimum load was 1.4 MW. The energy reserve of DEGs is 400 kW. At this island it has a problem of power quality especially in high season of travelling because the electric energy demand is rapidly growth. Other problem is loss of profit of Provincial Electricity Authority (PEA) because PEA provides and supply electricity to load. The electricity tariff at this island is around 3.5 baht/kWh (0.11 $US/kWh) which is same rate with mainland but the capital cost of electricity is around 8 baht/kWh (0.24 $US/kWh). PEA loses money about 6.5 million baht (0.2 M.USD) per month. PEA attempts to reduce loss of profit and improve the power quality by using wind energy which measured the potential more than two years. The 1 × 250 kW wind turbine has installed at mountain range of Chalok Baan Kao.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Result of road lighting energy saving project implementation through the use of public private partnership scheme Experimental study on heat transfer and pressure drop in a channel with triangular V-ribs Shihmen sediment prevention diversion tunnel planning and design Potential of thermoelectric power from bagasse by sugar mills of Pakistan Multi-scenarios of effective demand side management in Navanakorn industrial promotion zone
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1