卡拉旺政府办公楼建设管理分析

Hangger Muhammad Ma’rifatullah, Fathur Rohman
{"title":"卡拉旺政府办公楼建设管理分析","authors":"Hangger Muhammad Ma’rifatullah, Fathur Rohman","doi":"10.33603/jgst.v2i2.1289","DOIUrl":null,"url":null,"abstract":"The purpose of this thesis is to know volume of work on construction of Karawang Government Office Project, analyze method of implementation of work, to know the cost of implementation on construction of Karawang Government Office Project, and the comparison of time duration between scheduling prediction of owner with scheduling prediction of author. This type of the research is quantitative. That describes the condition of a particular project with existing data related to the construction of local government buildings. That existing data is processed in such a way as to produce the final conclusion. The result of the research is Based on Budget Cost calculations to complete Karawang government office construction until the final stage, more or less costly Rp.41.906.713.365,-. From the calculation of weight of work is estimated completion of Karawang government office construction work takes 75 weeks. With the CPM method can be known critical path occurs in the project are Excavation and Pile Up Work – Pile Foundation Work – River Stone Foundation Work – Reinforced Concrete Work – Wall, Brick, and Plastering Work – Door Frame, Leaf Door, and Window Work -  Ceiling Work – Sanitation Set Work -  Lighting Installation Work – Lift Work. Keyword : Construction Management, Barchart, S Curve, Critical Path.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ANALYSIS THE CONSTRUCTION MANAGEMENT ANALYSIS OF THE KARAWANG GOVERNMENT OFFICE\",\"authors\":\"Hangger Muhammad Ma’rifatullah, Fathur Rohman\",\"doi\":\"10.33603/jgst.v2i2.1289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this thesis is to know volume of work on construction of Karawang Government Office Project, analyze method of implementation of work, to know the cost of implementation on construction of Karawang Government Office Project, and the comparison of time duration between scheduling prediction of owner with scheduling prediction of author. This type of the research is quantitative. That describes the condition of a particular project with existing data related to the construction of local government buildings. That existing data is processed in such a way as to produce the final conclusion. The result of the research is Based on Budget Cost calculations to complete Karawang government office construction until the final stage, more or less costly Rp.41.906.713.365,-. From the calculation of weight of work is estimated completion of Karawang government office construction work takes 75 weeks. With the CPM method can be known critical path occurs in the project are Excavation and Pile Up Work – Pile Foundation Work – River Stone Foundation Work – Reinforced Concrete Work – Wall, Brick, and Plastering Work – Door Frame, Leaf Door, and Window Work -  Ceiling Work – Sanitation Set Work -  Lighting Installation Work – Lift Work. Keyword : Construction Management, Barchart, S Curve, Critical Path.\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-04-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jgst.v2i2.1289\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v2i2.1289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本论文的目的是了解卡拉旺政府办公大楼工程的建设工作量,分析工程的实施方法,了解卡拉旺政府办公大楼工程的实施成本,并将业主的进度预测与作者的进度预测的工期进行比较。这种类型的研究是定量的。它描述了与当地政府大楼建设相关的现有数据的特定项目的情况。对现有数据进行处理,从而得出最终结论。研究的结果是,根据预算成本计算,完成卡拉旺政府办公楼建设直到最后阶段,成本大致为Rp.41.906.713.365,-。从工程重量的计算来看,估计完成卡拉旺政府办公楼的建设工作需要75周。使用CPM方法可以知道在项目中发生的关键路径是开挖和堆桩工作-桩基础工作-河石基础工作-钢筋混凝土工作-墙,砖和抹灰工作-门框,扇门和窗户工作-天花板工作-卫生装置工作-照明安装工作-升降机工作。关键词:施工管理,柱状图,S曲线,关键路径。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALYSIS THE CONSTRUCTION MANAGEMENT ANALYSIS OF THE KARAWANG GOVERNMENT OFFICE
The purpose of this thesis is to know volume of work on construction of Karawang Government Office Project, analyze method of implementation of work, to know the cost of implementation on construction of Karawang Government Office Project, and the comparison of time duration between scheduling prediction of owner with scheduling prediction of author. This type of the research is quantitative. That describes the condition of a particular project with existing data related to the construction of local government buildings. That existing data is processed in such a way as to produce the final conclusion. The result of the research is Based on Budget Cost calculations to complete Karawang government office construction until the final stage, more or less costly Rp.41.906.713.365,-. From the calculation of weight of work is estimated completion of Karawang government office construction work takes 75 weeks. With the CPM method can be known critical path occurs in the project are Excavation and Pile Up Work – Pile Foundation Work – River Stone Foundation Work – Reinforced Concrete Work – Wall, Brick, and Plastering Work – Door Frame, Leaf Door, and Window Work -  Ceiling Work – Sanitation Set Work -  Lighting Installation Work – Lift Work. Keyword : Construction Management, Barchart, S Curve, Critical Path.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1