{"title":"寄售库存伙伴关系下采购、生产和出货数量的联合优化","authors":"R. As'ad, Osama Alkhatib, M. Hariga","doi":"10.1109/ICMSAO.2017.7934877","DOIUrl":null,"url":null,"abstract":"This paper seeks to jointly optimize the operational decisions associated with raw material procurement, production lot sizing as well as finished product dispatching for a two layer supply chain comprised of a single-vendor and a single-buyer. A more general raw material replenishment schedule is considered wherein multiple raw material shipments may take place within one cycle, referred to as multi-to-one (MTO) policy, or alternatively a single shipment that covers the production for multiple cycles, referred to as one-to-multi (OTM) policy, may rather be adopted depending on whichever is optimal. The aforementioned decisions are simultaneously optimized through mathematical models that embrace the integer multiplier of the cycle time policy. A numerical example that illustrates the performance of the developed models is also presented.","PeriodicalId":265345,"journal":{"name":"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Joint optimization of procurement, production and shipping quantities under consignment stock partnership\",\"authors\":\"R. As'ad, Osama Alkhatib, M. Hariga\",\"doi\":\"10.1109/ICMSAO.2017.7934877\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper seeks to jointly optimize the operational decisions associated with raw material procurement, production lot sizing as well as finished product dispatching for a two layer supply chain comprised of a single-vendor and a single-buyer. A more general raw material replenishment schedule is considered wherein multiple raw material shipments may take place within one cycle, referred to as multi-to-one (MTO) policy, or alternatively a single shipment that covers the production for multiple cycles, referred to as one-to-multi (OTM) policy, may rather be adopted depending on whichever is optimal. The aforementioned decisions are simultaneously optimized through mathematical models that embrace the integer multiplier of the cycle time policy. A numerical example that illustrates the performance of the developed models is also presented.\",\"PeriodicalId\":265345,\"journal\":{\"name\":\"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMSAO.2017.7934877\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSAO.2017.7934877","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Joint optimization of procurement, production and shipping quantities under consignment stock partnership
This paper seeks to jointly optimize the operational decisions associated with raw material procurement, production lot sizing as well as finished product dispatching for a two layer supply chain comprised of a single-vendor and a single-buyer. A more general raw material replenishment schedule is considered wherein multiple raw material shipments may take place within one cycle, referred to as multi-to-one (MTO) policy, or alternatively a single shipment that covers the production for multiple cycles, referred to as one-to-multi (OTM) policy, may rather be adopted depending on whichever is optimal. The aforementioned decisions are simultaneously optimized through mathematical models that embrace the integer multiplier of the cycle time policy. A numerical example that illustrates the performance of the developed models is also presented.