{"title":"早期估计VHDL项目的规模","authors":"W. Fornaciari, F. Salice, D. Scarpazza","doi":"10.1145/944645.944699","DOIUrl":null,"url":null,"abstract":"The analysis of the amount of human resources required to complete a project is felt as a critical issue in any company of the electronics industry. In particular, early estimation of the effort involved in a development process is a key requirement for any cost-driven system-level design decision. In this paper, we present a methodology to predict the final size of a VHDL project on the basis of a high-level description, obtaining a significant indication about the development effort. The methodology is the composition of a number of specialized models, tailored to estimate the size of specific component types. Models were trained and tested on two disjoint and large sets of real VHDL projects. Quality-of-result indicators show that the methodology is both accurate and robust.","PeriodicalId":174422,"journal":{"name":"First IEEE/ACM/IFIP International Conference on Hardware/ Software Codesign and Systems Synthesis (IEEE Cat. No.03TH8721)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Early estimation of the size of VHDL projects\",\"authors\":\"W. Fornaciari, F. Salice, D. Scarpazza\",\"doi\":\"10.1145/944645.944699\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The analysis of the amount of human resources required to complete a project is felt as a critical issue in any company of the electronics industry. In particular, early estimation of the effort involved in a development process is a key requirement for any cost-driven system-level design decision. In this paper, we present a methodology to predict the final size of a VHDL project on the basis of a high-level description, obtaining a significant indication about the development effort. The methodology is the composition of a number of specialized models, tailored to estimate the size of specific component types. Models were trained and tested on two disjoint and large sets of real VHDL projects. Quality-of-result indicators show that the methodology is both accurate and robust.\",\"PeriodicalId\":174422,\"journal\":{\"name\":\"First IEEE/ACM/IFIP International Conference on Hardware/ Software Codesign and Systems Synthesis (IEEE Cat. No.03TH8721)\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"First IEEE/ACM/IFIP International Conference on Hardware/ Software Codesign and Systems Synthesis (IEEE Cat. No.03TH8721)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/944645.944699\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"First IEEE/ACM/IFIP International Conference on Hardware/ Software Codesign and Systems Synthesis (IEEE Cat. No.03TH8721)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/944645.944699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

分析完成一个项目所需的人力资源的数量,在电子行业的任何公司都被认为是一个关键问题。特别是,开发过程中所涉及的工作的早期评估是任何成本驱动的系统级设计决策的关键需求。在本文中,我们提出了一种基于高级描述的方法来预测VHDL项目的最终规模,从而获得有关开发工作的重要指示。该方法是许多专门模型的组合,用于估计特定组件类型的大小。模型在两个不相交的大型VHDL项目集上进行了训练和测试。结果质量指标表明,该方法既准确又稳健。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Early estimation of the size of VHDL projects
The analysis of the amount of human resources required to complete a project is felt as a critical issue in any company of the electronics industry. In particular, early estimation of the effort involved in a development process is a key requirement for any cost-driven system-level design decision. In this paper, we present a methodology to predict the final size of a VHDL project on the basis of a high-level description, obtaining a significant indication about the development effort. The methodology is the composition of a number of specialized models, tailored to estimate the size of specific component types. Models were trained and tested on two disjoint and large sets of real VHDL projects. Quality-of-result indicators show that the methodology is both accurate and robust.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
VL-CDRAM: variable line sized cached DRAMs Deriving process networks from weakly dynamic applications in system-level design A low power scheduler using game theory RTOS scheduling in transaction level models Security wrappers and power analysis for SoC technology
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1