项目排放的不确定性分析

A. Abdi, Sharareh Taahipour
{"title":"项目排放的不确定性分析","authors":"A. Abdi, Sharareh Taahipour","doi":"10.1109/EPEC.2018.8598319","DOIUrl":null,"url":null,"abstract":"Many nations are implementing or plan to implement a carbon pricing program in response to global warming and climate change issues. A significant amount of greenhouse gas (GHG) emissions can be attributed to projects, mainly construction works. Therefore, projects' environmental impact should be estimated before the project commencement and be monitored during its implementation phase. In this paper, we propose a probabilistic model to quantify the uncertainty of project GHG emissions using Bayesian networks (BNs) and simulation techniques. The model provides a quantitative risk analysis mechanism to estimate the total emissions of the project as well as an update of the final emissions using information on the completed activates.","PeriodicalId":265297,"journal":{"name":"2018 IEEE Electrical Power and Energy Conference (EPEC)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Uncertanty Analysis of Project Emissions\",\"authors\":\"A. Abdi, Sharareh Taahipour\",\"doi\":\"10.1109/EPEC.2018.8598319\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many nations are implementing or plan to implement a carbon pricing program in response to global warming and climate change issues. A significant amount of greenhouse gas (GHG) emissions can be attributed to projects, mainly construction works. Therefore, projects' environmental impact should be estimated before the project commencement and be monitored during its implementation phase. In this paper, we propose a probabilistic model to quantify the uncertainty of project GHG emissions using Bayesian networks (BNs) and simulation techniques. The model provides a quantitative risk analysis mechanism to estimate the total emissions of the project as well as an update of the final emissions using information on the completed activates.\",\"PeriodicalId\":265297,\"journal\":{\"name\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPEC.2018.8598319\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Electrical Power and Energy Conference (EPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2018.8598319","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

许多国家正在实施或计划实施碳定价计划,以应对全球变暖和气候变化问题。大量的温室气体(GHG)排放可归因于项目,主要是建筑工程。因此,项目的环境影响应在项目开始前进行评估,并在项目实施阶段进行监测。在本文中,我们提出了一个概率模型,利用贝叶斯网络(BNs)和模拟技术量化项目温室气体排放的不确定性。该模型提供了一个定量的风险分析机制,以估计项目的总排放量,并利用已完成的活动的信息更新最终排放量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Uncertanty Analysis of Project Emissions
Many nations are implementing or plan to implement a carbon pricing program in response to global warming and climate change issues. A significant amount of greenhouse gas (GHG) emissions can be attributed to projects, mainly construction works. Therefore, projects' environmental impact should be estimated before the project commencement and be monitored during its implementation phase. In this paper, we propose a probabilistic model to quantify the uncertainty of project GHG emissions using Bayesian networks (BNs) and simulation techniques. The model provides a quantitative risk analysis mechanism to estimate the total emissions of the project as well as an update of the final emissions using information on the completed activates.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Power Mismatch Elimination Strategy for an MMC-based PV System in Unbalanced Grids Implementation and Testing of a Hybrid Protection Scheme for Active Distribution Network Evaluation of Parametric Statistical Models for Wind Speed Probability Density Estimation Modeling of Ferroresonance Phenomena in MV Networks Emulating Subsynchronous Resonance using Hardware and Software Implementation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1