穆罕默德迪亚万隆大学项目管理分析

Ayu Putri Aninda, Fathur Rohman
{"title":"穆罕默德迪亚万隆大学项目管理分析","authors":"Ayu Putri Aninda, Fathur Rohman","doi":"10.33603/jgst.v3i2.2381","DOIUrl":null,"url":null,"abstract":"Abstract Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of Muhammadiyah Bandung University. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Management Analysis Of The Project Of Muhammadiyah Bandung University\",\"authors\":\"Ayu Putri Aninda, Fathur Rohman\",\"doi\":\"10.33603/jgst.v3i2.2381\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of Muhammadiyah Bandung University. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jgst.v3i2.2381\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v3i2.2381","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目管理是指从项目的早期(构思)到最终项目的所有计划、实施、控制和协调,以确保项目适当的时间、金钱和质量。选择方法调度项目也是一个很重要的注意事项,以获得符合原计划的结果。本文具体论述了万隆大学建设项目管理规划。这项研究是通过实地调查和文献研究的方式进行的。本文的分析包括体积计算,劳动力,材料和设备的需求,条形图,现金流,S曲线,关键路径法(CPM)是一种识别关键工作路径或项目的方法。向前计算,向后计算,自由浮动和总浮动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Management Analysis Of The Project Of Muhammadiyah Bandung University
Abstract Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of Muhammadiyah Bandung University. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1