{"title":"面向过程安全保障的企业生产线能耗优化","authors":"S. Valeev, N. Kondratyeva, A. Lutov","doi":"10.1109/ICOECS46375.2019.8949975","DOIUrl":null,"url":null,"abstract":"The task of optimizing the load in the power supply system of a manufacturing enterprise to ensure technological safety in the event of an overload of the power network is considered. The architecture of a distributed control system for work scheduling performed by parallel-working machines in the process of implementing technological processes for processing parts is proposed. The solutions to the problem of preventing overloading the workshop's power system based on a big data processing system are considered.","PeriodicalId":371743,"journal":{"name":"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Energy Consumption Optimization of Production Lines of Enterprise for Process Safety Provision\",\"authors\":\"S. Valeev, N. Kondratyeva, A. Lutov\",\"doi\":\"10.1109/ICOECS46375.2019.8949975\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The task of optimizing the load in the power supply system of a manufacturing enterprise to ensure technological safety in the event of an overload of the power network is considered. The architecture of a distributed control system for work scheduling performed by parallel-working machines in the process of implementing technological processes for processing parts is proposed. The solutions to the problem of preventing overloading the workshop's power system based on a big data processing system are considered.\",\"PeriodicalId\":371743,\"journal\":{\"name\":\"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICOECS46375.2019.8949975\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOECS46375.2019.8949975","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Energy Consumption Optimization of Production Lines of Enterprise for Process Safety Provision
The task of optimizing the load in the power supply system of a manufacturing enterprise to ensure technological safety in the event of an overload of the power network is considered. The architecture of a distributed control system for work scheduling performed by parallel-working machines in the process of implementing technological processes for processing parts is proposed. The solutions to the problem of preventing overloading the workshop's power system based on a big data processing system are considered.