幼稚园校园网建设项目施工管理分析

Dea Devira Hidayati, Saihul Anwar
{"title":"幼稚园校园网建设项目施工管理分析","authors":"Dea Devira Hidayati, Saihul Anwar","doi":"10.33603/JGST.V4I3.4939","DOIUrl":null,"url":null,"abstract":"Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.  Contruction management analysis on this building project of Kinderfield School include volume measurment, RAB, cost recapitulation and working/occupation unit cost analysis, with use CPM method (Critical Path Method) is a method in identificating a stripe or working item critically. CPM method solves the problem with retreat and forward measurement.  From the weight measurment occupation based on Barchart analysis, Curva S and building PDM scedhule of Kinderfield School needs the times as long as 42 weeks with cost estimation Rp. 9,439,526,000,00.. Keyword: Barchart, Construction Management, CPM (Critical Path Method) , S-Curve .","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALYSIS OF CONSTRUCTION MANAGEMENT OF KINDERFIELD SCHOOL CIREBON DEVELOPMENT PROJECT\",\"authors\":\"Dea Devira Hidayati, Saihul Anwar\",\"doi\":\"10.33603/JGST.V4I3.4939\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.  Contruction management analysis on this building project of Kinderfield School include volume measurment, RAB, cost recapitulation and working/occupation unit cost analysis, with use CPM method (Critical Path Method) is a method in identificating a stripe or working item critically. CPM method solves the problem with retreat and forward measurement.  From the weight measurment occupation based on Barchart analysis, Curva S and building PDM scedhule of Kinderfield School needs the times as long as 42 weeks with cost estimation Rp. 9,439,526,000,00.. Keyword: Barchart, Construction Management, CPM (Critical Path Method) , S-Curve .\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/JGST.V4I3.4939\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/JGST.V4I3.4939","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑项目的管理正变得越来越复杂,因为其中有许多相互作用的各方,对功能、舒适、安全、美观和可持续性的质量要求越来越高。因此,施工管理需要保证施工项目的效率和生产力,以满足各种期望和要求。对Kinderfield School建筑项目的施工管理分析包括体积测量,RAB,成本重述和工作/职业单位成本分析,使用CPM方法(关键路径法)是一种批判性地识别条带或工作项目的方法。CPM方法解决了后退和前进测量的问题。从基于Barchart分析的体重测量职业来看,Curva S和Kinderfield School的建筑PDM进度需要长达42周的时间,成本估算Rp. 9,439,526,000。关键词:柱状图,施工管理,关键路径法,s曲线
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALYSIS OF CONSTRUCTION MANAGEMENT OF KINDERFIELD SCHOOL CIREBON DEVELOPMENT PROJECT
Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.  Contruction management analysis on this building project of Kinderfield School include volume measurment, RAB, cost recapitulation and working/occupation unit cost analysis, with use CPM method (Critical Path Method) is a method in identificating a stripe or working item critically. CPM method solves the problem with retreat and forward measurement.  From the weight measurment occupation based on Barchart analysis, Curva S and building PDM scedhule of Kinderfield School needs the times as long as 42 weeks with cost estimation Rp. 9,439,526,000,00.. Keyword: Barchart, Construction Management, CPM (Critical Path Method) , S-Curve .
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1