{"title":"软件构建工作预测的统计建模","authors":"Gilberto López, Myriam Soria","doi":"10.35429/jca.2019.9.3.6.10","DOIUrl":null,"url":null,"abstract":"This work focuses on the estimation of software construction effort based on programmer performance. This estimate is of great importance for the organization, since improvements are required of processes that use good practices, such as CMMI (Capability Maturity Model Integration). Therefore, a descriptive investigation was carried out for characterize the construction performance of software. Software products are requirements that respond to the specific needs of a customer and their technical dependencies not explicitly required by the customer, but necessary for the fulfillment of an explicit requirement. Characterized performances allow an organization to know if its processes are under control, as well as to produce models to estimate efforts and costs that are reliable.","PeriodicalId":390253,"journal":{"name":"Revista de Computo Aplicado","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modelado estadístico de pronóstico de esfuerzo de construcción de Software\",\"authors\":\"Gilberto López, Myriam Soria\",\"doi\":\"10.35429/jca.2019.9.3.6.10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work focuses on the estimation of software construction effort based on programmer performance. This estimate is of great importance for the organization, since improvements are required of processes that use good practices, such as CMMI (Capability Maturity Model Integration). Therefore, a descriptive investigation was carried out for characterize the construction performance of software. Software products are requirements that respond to the specific needs of a customer and their technical dependencies not explicitly required by the customer, but necessary for the fulfillment of an explicit requirement. Characterized performances allow an organization to know if its processes are under control, as well as to produce models to estimate efforts and costs that are reliable.\",\"PeriodicalId\":390253,\"journal\":{\"name\":\"Revista de Computo Aplicado\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista de Computo Aplicado\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35429/jca.2019.9.3.6.10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de Computo Aplicado","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35429/jca.2019.9.3.6.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modelado estadístico de pronóstico de esfuerzo de construcción de Software
This work focuses on the estimation of software construction effort based on programmer performance. This estimate is of great importance for the organization, since improvements are required of processes that use good practices, such as CMMI (Capability Maturity Model Integration). Therefore, a descriptive investigation was carried out for characterize the construction performance of software. Software products are requirements that respond to the specific needs of a customer and their technical dependencies not explicitly required by the customer, but necessary for the fulfillment of an explicit requirement. Characterized performances allow an organization to know if its processes are under control, as well as to produce models to estimate efforts and costs that are reliable.