{"title":"基于IEC 61850的变电站保护系统测试中ied的虚拟隔离","authors":"A. Apostolov, B. Vandiver","doi":"10.1109/CPRE.2014.6799027","DOIUrl":null,"url":null,"abstract":"Edition 2 of IEC 61850 introduced many new features that further enhance the power of the standard. There are new features that should make the life of the end user easier - assuming the features are supported by future products. They are designed to support not only automated configuration and execution of test procedures, but also remote testing for some specific test cases. It is expected, that interoperability between engineering tools will be improved - something that is urgently needed. New features supporting functional and system testing should facilitate the ways lEC 61850 based installation needs to be isolated - during commissioning, in case of maintenance problems, as well as for routine testing.","PeriodicalId":285252,"journal":{"name":"2014 67th Annual Conference for Protective Relay Engineers","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Virtual isolation of IEDs for testing in IEC 61850 based substation protection systems\",\"authors\":\"A. Apostolov, B. Vandiver\",\"doi\":\"10.1109/CPRE.2014.6799027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Edition 2 of IEC 61850 introduced many new features that further enhance the power of the standard. There are new features that should make the life of the end user easier - assuming the features are supported by future products. They are designed to support not only automated configuration and execution of test procedures, but also remote testing for some specific test cases. It is expected, that interoperability between engineering tools will be improved - something that is urgently needed. New features supporting functional and system testing should facilitate the ways lEC 61850 based installation needs to be isolated - during commissioning, in case of maintenance problems, as well as for routine testing.\",\"PeriodicalId\":285252,\"journal\":{\"name\":\"2014 67th Annual Conference for Protective Relay Engineers\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 67th Annual Conference for Protective Relay Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2014.6799027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 67th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2014.6799027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Virtual isolation of IEDs for testing in IEC 61850 based substation protection systems
Edition 2 of IEC 61850 introduced many new features that further enhance the power of the standard. There are new features that should make the life of the end user easier - assuming the features are supported by future products. They are designed to support not only automated configuration and execution of test procedures, but also remote testing for some specific test cases. It is expected, that interoperability between engineering tools will be improved - something that is urgently needed. New features supporting functional and system testing should facilitate the ways lEC 61850 based installation needs to be isolated - during commissioning, in case of maintenance problems, as well as for routine testing.