丹戎加提主要道路发展规划建设分析

Tubagus CiptaPerdana Harta, Martinus Agus Sugianto
{"title":"丹戎加提主要道路发展规划建设分析","authors":"Tubagus CiptaPerdana Harta, Martinus Agus Sugianto","doi":"10.33603/jgst.v2i2.1287","DOIUrl":null,"url":null,"abstract":"Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality. The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method. Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALYSIS OF PLANNING CONSTRUCTION MAIN ROAD DEVELOPMENT PLTU TANJUNG JATI A\",\"authors\":\"Tubagus CiptaPerdana Harta, Martinus Agus Sugianto\",\"doi\":\"10.33603/jgst.v2i2.1287\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality. The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method. Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/jgst.v2i2.1287\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v2i2.1287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前正在实施的丹戎加提蒸汽电厂主干道建设还没有铺装结构,由于道路平均日交通量(LHR)并不多,笔者在考虑车辆荷载重复系数的情况下,通过分析刚性铺装厚度规划来确定研究对象。本研究除了对路面厚度规划进行分析外,还将分析唐戎加提PLTU道路施工的施工管理是否高效、有效、有质量。本研究采用的方法是以二次数据为主的定性方法、车辆荷载重复分析、刚性路面厚度分析、体积计算分析、成本分析、条形图法、S曲线法和关键路径法。关键词:高速公路,刚性路面,混凝土路面,项目管理,条形图法,S曲线,CPM
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALYSIS OF PLANNING CONSTRUCTION MAIN ROAD DEVELOPMENT PLTU TANJUNG JATI A
Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality. The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method. Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1