{"title":"装配计划生成的新自底向上算法:微工厂设计的机遇","authors":"C. Perrard, Philippe Lutz, Paulo Salgueiro","doi":"10.1109/ISAM.2007.4288485","DOIUrl":null,"url":null,"abstract":"This paper discusses a new approach dedicated to assembly plan generation, called \"bottom-up algorithm\". It is compared to the traditional \"top-down approach\", usually used to perform this stage of the design process of the assembly systems for \"macro-products\". We explore why this new algorithm is better adapted for designing a microassembly system. The case of watch assembly plans generation is described through the both approaches and the obtained results are compared.","PeriodicalId":166385,"journal":{"name":"2007 IEEE International Symposium on Assembly and Manufacturing","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"New bottom-up algorithm for assembly plan generation: opportunities for micro-factory design\",\"authors\":\"C. Perrard, Philippe Lutz, Paulo Salgueiro\",\"doi\":\"10.1109/ISAM.2007.4288485\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses a new approach dedicated to assembly plan generation, called \\\"bottom-up algorithm\\\". It is compared to the traditional \\\"top-down approach\\\", usually used to perform this stage of the design process of the assembly systems for \\\"macro-products\\\". We explore why this new algorithm is better adapted for designing a microassembly system. The case of watch assembly plans generation is described through the both approaches and the obtained results are compared.\",\"PeriodicalId\":166385,\"journal\":{\"name\":\"2007 IEEE International Symposium on Assembly and Manufacturing\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE International Symposium on Assembly and Manufacturing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISAM.2007.4288485\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE International Symposium on Assembly and Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISAM.2007.4288485","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
New bottom-up algorithm for assembly plan generation: opportunities for micro-factory design
This paper discusses a new approach dedicated to assembly plan generation, called "bottom-up algorithm". It is compared to the traditional "top-down approach", usually used to perform this stage of the design process of the assembly systems for "macro-products". We explore why this new algorithm is better adapted for designing a microassembly system. The case of watch assembly plans generation is described through the both approaches and the obtained results are compared.