在没有自备蒸汽源的情况下为苏尔古特 GRES-2 800 兆瓦机组选择启动方案

IF 0.9 Q4 ENERGY & FUELS Thermal Engineering Pub Date : 2023-12-18 DOI:10.1134/S004060152312011X
A. V. Skuratov, V. I. Gombolevskii, M. V. Lazarev, A. S. Shabunin, P. A. Berezinets, Yu. S. Vasil’konov, A. N. Sinel’nikov, S. G. Filippov
{"title":"在没有自备蒸汽源的情况下为苏尔古特 GRES-2 800 兆瓦机组选择启动方案","authors":"A. V. Skuratov,&nbsp;V. I. Gombolevskii,&nbsp;M. V. Lazarev,&nbsp;A. S. Shabunin,&nbsp;P. A. Berezinets,&nbsp;Yu. S. Vasil’konov,&nbsp;A. N. Sinel’nikov,&nbsp;S. G. Filippov","doi":"10.1134/S004060152312011X","DOIUrl":null,"url":null,"abstract":"<p>Matters concerned with the tenacity of thermal power plants still remain of issue for the power industry of Russia. In view of power capacities concentrated within the boundaries of a single power plant, various off-design situations (accidents) occur in it, and the likelihood of such situations to occur increases significantly since the tendency toward aging of the existing equipment is still continuing. The situation in which the Surgut GRES-2 thermal power plant’s generating steam power equipment become shut down completely (so-called blackout) considered in the article is one of such contingencies. To cope with system accidents of this sort, relevant possibilities and means must be available. The Surgut GRES-2 power plant consists of two sages: six 800-MW seam power units (SPUs) and two 400-MW combined cycle units (CCUs). The article presents solutions to the problem stated above through interaction of the equipment of the power plant’s two stages. Five possible schemes for starting the SPUs from zero when there is loss of auxiliary steam are considered. The organizational and technical measures necessary for implementing these options are developed. The minimal requirements for an external steam source (flowrate, pressure, and temperature) are determined theoretically and confirmed by tests. Calculations of the CCU’s heat-recovery steam generator (HRSG) are carried out, which confirmed its ability to behave as the external steam source. For two promising options, schemes for the necessary modification of the power units are developed, and an aggregative comparative assessment of the costs for implementing them is carried out.</p>","PeriodicalId":799,"journal":{"name":"Thermal Engineering","volume":"70 12","pages":"1102 - 1107"},"PeriodicalIF":0.9000,"publicationDate":"2023-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source\",\"authors\":\"A. V. Skuratov,&nbsp;V. I. Gombolevskii,&nbsp;M. V. Lazarev,&nbsp;A. S. Shabunin,&nbsp;P. A. Berezinets,&nbsp;Yu. S. Vasil’konov,&nbsp;A. N. Sinel’nikov,&nbsp;S. G. Filippov\",\"doi\":\"10.1134/S004060152312011X\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Matters concerned with the tenacity of thermal power plants still remain of issue for the power industry of Russia. In view of power capacities concentrated within the boundaries of a single power plant, various off-design situations (accidents) occur in it, and the likelihood of such situations to occur increases significantly since the tendency toward aging of the existing equipment is still continuing. The situation in which the Surgut GRES-2 thermal power plant’s generating steam power equipment become shut down completely (so-called blackout) considered in the article is one of such contingencies. To cope with system accidents of this sort, relevant possibilities and means must be available. The Surgut GRES-2 power plant consists of two sages: six 800-MW seam power units (SPUs) and two 400-MW combined cycle units (CCUs). The article presents solutions to the problem stated above through interaction of the equipment of the power plant’s two stages. Five possible schemes for starting the SPUs from zero when there is loss of auxiliary steam are considered. The organizational and technical measures necessary for implementing these options are developed. The minimal requirements for an external steam source (flowrate, pressure, and temperature) are determined theoretically and confirmed by tests. Calculations of the CCU’s heat-recovery steam generator (HRSG) are carried out, which confirmed its ability to behave as the external steam source. For two promising options, schemes for the necessary modification of the power units are developed, and an aggregative comparative assessment of the costs for implementing them is carried out.</p>\",\"PeriodicalId\":799,\"journal\":{\"name\":\"Thermal Engineering\",\"volume\":\"70 12\",\"pages\":\"1102 - 1107\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Thermal Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://link.springer.com/article/10.1134/S004060152312011X\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Thermal Engineering","FirstCategoryId":"1085","ListUrlMain":"https://link.springer.com/article/10.1134/S004060152312011X","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

摘要 有关火力发电厂韧性的问题仍然是俄罗斯电力工业的一个难题。由于发电能力集中在一个发电厂内,因此会出现各种超出设计的情况(事故),而且由于现有设备的老化趋势仍在继续,出现这种情况的可能性也大大增加。文章中提到的苏尔古特 GRES-2 热电厂发电蒸汽动力设备完全关闭(即所谓停电)的情况就是此类突发事件之一。要应对此类系统事故,必须具备相关的可能性和手段。苏尔古特 GRES-2 发电站由两台机组组成:六台 800 兆瓦有缝机组 (SPU) 和两台 400 兆瓦联合循环机组 (CCU)。文章通过电站两个阶段设备的相互作用,提出了上述问题的解决方案。文章考虑了辅助蒸汽损失时从零开始启动 SPU 的五种可能方案。并制定了实施这些方案所需的组织和技术措施。从理论上确定了对外部蒸汽源的最低要求(流量、压力和温度),并通过试验予以确认。对 CCU 的热回收蒸汽发生器(HRSG)进行了计算,确认了其作为外部蒸汽源的能力。针对两种可行的方案,制定了对发电装置进行必要改造的计划,并对实施这些方案的成本进行了综合比较评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source

Matters concerned with the tenacity of thermal power plants still remain of issue for the power industry of Russia. In view of power capacities concentrated within the boundaries of a single power plant, various off-design situations (accidents) occur in it, and the likelihood of such situations to occur increases significantly since the tendency toward aging of the existing equipment is still continuing. The situation in which the Surgut GRES-2 thermal power plant’s generating steam power equipment become shut down completely (so-called blackout) considered in the article is one of such contingencies. To cope with system accidents of this sort, relevant possibilities and means must be available. The Surgut GRES-2 power plant consists of two sages: six 800-MW seam power units (SPUs) and two 400-MW combined cycle units (CCUs). The article presents solutions to the problem stated above through interaction of the equipment of the power plant’s two stages. Five possible schemes for starting the SPUs from zero when there is loss of auxiliary steam are considered. The organizational and technical measures necessary for implementing these options are developed. The minimal requirements for an external steam source (flowrate, pressure, and temperature) are determined theoretically and confirmed by tests. Calculations of the CCU’s heat-recovery steam generator (HRSG) are carried out, which confirmed its ability to behave as the external steam source. For two promising options, schemes for the necessary modification of the power units are developed, and an aggregative comparative assessment of the costs for implementing them is carried out.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.30
自引率
20.00%
发文量
94
期刊最新文献
Ensuring Technological Indicators for Nitrogen Oxide Emissions during Solid-Fuel Combustion in a High-Power Steam Boiler Simulation Modelling of Cycle Chemistry Monitoring of Water and Steam Quality at Thermal Power Plants A Study of Thermal Cycle Circuits of NPPs Combined with Fossil Fueled Power Installations Experimental Investigation of Forced Flow Heat-Transfer Enhancement in a Minichannel Optimization of Radiator Design for Immersion Cooling of a Powerful Thyristor
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1