Fabrizio Di Mascio, Alessandro Natalini, Stefania Profeti
{"title":"两级博弈中的上游和下游实施安排。意大利国家恢复和复原计划中的行政简化重点","authors":"Fabrizio Di Mascio, Alessandro Natalini, Stefania Profeti","doi":"10.1111/ropr.12594","DOIUrl":null,"url":null,"abstract":"The onset of the European NGEU program represented for European member states a formidable opportunity for post-pandemic recovery and yet a significant challenge at the same time: to receive and retain EU funds, each state had to promptly draw up a National Recovery and Resilience Plan—NRRP) and commit to a pressing timetable for its implementation. Regarding this challenge, the Italian government's response is a case in point: first, Italy is by far the largest beneficiary of NGEU funds; second, it has long had a reputation for being laggard in both the implementation of European directives and the spending of cohesion policy structural funds; and the formulation of the NRRP, the design of the governance in charge of its implementation, and implementation itself, occurred at a particular moment in the country's political life. Based on these premises, the article examines the upstream process by which the Italian government designed the implementation arrangements for the adoption of simplification policies under the NRRP and their downstream recalibration in the first two years, taking the implementation arrangements as the dependent variable. Analytically, the focus is on the interplay between the pressures of EU timetables and internal political dynamics, be they the legacy or strategic political considerations on the part of national policymakers, in determining the design and eventual re-design of implementation arrangements as the plan unfolds.","PeriodicalId":47408,"journal":{"name":"Review of Policy Research","volume":"24 1","pages":""},"PeriodicalIF":2.3000,"publicationDate":"2024-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Upstream and downstream implementation arrangements in two-level games. A focus on administrative simplification in the Italian National Recovery and Resilience Plan\",\"authors\":\"Fabrizio Di Mascio, Alessandro Natalini, Stefania Profeti\",\"doi\":\"10.1111/ropr.12594\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The onset of the European NGEU program represented for European member states a formidable opportunity for post-pandemic recovery and yet a significant challenge at the same time: to receive and retain EU funds, each state had to promptly draw up a National Recovery and Resilience Plan—NRRP) and commit to a pressing timetable for its implementation. Regarding this challenge, the Italian government's response is a case in point: first, Italy is by far the largest beneficiary of NGEU funds; second, it has long had a reputation for being laggard in both the implementation of European directives and the spending of cohesion policy structural funds; and the formulation of the NRRP, the design of the governance in charge of its implementation, and implementation itself, occurred at a particular moment in the country's political life. Based on these premises, the article examines the upstream process by which the Italian government designed the implementation arrangements for the adoption of simplification policies under the NRRP and their downstream recalibration in the first two years, taking the implementation arrangements as the dependent variable. Analytically, the focus is on the interplay between the pressures of EU timetables and internal political dynamics, be they the legacy or strategic political considerations on the part of national policymakers, in determining the design and eventual re-design of implementation arrangements as the plan unfolds.\",\"PeriodicalId\":47408,\"journal\":{\"name\":\"Review of Policy Research\",\"volume\":\"24 1\",\"pages\":\"\"},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2024-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Review of Policy Research\",\"FirstCategoryId\":\"90\",\"ListUrlMain\":\"https://doi.org/10.1111/ropr.12594\",\"RegionNum\":3,\"RegionCategory\":\"社会学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"POLITICAL SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Review of Policy Research","FirstCategoryId":"90","ListUrlMain":"https://doi.org/10.1111/ropr.12594","RegionNum":3,"RegionCategory":"社会学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"POLITICAL SCIENCE","Score":null,"Total":0}
引用次数: 0
摘要
欧洲 NGEU 计划的启动对欧洲各成员国来说,是疫后恢复的一个巨大机遇,但同时也是一个重大挑战:为了获得并留住欧盟的资金,每个国家都必须立即制定国家恢复和复原计划(National Recovery and Resilience Plan-NRRP),并承诺执行该计划的紧迫时间表。关于这一挑战,意大利政府的应对措施是一个很好的例子:首先,意大利是迄今为止国家重建与恢复计划资金的最大受益国;其次,长期以来,意大利在执行欧洲指令和使用凝聚力政策结构基金方面一直以落后著称;而且,国家重建与恢复计划的制定、负责其实施的管理机构的设计以及实施本身,都发生在该国政治生活中的一个特殊时刻。基于这些前提,文章以实施安排为因变量,考察了意大利政府在《国家改革与发展计划》下设计简化政策实施安排的上游过程及其在头两年的下游重新调整过程。分析的重点是欧盟时间表的压力和内部政治动态之间的相互作用,无论是国家政策制定者的遗留问题还是战略性政治考虑,都决定了随着计划的展开,实施安排的设计和最终重新设计。
Upstream and downstream implementation arrangements in two-level games. A focus on administrative simplification in the Italian National Recovery and Resilience Plan
The onset of the European NGEU program represented for European member states a formidable opportunity for post-pandemic recovery and yet a significant challenge at the same time: to receive and retain EU funds, each state had to promptly draw up a National Recovery and Resilience Plan—NRRP) and commit to a pressing timetable for its implementation. Regarding this challenge, the Italian government's response is a case in point: first, Italy is by far the largest beneficiary of NGEU funds; second, it has long had a reputation for being laggard in both the implementation of European directives and the spending of cohesion policy structural funds; and the formulation of the NRRP, the design of the governance in charge of its implementation, and implementation itself, occurred at a particular moment in the country's political life. Based on these premises, the article examines the upstream process by which the Italian government designed the implementation arrangements for the adoption of simplification policies under the NRRP and their downstream recalibration in the first two years, taking the implementation arrangements as the dependent variable. Analytically, the focus is on the interplay between the pressures of EU timetables and internal political dynamics, be they the legacy or strategic political considerations on the part of national policymakers, in determining the design and eventual re-design of implementation arrangements as the plan unfolds.
期刊介绍:
The Review of Policy Research (RPR) is an international peer-reviewed journal devoted to the publication of research and analysis examining the politics and policy of science and technology. These may include issues of science policy, environment, resource management, information networks, cultural industries, biotechnology, security and surveillance, privacy, globalization, education, research and innovation, development, intellectual property, health and demographics. The journal encompasses research and analysis on politics and the outcomes and consequences of policy change in domestic and comparative contexts.