D. Khairullin, S. M. Sultanmagomedov, R.R. Khasanov
{"title":"开发在湍急河流上安装海港围油栏的方法","authors":"D. Khairullin, S. M. Sultanmagomedov, R.R. Khasanov","doi":"10.18412/1816-0395-2024-2-19-25","DOIUrl":null,"url":null,"abstract":"Methods for installing the harbour booms both with and without a support rope are considered and their features and disadvantages are highlighted. An improved method for installing a harbour boom along a support rope is presented, which eliminates the shortcomings of existing methods. A detailed description is provided, as well as the results of experiments on installing the harbour booms using this method.","PeriodicalId":502598,"journal":{"name":"Ecology and Industry of Russia","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of a Method for Installing a Harbour Boom Across Fast-flowing River\",\"authors\":\"D. Khairullin, S. M. Sultanmagomedov, R.R. Khasanov\",\"doi\":\"10.18412/1816-0395-2024-2-19-25\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Methods for installing the harbour booms both with and without a support rope are considered and their features and disadvantages are highlighted. An improved method for installing a harbour boom along a support rope is presented, which eliminates the shortcomings of existing methods. A detailed description is provided, as well as the results of experiments on installing the harbour booms using this method.\",\"PeriodicalId\":502598,\"journal\":{\"name\":\"Ecology and Industry of Russia\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ecology and Industry of Russia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18412/1816-0395-2024-2-19-25\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ecology and Industry of Russia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18412/1816-0395-2024-2-19-25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development of a Method for Installing a Harbour Boom Across Fast-flowing River
Methods for installing the harbour booms both with and without a support rope are considered and their features and disadvantages are highlighted. An improved method for installing a harbour boom along a support rope is presented, which eliminates the shortcomings of existing methods. A detailed description is provided, as well as the results of experiments on installing the harbour booms using this method.