{"title":"根据岩土工程建议,在非常松软和水饱和的沼泽地带优化 OPD 低壁处理,PT. Barasentosa Lestari, RAYMAX 矿业公司","authors":"Aries Gusti, Umbu Dasa, Adittama Prasetya Nugraha, dan M. Okky Anriansyah","doi":"10.36986/impj.v5i2.119","DOIUrl":null,"url":null,"abstract":"Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm. ","PeriodicalId":479697,"journal":{"name":"Indonesian Mining Professionals Journal","volume":"70 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING\",\"authors\":\"Aries Gusti, Umbu Dasa, Adittama Prasetya Nugraha, dan M. Okky Anriansyah\",\"doi\":\"10.36986/impj.v5i2.119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm. \",\"PeriodicalId\":479697,\"journal\":{\"name\":\"Indonesian Mining Professionals Journal\",\"volume\":\"70 6\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indonesian Mining Professionals Journal\",\"FirstCategoryId\":\"0\",\"ListUrlMain\":\"https://doi.org/10.36986/impj.v5i2.119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Mining Professionals Journal","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.36986/impj.v5i2.119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

辛纳马斯矿业公司(PT Barasentosa Lestari (BSL))2022 年的采矿作业计划位于 Belani 区块,该区块有两个矿坑,即 Pinang 矿坑和 Satelit 矿坑,以及三个弃渣场,即 OPD 低壁弃渣场、OPD 高壁弃渣场和 IPD Satelit 弃渣场。位于北侧的 OPD Lowwall 弃置场的特征是高含水量的沼泽区。根据沼泽材料的特点,在该区域堆放过程中会引发沼泽和堆放物的移动,对安全、环境、生产等方面造成影响,同时也会对公司的对外和形象造成影响。因此,需要进行适当的规划和处理,以优化处理量。对 OPD 低墙弃渣优化计划进行了岩土工程分析,并使用 CPTu 测试对沼泽区回填基底进行了初步调查,以确定原位强度、孔隙压力过大区域、软材料边界和固结速率,从而提供安全的 FoS 限制(FoS > 1.3)。弃土材料的未排水状态也是确定斜坡稳定性分析的一个因素。岩土工程建议在 OPD 低壁弃置区北侧的沼泽地带设置配重,以便再次优化弃置容量,在 RL+35 - RL+80 处增加 900 kbcm 的弃置容量,总体坡度为 50。 初始阶段是在沼泽地带周围开挖沟渠,以释放从东到西的溪流。然后从北面开始,在 RL+26 处切割并清除沼泽区内厚度为 4 米的软质材料,总计 45 千兆立方厘米。切割工程之后是填土工程,填土材料为硬质粘土。从基底 RL+26 到 RL+35 的填土高度为 3 米,共计 87,600 立方厘米。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING
Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EVALUASI HAUL ROAD DESIGN DAN OPERASI TAMBANG DILIHAT DARI ASPEK MAINTENANCE DENGAN MINECARE REAL-TIME ANALYSIS STUDY CASE PT KALTIM PRIMA COAL OPTIMALISASI BATUBARA DENGAN MENGHILANGKAN PROSES CLEANING DAN PENGARUHNYA TERHADAP KUALITAS BATUBARA DI PT BORNEO INDOBARA THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS PENGEMBANGAN SISTEM ANALISA DATA KECELAKAAN UNTUK INDUSTRI PERTAMBANGAN DENGAN MENGGUNAKAN METODE HUMAN FACTOR ANALYSIS AND CLASSIFICATION SYSTEM (HFACS) OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1