{"title":"通过整合业务流程再造和区间值犹豫模糊 DEMATEL,管理仓库流程变革的新方法","authors":"Zeynep Tuğçe Kalender","doi":"10.1108/bpmj-07-2023-0567","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>The main purpose of this study is to present a new approach to managing process changes in uncertain conditions. The proposed approach is applied in one of the largest production companies in Turkey to manage the changes in their warehouse processes which formed after the merger.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>In the model, interval-valued hesitant fuzzy the decision-making trial and evaluation laboratory (IVHF-DEMATEL) methodology is integrated into one of the most used BPR tools, change matrix. The main focus of the proposed model is to increase both flexibility and applicability in uncertain conditions. Thus, while the change matrix enables companies to be agile and responsive to changes, IVHF-DEMATEL provides a better way to continuously evaluate and determine critical processes, and strategies to align with evolving conditions.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>Initial analysis revealed two major problems, the slowness of shipments caused by the increase in costs and the confusion in the organizational structure. However, the conventional methods fall short of effectively determination of critical objectives in terms of dealing with uncertainty. Therefore, a comprehensive roadmap for managing the change is developed with the integration of IVHF-DEMATEL and change matrix so that a successful transition is achieved.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>It is believed that the study will contribute to the existing literature by providing a novel approach in which the IVHF-DEMATEL methodology is integrated into the change matrix. Also, the study provides a guideline for practical applications by presenting a step-by-step implementation of the model.</p><!--/ Abstract__block -->","PeriodicalId":47964,"journal":{"name":"Business Process Management Journal","volume":"45 1","pages":""},"PeriodicalIF":4.5000,"publicationDate":"2024-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A novel approach for managing change in warehouse processes via integration of business process re-engineering and interval-valued hesitant fuzzy DEMATEL\",\"authors\":\"Zeynep Tuğçe Kalender\",\"doi\":\"10.1108/bpmj-07-2023-0567\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3>Purpose</h3>\\n<p>The main purpose of this study is to present a new approach to managing process changes in uncertain conditions. The proposed approach is applied in one of the largest production companies in Turkey to manage the changes in their warehouse processes which formed after the merger.</p><!--/ Abstract__block -->\\n<h3>Design/methodology/approach</h3>\\n<p>In the model, interval-valued hesitant fuzzy the decision-making trial and evaluation laboratory (IVHF-DEMATEL) methodology is integrated into one of the most used BPR tools, change matrix. The main focus of the proposed model is to increase both flexibility and applicability in uncertain conditions. Thus, while the change matrix enables companies to be agile and responsive to changes, IVHF-DEMATEL provides a better way to continuously evaluate and determine critical processes, and strategies to align with evolving conditions.</p><!--/ Abstract__block -->\\n<h3>Findings</h3>\\n<p>Initial analysis revealed two major problems, the slowness of shipments caused by the increase in costs and the confusion in the organizational structure. However, the conventional methods fall short of effectively determination of critical objectives in terms of dealing with uncertainty. Therefore, a comprehensive roadmap for managing the change is developed with the integration of IVHF-DEMATEL and change matrix so that a successful transition is achieved.</p><!--/ Abstract__block -->\\n<h3>Originality/value</h3>\\n<p>It is believed that the study will contribute to the existing literature by providing a novel approach in which the IVHF-DEMATEL methodology is integrated into the change matrix. Also, the study provides a guideline for practical applications by presenting a step-by-step implementation of the model.</p><!--/ Abstract__block -->\",\"PeriodicalId\":47964,\"journal\":{\"name\":\"Business Process Management Journal\",\"volume\":\"45 1\",\"pages\":\"\"},\"PeriodicalIF\":4.5000,\"publicationDate\":\"2024-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Business Process Management Journal\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1108/bpmj-07-2023-0567\",\"RegionNum\":3,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Business Process Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/bpmj-07-2023-0567","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"BUSINESS","Score":null,"Total":0}
A novel approach for managing change in warehouse processes via integration of business process re-engineering and interval-valued hesitant fuzzy DEMATEL
Purpose
The main purpose of this study is to present a new approach to managing process changes in uncertain conditions. The proposed approach is applied in one of the largest production companies in Turkey to manage the changes in their warehouse processes which formed after the merger.
Design/methodology/approach
In the model, interval-valued hesitant fuzzy the decision-making trial and evaluation laboratory (IVHF-DEMATEL) methodology is integrated into one of the most used BPR tools, change matrix. The main focus of the proposed model is to increase both flexibility and applicability in uncertain conditions. Thus, while the change matrix enables companies to be agile and responsive to changes, IVHF-DEMATEL provides a better way to continuously evaluate and determine critical processes, and strategies to align with evolving conditions.
Findings
Initial analysis revealed two major problems, the slowness of shipments caused by the increase in costs and the confusion in the organizational structure. However, the conventional methods fall short of effectively determination of critical objectives in terms of dealing with uncertainty. Therefore, a comprehensive roadmap for managing the change is developed with the integration of IVHF-DEMATEL and change matrix so that a successful transition is achieved.
Originality/value
It is believed that the study will contribute to the existing literature by providing a novel approach in which the IVHF-DEMATEL methodology is integrated into the change matrix. Also, the study provides a guideline for practical applications by presenting a step-by-step implementation of the model.
期刊介绍:
Business processes are a fundamental building block of organizational success. Even though effectively managing business process is a key activity for business prosperity, there remain considerable gaps in understanding how to drive efficiency through a process approach. Building a clear and deep understanding of the range process, how they function, and how to manage them is the major challenge facing modern business. Business Process Management Journal (BPMJ) examines how a variety of business processes intrinsic to organizational efficiency and effectiveness are integrated and managed for competitive success. BPMJ builds a deep appreciation of how to manage business processes effectively by disseminating best practice. Coverage includes: BPM in eBusiness, eCommerce and eGovernment Web-based enterprise application integration eBPM, ERP, CRM, ASP & SCM Knowledge management and learning organization Methodologies, techniques and tools of business process modeling, analysis and design Techniques of moving from one-shot business process re-engineering to continuous improvement Best practices in BPM Performance management Tools and techniques of change management BPM case studies.