{"title":"穿透式瓦斯钻井和原位修复技术对光滑孔洞封堵效果的定量评估","authors":"Zuxiang Hu,&nbsp;Yuepeng Yan,&nbsp;Hongqi Yang,&nbsp;Zhancheng Meng,&nbsp;Pengpeng Wen","doi":"10.1002/ese3.1894","DOIUrl":null,"url":null,"abstract":"<p>In this study, a new method is proposed to quantitatively determine the extraction of boreholes under the effect of time. The main purpose of this method is to divide the gas drilling holes in the monitoring time into two stages: the early stage of extraction and the middle stage of extraction. The early stage of extraction uses the gas pressure difference to detect the gas tightness of the drilling holes and determine the type of gas leakage of the drilling holes. Moreover, the unqualified drilling holes are repaired immediately to ensure that all the drilling holes in the middle stage of the monitoring are the qualified holes at the early stage of the inspection. In the middle of extraction, the average attenuation rate of the fitting attenuation curve of pure gas extraction in the extraction borehole is calculated by monitoring, the growth rate of the linear fitting of the pure air leakage is calculated, and their ratios are used as the basis for judging the repair value of the gas leak borehole and the gas leak borehole. This quantitative evaluation method is used to monitor the extraction effect of four test holes in a field test conducted at Ping Coal Mine 10. The results indicate that, after adopting in situ downhole repair technology in the early stage of extraction, the average air leakage of Borehole No. 4, which failed due to air leakage in the borehole, decreased from 9.33 to 1.26 L/min (a reduction of 86.5%). Similarly, that of Borehole No. 3, which failed due to penetration of fissures in the surrounding rock, had an air leakage drop from 8.35 to 1.34 L/min (a reduction of 84.0%). These improvements demonstrate the remarkable effectiveness of the method. The quantitative evaluation method established in this study is not only simple to operate but also stable and reliable. Thus, it is feasible to be applied in the field, which provides important technical support for the improvement in gas extraction effect during coal mine safety production.</p>","PeriodicalId":11673,"journal":{"name":"Energy Science & Engineering","volume":null,"pages":null},"PeriodicalIF":3.5000,"publicationDate":"2024-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/ese3.1894","citationCount":"0","resultStr":"{\"title\":\"Quantitative evaluation of the sealing effect of penetrating gas drilling and in situ repairing technology for smooth holes\",\"authors\":\"Zuxiang Hu,&nbsp;Yuepeng Yan,&nbsp;Hongqi Yang,&nbsp;Zhancheng Meng,&nbsp;Pengpeng Wen\",\"doi\":\"10.1002/ese3.1894\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>In this study, a new method is proposed to quantitatively determine the extraction of boreholes under the effect of time. The main purpose of this method is to divide the gas drilling holes in the monitoring time into two stages: the early stage of extraction and the middle stage of extraction. The early stage of extraction uses the gas pressure difference to detect the gas tightness of the drilling holes and determine the type of gas leakage of the drilling holes. Moreover, the unqualified drilling holes are repaired immediately to ensure that all the drilling holes in the middle stage of the monitoring are the qualified holes at the early stage of the inspection. In the middle of extraction, the average attenuation rate of the fitting attenuation curve of pure gas extraction in the extraction borehole is calculated by monitoring, the growth rate of the linear fitting of the pure air leakage is calculated, and their ratios are used as the basis for judging the repair value of the gas leak borehole and the gas leak borehole. This quantitative evaluation method is used to monitor the extraction effect of four test holes in a field test conducted at Ping Coal Mine 10. The results indicate that, after adopting in situ downhole repair technology in the early stage of extraction, the average air leakage of Borehole No. 4, which failed due to air leakage in the borehole, decreased from 9.33 to 1.26 L/min (a reduction of 86.5%). Similarly, that of Borehole No. 3, which failed due to penetration of fissures in the surrounding rock, had an air leakage drop from 8.35 to 1.34 L/min (a reduction of 84.0%). These improvements demonstrate the remarkable effectiveness of the method. The quantitative evaluation method established in this study is not only simple to operate but also stable and reliable. Thus, it is feasible to be applied in the field, which provides important technical support for the improvement in gas extraction effect during coal mine safety production.</p>\",\"PeriodicalId\":11673,\"journal\":{\"name\":\"Energy Science & Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.5000,\"publicationDate\":\"2024-08-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1002/ese3.1894\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Science & Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/ese3.1894\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Science & Engineering","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/ese3.1894","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

本研究提出了一种新方法,用于定量确定时间影响下的钻孔抽采量。该方法的主要目的是将监测时间内的瓦斯钻孔分为两个阶段:抽采早期阶段和抽采中期阶段。抽采初期利用瓦斯压差检测钻孔的气密性,判断钻孔的瓦斯泄漏类型。此外,对不合格的钻孔立即进行修补,以保证监测中期的钻孔全部为检测初期的合格钻孔。在抽采中期,通过监测计算出抽采钻孔内纯瓦斯抽采拟合衰减曲线的平均衰减率,计算出纯漏风量线性拟合增长率,并将二者的比值作为判断漏瓦斯钻孔和漏瓦斯钻孔修复值的依据。在平煤10矿进行的现场试验中,采用这种定量评价方法对四个试验孔的抽采效果进行了监测。结果表明,在抽采初期采用井下原位修复技术后,因钻孔漏气而失效的 4 号钻孔的平均漏风量从 9.33 L/min 降至 1.26 L/min(降幅达 86.5%)。同样,因围岩裂隙渗透而失效的 3 号钻孔的漏气量也从 8.35 升/分钟降至 1.34 升/分钟(减少了 84.0%)。这些改进表明该方法效果显著。本研究建立的定量评估方法不仅操作简单,而且稳定可靠。因此,在现场应用是可行的,为煤矿安全生产过程中瓦斯抽采效果的提升提供了重要的技术支撑。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Quantitative evaluation of the sealing effect of penetrating gas drilling and in situ repairing technology for smooth holes

In this study, a new method is proposed to quantitatively determine the extraction of boreholes under the effect of time. The main purpose of this method is to divide the gas drilling holes in the monitoring time into two stages: the early stage of extraction and the middle stage of extraction. The early stage of extraction uses the gas pressure difference to detect the gas tightness of the drilling holes and determine the type of gas leakage of the drilling holes. Moreover, the unqualified drilling holes are repaired immediately to ensure that all the drilling holes in the middle stage of the monitoring are the qualified holes at the early stage of the inspection. In the middle of extraction, the average attenuation rate of the fitting attenuation curve of pure gas extraction in the extraction borehole is calculated by monitoring, the growth rate of the linear fitting of the pure air leakage is calculated, and their ratios are used as the basis for judging the repair value of the gas leak borehole and the gas leak borehole. This quantitative evaluation method is used to monitor the extraction effect of four test holes in a field test conducted at Ping Coal Mine 10. The results indicate that, after adopting in situ downhole repair technology in the early stage of extraction, the average air leakage of Borehole No. 4, which failed due to air leakage in the borehole, decreased from 9.33 to 1.26 L/min (a reduction of 86.5%). Similarly, that of Borehole No. 3, which failed due to penetration of fissures in the surrounding rock, had an air leakage drop from 8.35 to 1.34 L/min (a reduction of 84.0%). These improvements demonstrate the remarkable effectiveness of the method. The quantitative evaluation method established in this study is not only simple to operate but also stable and reliable. Thus, it is feasible to be applied in the field, which provides important technical support for the improvement in gas extraction effect during coal mine safety production.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Energy Science & Engineering
Energy Science & Engineering Engineering-Safety, Risk, Reliability and Quality
CiteScore
6.80
自引率
7.90%
发文量
298
审稿时长
11 weeks
期刊介绍: Energy Science & Engineering is a peer reviewed, open access journal dedicated to fundamental and applied research on energy and supply and use. Published as a co-operative venture of Wiley and SCI (Society of Chemical Industry), the journal offers authors a fast route to publication and the ability to share their research with the widest possible audience of scientists, professionals and other interested people across the globe. Securing an affordable and low carbon energy supply is a critical challenge of the 21st century and the solutions will require collaboration between scientists and engineers worldwide. This new journal aims to facilitate collaboration and spark innovation in energy research and development. Due to the importance of this topic to society and economic development the journal will give priority to quality research papers that are accessible to a broad readership and discuss sustainable, state-of-the art approaches to shaping the future of energy. This multidisciplinary journal will appeal to all researchers and professionals working in any area of energy in academia, industry or government, including scientists, engineers, consultants, policy-makers, government officials, economists and corporate organisations.
期刊最新文献
Issue Information Similar simulation test of the mechanical properties of layered composite rock mass A novel approach to classify lithology of reservoir formations using GrowNet and Deep-Insight with physic-based feature augmentation Combined genetic algorithm and response surface methodology-based bi-optimization of a vertical-axis wind turbine numerically simulated using CFD Experimental study on the utilization of Fly ash solid waste in tunnel shotcrete materials
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1