{"title":"利用土水耦合弹塑性有限元对饱和软土地基中高速铁路桩基支撑填海路堤的动态响应进行数值试验","authors":"","doi":"10.1016/j.trgeo.2024.101374","DOIUrl":null,"url":null,"abstract":"<div><div>High-speed train (HST) running in the saturated soft ground induces significant vibration that may threaten the running safety and serviceability of high-speed railway (HSR). Extensive studies have been conducted on the dynamic responses of HSR, yet, the soil–water coupling and plastic behavior in the saturated soft ground are rarely considered, and thus the build-up of excess pore water pressure (EPWP) and displacement cannot be accurately calculated. In this study, 2D soil–water coupling elastoplastic FEM was employed to investigate HST induced vibration in the pile-supported embankment using FE code called DBLEAVES. Dynamic soil stress, EPWP, acceleration and displacement under different cases were numerically analyzed in detail. Numerical tests confirm that liquid phase in soft ground plays important influence on the dynamic responses that vertical acceleration and displacement will be overestimated while the horizontal acceleration and displacement as well as EPWP will be underestimated if soil–water coupling is not considered. Single-phase analysis also exaggerates the acceleration attenuation and underestimate the vibration amplification in soft ground. The existence of piles can induce significant soil arching effect in the embankment, the distributions of vertical acceleration and EPWP are partitioned sharply by the piles while vertical displacement in soft ground becomes more uniform along the depth direction within the pile reinforced area. The existence of piles also induces stronger vibration beneath the pile end so that larger EPWP is generated below the pile end than around the pile body. The main influence area due to HST vibration for pile-supported embankment is overall 20 m away from the centerline of HSR track, therefore, it is reasonable to improve the ground by properly increasing the number of pile within this area. When the number of pile is determined, increasing the length of pile or reducing the pile spacing are two effective ways to mitigate the dynamic response.</div></div>","PeriodicalId":56013,"journal":{"name":"Transportation Geotechnics","volume":null,"pages":null},"PeriodicalIF":4.9000,"publicationDate":"2024-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2214391224001958/pdfft?md5=3e92c2fcb1e2fa30ef324a59125c821b&pid=1-s2.0-S2214391224001958-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Numerical tests on dynamic response of pile-supported reclaimed embankment for high-speed railway in saturated soft ground using soil–water coupling elastoplastic FEM\",\"authors\":\"\",\"doi\":\"10.1016/j.trgeo.2024.101374\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>High-speed train (HST) running in the saturated soft ground induces significant vibration that may threaten the running safety and serviceability of high-speed railway (HSR). Extensive studies have been conducted on the dynamic responses of HSR, yet, the soil–water coupling and plastic behavior in the saturated soft ground are rarely considered, and thus the build-up of excess pore water pressure (EPWP) and displacement cannot be accurately calculated. In this study, 2D soil–water coupling elastoplastic FEM was employed to investigate HST induced vibration in the pile-supported embankment using FE code called DBLEAVES. Dynamic soil stress, EPWP, acceleration and displacement under different cases were numerically analyzed in detail. Numerical tests confirm that liquid phase in soft ground plays important influence on the dynamic responses that vertical acceleration and displacement will be overestimated while the horizontal acceleration and displacement as well as EPWP will be underestimated if soil–water coupling is not considered. Single-phase analysis also exaggerates the acceleration attenuation and underestimate the vibration amplification in soft ground. The existence of piles can induce significant soil arching effect in the embankment, the distributions of vertical acceleration and EPWP are partitioned sharply by the piles while vertical displacement in soft ground becomes more uniform along the depth direction within the pile reinforced area. The existence of piles also induces stronger vibration beneath the pile end so that larger EPWP is generated below the pile end than around the pile body. The main influence area due to HST vibration for pile-supported embankment is overall 20 m away from the centerline of HSR track, therefore, it is reasonable to improve the ground by properly increasing the number of pile within this area. When the number of pile is determined, increasing the length of pile or reducing the pile spacing are two effective ways to mitigate the dynamic response.</div></div>\",\"PeriodicalId\":56013,\"journal\":{\"name\":\"Transportation Geotechnics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.9000,\"publicationDate\":\"2024-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2214391224001958/pdfft?md5=3e92c2fcb1e2fa30ef324a59125c821b&pid=1-s2.0-S2214391224001958-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transportation Geotechnics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2214391224001958\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Geotechnics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214391224001958","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Numerical tests on dynamic response of pile-supported reclaimed embankment for high-speed railway in saturated soft ground using soil–water coupling elastoplastic FEM
High-speed train (HST) running in the saturated soft ground induces significant vibration that may threaten the running safety and serviceability of high-speed railway (HSR). Extensive studies have been conducted on the dynamic responses of HSR, yet, the soil–water coupling and plastic behavior in the saturated soft ground are rarely considered, and thus the build-up of excess pore water pressure (EPWP) and displacement cannot be accurately calculated. In this study, 2D soil–water coupling elastoplastic FEM was employed to investigate HST induced vibration in the pile-supported embankment using FE code called DBLEAVES. Dynamic soil stress, EPWP, acceleration and displacement under different cases were numerically analyzed in detail. Numerical tests confirm that liquid phase in soft ground plays important influence on the dynamic responses that vertical acceleration and displacement will be overestimated while the horizontal acceleration and displacement as well as EPWP will be underestimated if soil–water coupling is not considered. Single-phase analysis also exaggerates the acceleration attenuation and underestimate the vibration amplification in soft ground. The existence of piles can induce significant soil arching effect in the embankment, the distributions of vertical acceleration and EPWP are partitioned sharply by the piles while vertical displacement in soft ground becomes more uniform along the depth direction within the pile reinforced area. The existence of piles also induces stronger vibration beneath the pile end so that larger EPWP is generated below the pile end than around the pile body. The main influence area due to HST vibration for pile-supported embankment is overall 20 m away from the centerline of HSR track, therefore, it is reasonable to improve the ground by properly increasing the number of pile within this area. When the number of pile is determined, increasing the length of pile or reducing the pile spacing are two effective ways to mitigate the dynamic response.
期刊介绍:
Transportation Geotechnics is a journal dedicated to publishing high-quality, theoretical, and applied papers that cover all facets of geotechnics for transportation infrastructure such as roads, highways, railways, underground railways, airfields, and waterways. The journal places a special emphasis on case studies that present original work relevant to the sustainable construction of transportation infrastructure. The scope of topics it addresses includes the geotechnical properties of geomaterials for sustainable and rational design and construction, the behavior of compacted and stabilized geomaterials, the use of geosynthetics and reinforcement in constructed layers and interlayers, ground improvement and slope stability for transportation infrastructures, compaction technology and management, maintenance technology, the impact of climate, embankments for highways and high-speed trains, transition zones, dredging, underwater geotechnics for infrastructure purposes, and the modeling of multi-layered structures and supporting ground under dynamic and repeated loads.