{"title":"雷击下 ±800 kV 超高压直流输电系统中光 CT 测量不准确导致的单极阻塞事故分析","authors":"Weirong Qian ,&nbsp;Wenbo Li ,&nbsp;Pengcheng Sha ,&nbsp;Junbo Deng ,&nbsp;Guanjun Zhang ,&nbsp;Yuhang Shi ,&nbsp;Dingge Yang ,&nbsp;Hao Wu ,&nbsp;Yanhua Han","doi":"10.1016/j.epsr.2024.111212","DOIUrl":null,"url":null,"abstract":"<div><div>The ultra-high voltage direct current (UHVDC) power transmission systems usually transmit a capacity of 6-8 GW, their stability and reliability are of vital importance to the large power grid. This paper analyses a mono-pole blocking accident caused by the inaccurate measurement of optical current transformer (OCT) when the pole line of Shaanbei-Wuhan ±800 kV UHVDC transmission system was struck by lightning. Combined with electromagnetic transient simulation of the UHVDC transmission system, digital simulation and in-plant testing of the optical CT, a comprehensive understanding of the factors contributing to the accident is achieved. It reveals that optical CT measurement anomalies were significant contributors to the misoperation of protective relays, which led to the mono-pole blocking accident. Based on the simulations of optical CT under high peak currents and high di/dt conditions caused by lightning strike, the importance of proper setting of demodulation algorithm parameters in optical CT to avoid inaccurate measurements is emphasized. Through in-plant testing and steady state current accuracy verification, the reasonableness of demodulation parameters is verified. Simulation results illustrate the challenges in measuring very fast transient current accurately, which are the premise and guarantee of stable operation of UHVDC transmission systems under lightning strike.</div></div>","PeriodicalId":50547,"journal":{"name":"Electric Power Systems Research","volume":"239 ","pages":"Article 111212"},"PeriodicalIF":3.3000,"publicationDate":"2024-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Mono-pole blocking accident analysis caused by inaccurate measurement of optical CT in ±800 kV UHVDC transmission system under lightning strike\",\"authors\":\"Weirong Qian ,&nbsp;Wenbo Li ,&nbsp;Pengcheng Sha ,&nbsp;Junbo Deng ,&nbsp;Guanjun Zhang ,&nbsp;Yuhang Shi ,&nbsp;Dingge Yang ,&nbsp;Hao Wu ,&nbsp;Yanhua Han\",\"doi\":\"10.1016/j.epsr.2024.111212\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The ultra-high voltage direct current (UHVDC) power transmission systems usually transmit a capacity of 6-8 GW, their stability and reliability are of vital importance to the large power grid. This paper analyses a mono-pole blocking accident caused by the inaccurate measurement of optical current transformer (OCT) when the pole line of Shaanbei-Wuhan ±800 kV UHVDC transmission system was struck by lightning. Combined with electromagnetic transient simulation of the UHVDC transmission system, digital simulation and in-plant testing of the optical CT, a comprehensive understanding of the factors contributing to the accident is achieved. It reveals that optical CT measurement anomalies were significant contributors to the misoperation of protective relays, which led to the mono-pole blocking accident. Based on the simulations of optical CT under high peak currents and high di/dt conditions caused by lightning strike, the importance of proper setting of demodulation algorithm parameters in optical CT to avoid inaccurate measurements is emphasized. Through in-plant testing and steady state current accuracy verification, the reasonableness of demodulation parameters is verified. Simulation results illustrate the challenges in measuring very fast transient current accurately, which are the premise and guarantee of stable operation of UHVDC transmission systems under lightning strike.</div></div>\",\"PeriodicalId\":50547,\"journal\":{\"name\":\"Electric Power Systems Research\",\"volume\":\"239 \",\"pages\":\"Article 111212\"},\"PeriodicalIF\":3.3000,\"publicationDate\":\"2024-11-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electric Power Systems Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0378779624010988\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electric Power Systems Research","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0378779624010988","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

特高压直流(UHVDC)输电系统的输电容量通常为 6-8 GW,其稳定性和可靠性对大电网至关重要。本文分析了陕北-武汉±800 kV 特高压直流输电系统杆线遭雷击时,由于光电互感器(OCT)测量不准确造成的单极闭锁事故。结合特高压直流输电系统的电磁暂态仿真、数字仿真和光学 CT 的厂内测试,全面了解了导致事故的因素。研究发现,光学 CT 测量异常是导致保护继电器误动作的重要原因,从而引发了单极闭锁事故。根据对雷击造成的高峰值电流和高 di/dt 条件下光学 CT 的模拟,强调了正确设置光学 CT 的解调算法参数以避免测量不准确的重要性。通过厂内测试和稳态电流精度验证,验证了解调参数的合理性。仿真结果说明了精确测量极快瞬态电流所面临的挑战,而精确测量极快瞬态电流是特高压直流输电系统在雷击下稳定运行的前提和保障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Mono-pole blocking accident analysis caused by inaccurate measurement of optical CT in ±800 kV UHVDC transmission system under lightning strike
The ultra-high voltage direct current (UHVDC) power transmission systems usually transmit a capacity of 6-8 GW, their stability and reliability are of vital importance to the large power grid. This paper analyses a mono-pole blocking accident caused by the inaccurate measurement of optical current transformer (OCT) when the pole line of Shaanbei-Wuhan ±800 kV UHVDC transmission system was struck by lightning. Combined with electromagnetic transient simulation of the UHVDC transmission system, digital simulation and in-plant testing of the optical CT, a comprehensive understanding of the factors contributing to the accident is achieved. It reveals that optical CT measurement anomalies were significant contributors to the misoperation of protective relays, which led to the mono-pole blocking accident. Based on the simulations of optical CT under high peak currents and high di/dt conditions caused by lightning strike, the importance of proper setting of demodulation algorithm parameters in optical CT to avoid inaccurate measurements is emphasized. Through in-plant testing and steady state current accuracy verification, the reasonableness of demodulation parameters is verified. Simulation results illustrate the challenges in measuring very fast transient current accurately, which are the premise and guarantee of stable operation of UHVDC transmission systems under lightning strike.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Electric Power Systems Research
Electric Power Systems Research 工程技术-工程:电子与电气
CiteScore
7.50
自引率
17.90%
发文量
963
审稿时长
3.8 months
期刊介绍: Electric Power Systems Research is an international medium for the publication of original papers concerned with the generation, transmission, distribution and utilization of electrical energy. The journal aims at presenting important results of work in this field, whether in the form of applied research, development of new procedures or components, orginal application of existing knowledge or new designapproaches. The scope of Electric Power Systems Research is broad, encompassing all aspects of electric power systems. The following list of topics is not intended to be exhaustive, but rather to indicate topics that fall within the journal purview. • Generation techniques ranging from advances in conventional electromechanical methods, through nuclear power generation, to renewable energy generation. • Transmission, spanning the broad area from UHV (ac and dc) to network operation and protection, line routing and design. • Substation work: equipment design, protection and control systems. • Distribution techniques, equipment development, and smart grids. • The utilization area from energy efficiency to distributed load levelling techniques. • Systems studies including control techniques, planning, optimization methods, stability, security assessment and insulation coordination.
期刊最新文献
Investigation of GLM detections of negative continuing currents observed by high-speed video and narrow-band 777 nm photometer Business and pricing models for smart energy at building level: A Review Enhanced resilience in smart grids: A neural network-based detection of data integrity attacks using improved war strategy optimization Improved electrogeometric model for shielding failure evaluation of double-circuit UHVAC transmission lines based on leader propagation simulations Demand flexibility in hydrogen production by incorporating electrical and physical parameters
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1