使用贝叶斯模型平均进行洪水预报的前处理和后处理

IF 2.7 4区 环境科学与生态学 Q2 Environmental Science Hydrology Research Pub Date : 2023-02-04 DOI:10.2166/nh.2023.024
T. J. Hegdahl, K. Engeland, I. Steinsland, A. Singleton
{"title":"使用贝叶斯模型平均进行洪水预报的前处理和后处理","authors":"T. J. Hegdahl, K. Engeland, I. Steinsland, A. Singleton","doi":"10.2166/nh.2023.024","DOIUrl":null,"url":null,"abstract":"\n In this study, pre- and postprocessing of hydrological ensemble forecasts are evaluated with a special focus on floods for 119 Norwegian catchments. Two years of ECMWF ensemble forecasts of temperature and precipitation with a lead time of up to 9 days were used to force the operational hydrological HBV model to establish streamflow forecasts. A Bayesian model averaging processing approach was applied to preprocess temperature and precipitation forecasts and to postprocessing streamflow forecasts. Ensemble streamflow forecasts were generated for eight schemes based on combinations of raw, preprocessed, and postprocessed forecasts. Two datasets were used to evaluate the forecasts: (i) all streamflow forecasts and (ii) forecasts for flood events with streamflow above mean annual flood. Evaluations based on all streamflow data showed that postprocessing improved the forecasts only up to a lead time of 2–3 days, whereas preprocessing temperature and precipitation improved the forecasts for 50–90% of the catchments beyond 3 days lead time. We found large differences in the ability to issue warnings between spring and autumn floods. Spring floods had predictability for up to 9 days for many events and catchments, whereas the ability to predict autumn floods beyond 3 days was marginal.","PeriodicalId":55040,"journal":{"name":"Hydrology Research","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2023-02-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Pre- and postprocessing flood forecasts using Bayesian model averaging\",\"authors\":\"T. J. Hegdahl, K. Engeland, I. Steinsland, A. Singleton\",\"doi\":\"10.2166/nh.2023.024\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In this study, pre- and postprocessing of hydrological ensemble forecasts are evaluated with a special focus on floods for 119 Norwegian catchments. Two years of ECMWF ensemble forecasts of temperature and precipitation with a lead time of up to 9 days were used to force the operational hydrological HBV model to establish streamflow forecasts. A Bayesian model averaging processing approach was applied to preprocess temperature and precipitation forecasts and to postprocessing streamflow forecasts. Ensemble streamflow forecasts were generated for eight schemes based on combinations of raw, preprocessed, and postprocessed forecasts. Two datasets were used to evaluate the forecasts: (i) all streamflow forecasts and (ii) forecasts for flood events with streamflow above mean annual flood. Evaluations based on all streamflow data showed that postprocessing improved the forecasts only up to a lead time of 2–3 days, whereas preprocessing temperature and precipitation improved the forecasts for 50–90% of the catchments beyond 3 days lead time. We found large differences in the ability to issue warnings between spring and autumn floods. Spring floods had predictability for up to 9 days for many events and catchments, whereas the ability to predict autumn floods beyond 3 days was marginal.\",\"PeriodicalId\":55040,\"journal\":{\"name\":\"Hydrology Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2023-02-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydrology Research\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://doi.org/10.2166/nh.2023.024\",\"RegionNum\":4,\"RegionCategory\":\"环境科学与生态学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Environmental Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydrology Research","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.2166/nh.2023.024","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 2

摘要

在这项研究中,对水文综合预报的前处理和后处理进行了评估,特别关注119个挪威集水区的洪水。两年的ECMWF温度和降水综合预报,提前时间长达9天,用于强制运行的水文HBV模型建立径流预报。将贝叶斯模型平均处理方法应用于温度和降水预报的预处理和径流预报的后处理。基于原始、预处理和后处理预测的组合,为八个方案生成了综合流量预测。使用两个数据集来评估预测:(i)所有流量预测和(ii)流量高于年平均洪水的洪水事件预测。基于所有流量数据的评估表明,后处理仅在2–3天的交付周期内改善了预测,而预处理温度和降水量在3天交付周期后改善了50–90%集水区的预测。我们发现,春季和秋季洪水的预警能力存在很大差异。对于许多事件和集水区,春季洪水的可预测性长达9天,而预测3天以上秋季洪水的能力微乎其微。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pre- and postprocessing flood forecasts using Bayesian model averaging
In this study, pre- and postprocessing of hydrological ensemble forecasts are evaluated with a special focus on floods for 119 Norwegian catchments. Two years of ECMWF ensemble forecasts of temperature and precipitation with a lead time of up to 9 days were used to force the operational hydrological HBV model to establish streamflow forecasts. A Bayesian model averaging processing approach was applied to preprocess temperature and precipitation forecasts and to postprocessing streamflow forecasts. Ensemble streamflow forecasts were generated for eight schemes based on combinations of raw, preprocessed, and postprocessed forecasts. Two datasets were used to evaluate the forecasts: (i) all streamflow forecasts and (ii) forecasts for flood events with streamflow above mean annual flood. Evaluations based on all streamflow data showed that postprocessing improved the forecasts only up to a lead time of 2–3 days, whereas preprocessing temperature and precipitation improved the forecasts for 50–90% of the catchments beyond 3 days lead time. We found large differences in the ability to issue warnings between spring and autumn floods. Spring floods had predictability for up to 9 days for many events and catchments, whereas the ability to predict autumn floods beyond 3 days was marginal.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Hydrology Research
Hydrology Research Environmental Science-Water Science and Technology
CiteScore
5.30
自引率
7.40%
发文量
70
审稿时长
17 weeks
期刊介绍: Hydrology Research provides international coverage on all aspects of hydrology in its widest sense, and welcomes the submission of papers from across the subject. While emphasis is placed on studies of the hydrological cycle, the Journal also covers the physics and chemistry of water. Hydrology Research is intended to be a link between basic hydrological research and the practical application of scientific results within the broad field of water management.
期刊最新文献
Prediction of flash flood peak discharge in hilly areas with ungauged basins based on machine learning Effects of tributary inflows on unsteady flow hysteresis and hydrodynamics in the mainstream Drought mitigation operation of water conservancy projects under severe droughts Water quality level estimation using IoT sensors and probabilistic machine learning model Design storm parameterisation for urban drainage studies derived from regional rainfall datasets: A case study in the Spanish Mediterranean region
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1