建筑信息模型数据在钢筋加工厂应用的可能性

D. Pupeikis, Lina Morkunaite, M. Daukšys, A. Navickas, Svajūnas Abromas
{"title":"建筑信息模型数据在钢筋加工厂应用的可能性","authors":"D. Pupeikis, Lina Morkunaite, M. Daukšys, A. Navickas, Svajūnas Abromas","doi":"10.5755/j01.sace.28.1.27593","DOIUrl":null,"url":null,"abstract":"While the AEC industry is moving towards digitalization off-site rebar prefabrication became a common practice. Now most companies use a long-established standard order processing method, where the customer submits 2D paper or PDF-based drawings. Subsequently, the manufacturers are obligated to make additional detailing, redrawing, calculations, and preparation of other required information for manufacturing. Thus, in this typical scenario, there is a great repetition of the same tasks, with the obvious loss of time and increased likelihood of human error. However, improvements can be made by the application of advanced digital production workflow and the use of open BIM standards (e.g., IFC, XML, BVBS). Therefore, this paper presents the typical data flow algorithm in contrast to the automated data flow for reinforcement manufacturing. Further, the two approaches are compared and analyzed based on Multi-Criteria Decision Making (MCDM) methods. The results have shown promising prospects for companies willing to automate their data flow processes by the use of 3D drawings and digital data from the BIM model in their plants.","PeriodicalId":36795,"journal":{"name":"Journal of Sustainable Architecture and Civil Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Possibilities of Using Building Information Model Data in Reinforcement Processing Plant\",\"authors\":\"D. Pupeikis, Lina Morkunaite, M. Daukšys, A. Navickas, Svajūnas Abromas\",\"doi\":\"10.5755/j01.sace.28.1.27593\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"While the AEC industry is moving towards digitalization off-site rebar prefabrication became a common practice. Now most companies use a long-established standard order processing method, where the customer submits 2D paper or PDF-based drawings. Subsequently, the manufacturers are obligated to make additional detailing, redrawing, calculations, and preparation of other required information for manufacturing. Thus, in this typical scenario, there is a great repetition of the same tasks, with the obvious loss of time and increased likelihood of human error. However, improvements can be made by the application of advanced digital production workflow and the use of open BIM standards (e.g., IFC, XML, BVBS). Therefore, this paper presents the typical data flow algorithm in contrast to the automated data flow for reinforcement manufacturing. Further, the two approaches are compared and analyzed based on Multi-Criteria Decision Making (MCDM) methods. The results have shown promising prospects for companies willing to automate their data flow processes by the use of 3D drawings and digital data from the BIM model in their plants.\",\"PeriodicalId\":36795,\"journal\":{\"name\":\"Journal of Sustainable Architecture and Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Sustainable Architecture and Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5755/j01.sace.28.1.27593\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Sustainable Architecture and Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5755/j01.sace.28.1.27593","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 3

摘要

随着AEC行业走向数字化,非现场钢筋预制成为一种普遍做法。现在,大多数公司使用长期建立的标准订单处理方法,客户提交2D纸张或基于pdf的图纸。随后,制造商有义务进行额外的详细说明、重绘、计算和准备其他生产所需的信息。因此,在这个典型的场景中,相同的任务有大量的重复,明显地浪费了时间,并且增加了人为错误的可能性。然而,可以通过应用先进的数字生产工作流程和使用开放的BIM标准(例如,IFC, XML, BVBS)来进行改进。因此,本文提出了典型的数据流算法,并与钢筋制造的自动化数据流进行了对比。在此基础上,基于多准则决策方法对两种方法进行了比较和分析。研究结果显示,对于那些愿意在工厂中使用3D图纸和BIM模型中的数字数据来实现数据流流程自动化的公司来说,前景是光明的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Possibilities of Using Building Information Model Data in Reinforcement Processing Plant
While the AEC industry is moving towards digitalization off-site rebar prefabrication became a common practice. Now most companies use a long-established standard order processing method, where the customer submits 2D paper or PDF-based drawings. Subsequently, the manufacturers are obligated to make additional detailing, redrawing, calculations, and preparation of other required information for manufacturing. Thus, in this typical scenario, there is a great repetition of the same tasks, with the obvious loss of time and increased likelihood of human error. However, improvements can be made by the application of advanced digital production workflow and the use of open BIM standards (e.g., IFC, XML, BVBS). Therefore, this paper presents the typical data flow algorithm in contrast to the automated data flow for reinforcement manufacturing. Further, the two approaches are compared and analyzed based on Multi-Criteria Decision Making (MCDM) methods. The results have shown promising prospects for companies willing to automate their data flow processes by the use of 3D drawings and digital data from the BIM model in their plants.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
21
审稿时长
12 weeks
期刊最新文献
Prefab Light Clay-Timber Elements for Net Zero Whole-Life Carbon Buildings On-Site Application of End-Grain Bonded Timber Under Low Curing Temperatures Bending and Vibration Behaviour of CLT-Steel Composite Beams Bioinspired Living Coating System for Regenerative and Circular Architecture Technical State, Renovation Need and Performance of Renovation Solutions of Estonian Wooden Log Houses
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1