规划决策变更与集装箱码头效率

IF 2 Q3 BUSINESS Maritime Business Review Pub Date : 2022-02-10 DOI:10.1108/mabr-04-2021-0035
B. Weerasinghe, H. Perera, Phillip Kießner
{"title":"规划决策变更与集装箱码头效率","authors":"B. Weerasinghe, H. Perera, Phillip Kießner","doi":"10.1108/mabr-04-2021-0035","DOIUrl":null,"url":null,"abstract":"PurposeThis paper examines how the altering nature of planning decisions affects operational efficiency in seaport container terminals. The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface.Design/methodology/approachA System Dynamics model has been built to illustrate the integrated dynamic environment. Data collection was conducted at a leading container terminal at a hub port. The model was simulated for different scenarios to derive findings.FindingsThe planner has been identified as the agent who makes alterations between the initial operational plan and the actual plan. The initial plan remains uncertain even when there is no impact from crane breakdowns, requiring a significant number of alterations to be made. The planner who had worked on the yard plan had altered (approximately 45%) the initial plan than the alterations done by the planner who had worked on the vessel plan. As a result, the feedback loop that is created by the remaining moves at each hourly operation influences the upcoming operation as much as crane breakdowns influence.Originality/value The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface. The findings of this study are significant since terminal efficiency is examined considering the quayside and landside as an integrated system.","PeriodicalId":43865,"journal":{"name":"Maritime Business Review","volume":" ","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2022-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Planning decision alterations and container terminal efficiency\",\"authors\":\"B. Weerasinghe, H. Perera, Phillip Kießner\",\"doi\":\"10.1108/mabr-04-2021-0035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThis paper examines how the altering nature of planning decisions affects operational efficiency in seaport container terminals. The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface.Design/methodology/approachA System Dynamics model has been built to illustrate the integrated dynamic environment. Data collection was conducted at a leading container terminal at a hub port. The model was simulated for different scenarios to derive findings.FindingsThe planner has been identified as the agent who makes alterations between the initial operational plan and the actual plan. The initial plan remains uncertain even when there is no impact from crane breakdowns, requiring a significant number of alterations to be made. The planner who had worked on the yard plan had altered (approximately 45%) the initial plan than the alterations done by the planner who had worked on the vessel plan. As a result, the feedback loop that is created by the remaining moves at each hourly operation influences the upcoming operation as much as crane breakdowns influence.Originality/value The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface. The findings of this study are significant since terminal efficiency is examined considering the quayside and landside as an integrated system.\",\"PeriodicalId\":43865,\"journal\":{\"name\":\"Maritime Business Review\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-02-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Maritime Business Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/mabr-04-2021-0035\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Maritime Business Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/mabr-04-2021-0035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

摘要

目的研究规划决策的变化性质如何影响海港集装箱码头的运营效率。考虑码头-堆场界面的动态综合规划功能,对规划人员的不确定性和作用进行了研究。设计/方法/方法建立了一个系统动力学模型来说明集成的动态环境。数据收集在一个枢纽港的主要货柜码头进行。对该模型进行了不同情景的模拟以得出结论。发现计划者已被确定为在初始操作计划和实际计划之间进行更改的代理。即使没有起重机故障的影响,最初的计划仍然不确定,需要进行大量的修改。参与船厂规划的规划人员对初始规划的修改(约占45%)比参与船舶规划的规划人员所做的修改要多。因此,每小时作业的剩余动作所产生的反馈回路对即将进行的作业的影响与起重机故障的影响一样大。考虑码头-堆场界面的动态综合规划功能,探讨了规划人员的不确定性和角色。这项研究的结果是显著的,因为终端效率是考虑到码头侧和陆侧作为一个综合系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Planning decision alterations and container terminal efficiency
PurposeThis paper examines how the altering nature of planning decisions affects operational efficiency in seaport container terminals. The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface.Design/methodology/approachA System Dynamics model has been built to illustrate the integrated dynamic environment. Data collection was conducted at a leading container terminal at a hub port. The model was simulated for different scenarios to derive findings.FindingsThe planner has been identified as the agent who makes alterations between the initial operational plan and the actual plan. The initial plan remains uncertain even when there is no impact from crane breakdowns, requiring a significant number of alterations to be made. The planner who had worked on the yard plan had altered (approximately 45%) the initial plan than the alterations done by the planner who had worked on the vessel plan. As a result, the feedback loop that is created by the remaining moves at each hourly operation influences the upcoming operation as much as crane breakdowns influence.Originality/value The uncertainty and the role of the planner were investigated considering the dynamic integrated planning function of the quay to yard interface. The findings of this study are significant since terminal efficiency is examined considering the quayside and landside as an integrated system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.80
自引率
0.00%
发文量
19
期刊最新文献
Predictive modelling in the shipping industry: analysis from supply and demand sides Electric tugboat deployment in maritime transportation: detailed analysis of advantages and disadvantages Discovering supply chain operation towards sustainability using machine learning and DES techniques: a case study in Vietnam seafood Maritime logistics and digital transformation with big data: review and research trend Assessing risk dimensions in dry port projects: prioritization, interdependence and heterogeneity
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1