基于可靠性和风险中心维修方法的注塑机维修任务建议

Liza Nafiah Maulidina, F. T. D. Atmaji, J. Alhilman
{"title":"基于可靠性和风险中心维修方法的注塑机维修任务建议","authors":"Liza Nafiah Maulidina, F. T. D. Atmaji, J. Alhilman","doi":"10.21512/comtech.v10i2.5900","DOIUrl":null,"url":null,"abstract":"The objective of this research was to determine the optimal maintenance time interval for the selected critical components and the total cost of maintenance of a plastic injection machine. In determining the critical components, a risk matrix was used, and three components were selected, namely, hydraulic hose, barrel, and motor. Using the Reliability and Risk Centered Maintenance (RRCM) method, the researchers got a proposed maintenance policy and the total maintenance cost. Based on the result, it shows that there are seven proposed maintenance tasks with three scheduled oncondition tasks and four scheduled restoration tasks with an average maintenance interval of two months. The total maintenance cost proposed is IDR91.595.318. The cost is smaller compared to the actual maintenance costs of the company.","PeriodicalId":31095,"journal":{"name":"ComTech","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry\",\"authors\":\"Liza Nafiah Maulidina, F. T. D. Atmaji, J. Alhilman\",\"doi\":\"10.21512/comtech.v10i2.5900\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this research was to determine the optimal maintenance time interval for the selected critical components and the total cost of maintenance of a plastic injection machine. In determining the critical components, a risk matrix was used, and three components were selected, namely, hydraulic hose, barrel, and motor. Using the Reliability and Risk Centered Maintenance (RRCM) method, the researchers got a proposed maintenance policy and the total maintenance cost. Based on the result, it shows that there are seven proposed maintenance tasks with three scheduled oncondition tasks and four scheduled restoration tasks with an average maintenance interval of two months. The total maintenance cost proposed is IDR91.595.318. The cost is smaller compared to the actual maintenance costs of the company.\",\"PeriodicalId\":31095,\"journal\":{\"name\":\"ComTech\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ComTech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21512/comtech.v10i2.5900\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ComTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21512/comtech.v10i2.5900","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本研究的目的是确定所选关键部件的最佳维护时间间隔和注塑机的总维护成本。在确定关键部件时,使用了风险矩阵,并选择了三个部件,即液压软管、筒体和电机。采用以可靠性和风险为中心的维修(RRCM)方法,研究人员得出了建议的维修策略和总维修成本。基于结果,提出了7项维护任务,其中3项为预定状态任务,4项为预定恢复任务,平均维护间隔为两个月。建议的总维护成本为91.595.318印尼盾。与公司的实际维护成本相比,成本较小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry
The objective of this research was to determine the optimal maintenance time interval for the selected critical components and the total cost of maintenance of a plastic injection machine. In determining the critical components, a risk matrix was used, and three components were selected, namely, hydraulic hose, barrel, and motor. Using the Reliability and Risk Centered Maintenance (RRCM) method, the researchers got a proposed maintenance policy and the total maintenance cost. Based on the result, it shows that there are seven proposed maintenance tasks with three scheduled oncondition tasks and four scheduled restoration tasks with an average maintenance interval of two months. The total maintenance cost proposed is IDR91.595.318. The cost is smaller compared to the actual maintenance costs of the company.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
16 weeks
期刊最新文献
Quality Function Deployment for Quality Performance Analysis in Indonesian Automotive Company for Engine Manufacturing Analytical Hierarchy Process for Enhancing Procurement Decision-Making in Project Phase: A Case Study in the Gold Mining Project Analytical Hierarchy Process (AHP), Economic Order Quantity (EOQ), and Reorder Point (ROP) in Inventory Management System Shoreline Change with Groin Coastal Protection Structure at North Java Beach The Application of Quality Function Deployment in Car Seat Industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1