对比分析执业者在泥沙修复项目中的经验,以突出最佳做法

IF 2.4 4区 环境科学与生态学 Q2 WATER RESOURCES Water Quality Research Journal Pub Date : 2018-11-16 DOI:10.2166/WQRJ.2018.020
Zobia Jawed, G. Krantzberg
{"title":"对比分析执业者在泥沙修复项目中的经验,以突出最佳做法","authors":"Zobia Jawed, G. Krantzberg","doi":"10.2166/WQRJ.2018.020","DOIUrl":null,"url":null,"abstract":"\n The Randle Reef contaminated site, located in the southwest corner of Hamilton Harbour, is approximately 60 hectares in size. This site contains approximately 695,000 m3 of sediment contaminated with polycyclic aromatic hydrocarbons (PAHs) and metals. The complex Randle Reef sediment remediation project is finally coming to fruition after more than 30 years of study, discussion, collaborations, stakeholder consensus-building, and debate. This paper unravels the reasons behind the delays associated with implementing sediment management at the Randle Reef site. In-depth interviews with experts and professionals from organizations who are/were involved in the project were conducted to identify the nature of performance in five theme areas that are important for successful action namely: (1) participation of appropriate actors with common objectives; (2) funding and resources; (3) decision-making process; (4) research and technology development; and (5) public and political support. It is evident from this study that the hurdles to progress with addressing contaminated sediment sites involve technical, political, regulatory as well as social challenges. We offer potential solutions and a series of recommendations based on experts' first-hand experience with the management of such complex sites to inform how future remediation projects can overcome obstacles.\n This article has been made Open Access thanks to the kind support of CAWQ/ACQE (https://www.cawq.ca).","PeriodicalId":23720,"journal":{"name":"Water Quality Research Journal","volume":" ","pages":""},"PeriodicalIF":2.4000,"publicationDate":"2018-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.2166/WQRJ.2018.020","citationCount":"3","resultStr":"{\"title\":\"A comparative analysis of practitioners' experience in sediment remediation projects to highlight best practices\",\"authors\":\"Zobia Jawed, G. Krantzberg\",\"doi\":\"10.2166/WQRJ.2018.020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Randle Reef contaminated site, located in the southwest corner of Hamilton Harbour, is approximately 60 hectares in size. This site contains approximately 695,000 m3 of sediment contaminated with polycyclic aromatic hydrocarbons (PAHs) and metals. The complex Randle Reef sediment remediation project is finally coming to fruition after more than 30 years of study, discussion, collaborations, stakeholder consensus-building, and debate. This paper unravels the reasons behind the delays associated with implementing sediment management at the Randle Reef site. In-depth interviews with experts and professionals from organizations who are/were involved in the project were conducted to identify the nature of performance in five theme areas that are important for successful action namely: (1) participation of appropriate actors with common objectives; (2) funding and resources; (3) decision-making process; (4) research and technology development; and (5) public and political support. It is evident from this study that the hurdles to progress with addressing contaminated sediment sites involve technical, political, regulatory as well as social challenges. We offer potential solutions and a series of recommendations based on experts' first-hand experience with the management of such complex sites to inform how future remediation projects can overcome obstacles.\\n This article has been made Open Access thanks to the kind support of CAWQ/ACQE (https://www.cawq.ca).\",\"PeriodicalId\":23720,\"journal\":{\"name\":\"Water Quality Research Journal\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2018-11-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.2166/WQRJ.2018.020\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Water Quality Research Journal\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://doi.org/10.2166/WQRJ.2018.020\",\"RegionNum\":4,\"RegionCategory\":\"环境科学与生态学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"WATER RESOURCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Water Quality Research Journal","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.2166/WQRJ.2018.020","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"WATER RESOURCES","Score":null,"Total":0}
引用次数: 3

摘要

兰德尔礁污染区位于汉密尔顿港西南角,面积约60公顷。该场地含有大约69.5万立方米被多环芳烃和金属污染的沉积物。经过30多年的研究、讨论、合作、利益相关者共识的建立和辩论,复杂的兰德尔礁沉积物修复项目终于取得了成果。本文揭示了在兰德尔礁遗址实施沉积物管理的延迟背后的原因。与参与项目的组织的专家和专业人员进行了深入访谈,以确定对成功行动至关重要的五个主题领域的表现性质,即:(1)有共同目标的适当行动者的参与;(二)资金和资源;(3)决策过程;(四)研究和技术开发;(5)公众和政治支持。从这项研究中可以明显看出,解决受污染沉积物地点的进展障碍涉及技术、政治、监管和社会挑战。我们根据专家管理此类复杂场地的第一手经验,提供潜在的解决方案和一系列建议,以告知未来的修复项目如何克服障碍。感谢CAWQ/ACQE (https://www.cawq.ca)的大力支持,本文已开放获取。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A comparative analysis of practitioners' experience in sediment remediation projects to highlight best practices
The Randle Reef contaminated site, located in the southwest corner of Hamilton Harbour, is approximately 60 hectares in size. This site contains approximately 695,000 m3 of sediment contaminated with polycyclic aromatic hydrocarbons (PAHs) and metals. The complex Randle Reef sediment remediation project is finally coming to fruition after more than 30 years of study, discussion, collaborations, stakeholder consensus-building, and debate. This paper unravels the reasons behind the delays associated with implementing sediment management at the Randle Reef site. In-depth interviews with experts and professionals from organizations who are/were involved in the project were conducted to identify the nature of performance in five theme areas that are important for successful action namely: (1) participation of appropriate actors with common objectives; (2) funding and resources; (3) decision-making process; (4) research and technology development; and (5) public and political support. It is evident from this study that the hurdles to progress with addressing contaminated sediment sites involve technical, political, regulatory as well as social challenges. We offer potential solutions and a series of recommendations based on experts' first-hand experience with the management of such complex sites to inform how future remediation projects can overcome obstacles. This article has been made Open Access thanks to the kind support of CAWQ/ACQE (https://www.cawq.ca).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.50
自引率
8.70%
发文量
0
期刊最新文献
Development and evaluation of filter for canal water potability Phosphorus removal and recovery from anaerobic bioreactor effluent using a batch electrocoagulation process A Fuzzy Inference System for enhanced groundwater quality assessment and index determination The risk of bacterial virulence in the face of concentrated river pollution Efficient removal of perfluorinated compounds with the polyamide nanofiltration membrane and membrane fouling resistance analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1