从灰色到绿色:将废弃、多余或不需要的基础设施改造成公园

IF 1 Q3 PUBLIC ADMINISTRATION Public Works Management & Policy Pub Date : 2022-09-24 DOI:10.1177/1087724x221129278
C. Lau
{"title":"从灰色到绿色:将废弃、多余或不需要的基础设施改造成公园","authors":"C. Lau","doi":"10.1177/1087724x221129278","DOIUrl":null,"url":null,"abstract":"This article discusses the conversion of abandoned, redundant, or unwanted infrastructure into parks to meet the needs of Los Angeles County residents. The author draws primarily from experience gained through the development and implementation of the Puente Hills Landfill Park Master Plan. The landfill is 1365 acres in size and has been closed since 2013. Completed in 2016, the Master Plan proposes to transform 142 acres of the landfill into the county’s first new regional park in over 30 years. This case study covers topics such as interagency coordination, community engagement, park master plan development, and funding to develop, operate, and maintain the park. Lessons learned are applicable for the conversion of landfills to parks in other places as well as the transformation of other infrastructure into parkland, especially in park-poor areas where the remaining opportunities to create new parks are largely limited to the restoration of degraded lands.","PeriodicalId":45483,"journal":{"name":"Public Works Management & Policy","volume":"28 1","pages":"53 - 69"},"PeriodicalIF":1.0000,"publicationDate":"2022-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"From Grey to Green: Transforming Abandoned, Redundant, or Unwanted Infrastructure Into Parks\",\"authors\":\"C. Lau\",\"doi\":\"10.1177/1087724x221129278\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article discusses the conversion of abandoned, redundant, or unwanted infrastructure into parks to meet the needs of Los Angeles County residents. The author draws primarily from experience gained through the development and implementation of the Puente Hills Landfill Park Master Plan. The landfill is 1365 acres in size and has been closed since 2013. Completed in 2016, the Master Plan proposes to transform 142 acres of the landfill into the county’s first new regional park in over 30 years. This case study covers topics such as interagency coordination, community engagement, park master plan development, and funding to develop, operate, and maintain the park. Lessons learned are applicable for the conversion of landfills to parks in other places as well as the transformation of other infrastructure into parkland, especially in park-poor areas where the remaining opportunities to create new parks are largely limited to the restoration of degraded lands.\",\"PeriodicalId\":45483,\"journal\":{\"name\":\"Public Works Management & Policy\",\"volume\":\"28 1\",\"pages\":\"53 - 69\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2022-09-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Public Works Management & Policy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/1087724x221129278\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"PUBLIC ADMINISTRATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Public Works Management & Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1087724x221129278","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 0

摘要

本文讨论了将废弃、多余或不需要的基础设施改建为公园,以满足洛杉矶县居民的需求。作者主要借鉴了普恩特山垃圾填埋场公园总体规划的制定和实施过程中获得的经验。该垃圾填埋场占地1365英亩,自2013年以来一直处于关闭状态。该总体规划于2016年完成,计划将142英亩的垃圾填埋场改造成该县30多年来第一个新的区域公园。本案例研究涵盖了机构间协调、社区参与、公园总体规划制定以及公园开发、运营和维护资金等主题。经验教训适用于将垃圾填埋场改为其他地方的公园,以及将其他基础设施改为公园,特别是在公园贫困地区,在这些地区,创建新公园的剩余机会在很大程度上仅限于恢复退化的土地。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
From Grey to Green: Transforming Abandoned, Redundant, or Unwanted Infrastructure Into Parks
This article discusses the conversion of abandoned, redundant, or unwanted infrastructure into parks to meet the needs of Los Angeles County residents. The author draws primarily from experience gained through the development and implementation of the Puente Hills Landfill Park Master Plan. The landfill is 1365 acres in size and has been closed since 2013. Completed in 2016, the Master Plan proposes to transform 142 acres of the landfill into the county’s first new regional park in over 30 years. This case study covers topics such as interagency coordination, community engagement, park master plan development, and funding to develop, operate, and maintain the park. Lessons learned are applicable for the conversion of landfills to parks in other places as well as the transformation of other infrastructure into parkland, especially in park-poor areas where the remaining opportunities to create new parks are largely limited to the restoration of degraded lands.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Public Works Management & Policy
Public Works Management & Policy PUBLIC ADMINISTRATION-
CiteScore
2.00
自引率
7.10%
发文量
41
期刊介绍: PUBLIC WORKS MANAGEMENT & POLICY: RESEARCH AND PRACTICE IN TRANSPORTATION, INFRASTRUCTURE, AND THE ENVIRONMENT is a peer-reviewed journal for academics and practitioners in public works and the public and private infrastructure industries. This journal addresses the planning, financing, development, and operations of civil infrastructure systems at all levels of society— from federal policy to the demand for, and delivery of, state and local public works services. PWMP solicits manuscripts that convey research results, evaluate management innovations, suggest methods of analysis and evaluation, and examine policy issues.
期刊最新文献
Politics, Policy, and Pain: Paying for Infrastructure in Pressing Times Risky Decisions Over Troubled Waters: Public Works Directors’ Sea Level Rise Risk Attitudes Changing Tides and Changing Winds: A Time to Change Gears Persisting Cost Overruns in Public Infrastructure Projects: Lessons From the Belgian Case The Impact of Leadership Behaviour on Management Effectiveness in Public Construction Project Organizations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1