铁矿地质研究经费筹措与组织的国内特点

A. Balega, M. Kurylo
{"title":"铁矿地质研究经费筹措与组织的国内特点","authors":"A. Balega, M. Kurylo","doi":"10.31996/MRU.2019.2.34-39","DOIUrl":null,"url":null,"abstract":"The mineral base of iron ores is characterized by intensive use and includes explored and pre-explored reserves, most of which belong to a distributed subsurface fund. The objects of accounting (deposits) are grouped according to the size of stocks and on the basis of involvement in industrial development. The allocated groups of deposits, for which the volumes of reserves are set, make up 100 million tons, 100–500 million tons, 500–1000 million tons. and more than 1000 million tons. The grouping of reserves of iron ore deposits by size allows us to state that about 80 % of the reserves of iron ores for the developed deposits are provided with reserves of 500 million tons. and more, which confirms the average level of their exhaustion. The degree of provision of iron ore reserves according to the existing special permits for the use of subsoil and project output for production was introduced. Groups of fields for which the terms are set are up to 30 years, 30–50 years, 50–100 years and over 100 years. It has been determined that financing of exploration works (GAR) for iron ores in the framework of the current National Program for the Development of the Mineral Base of Ukraine until 2030 is provided exclusively at state cost and non-state funding is not taken into account. In order to identify the optimal distribution of financing for exploration works by stages, comparison of funding rates under the Program up to 2030 with the distribution of the main geological risks and general risks of mining business has been made. At the stage of search and search-and-appraisal, a high level of geological risks of 50 % and mining risks in 70 % is accompanied by public funding for iron ore and reaches a critical value of 80 % with a similar indicator for the entire program at 65,7 %. The level of financing of the III stage of exploration for iron ore accounts for 20 % of the total volume, with a rather low level of geological risks of 10 % and mining risks at 10 %, respectively.","PeriodicalId":52937,"journal":{"name":"Mineral''ni resursi Ukraini","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DOMESTIC PECULIARITIES OF FINANCING AND ORGANIZING GEOLOGICAL RESEARCH OF IRON ORES\",\"authors\":\"A. Balega, M. Kurylo\",\"doi\":\"10.31996/MRU.2019.2.34-39\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The mineral base of iron ores is characterized by intensive use and includes explored and pre-explored reserves, most of which belong to a distributed subsurface fund. The objects of accounting (deposits) are grouped according to the size of stocks and on the basis of involvement in industrial development. The allocated groups of deposits, for which the volumes of reserves are set, make up 100 million tons, 100–500 million tons, 500–1000 million tons. and more than 1000 million tons. The grouping of reserves of iron ore deposits by size allows us to state that about 80 % of the reserves of iron ores for the developed deposits are provided with reserves of 500 million tons. and more, which confirms the average level of their exhaustion. The degree of provision of iron ore reserves according to the existing special permits for the use of subsoil and project output for production was introduced. Groups of fields for which the terms are set are up to 30 years, 30–50 years, 50–100 years and over 100 years. It has been determined that financing of exploration works (GAR) for iron ores in the framework of the current National Program for the Development of the Mineral Base of Ukraine until 2030 is provided exclusively at state cost and non-state funding is not taken into account. In order to identify the optimal distribution of financing for exploration works by stages, comparison of funding rates under the Program up to 2030 with the distribution of the main geological risks and general risks of mining business has been made. At the stage of search and search-and-appraisal, a high level of geological risks of 50 % and mining risks in 70 % is accompanied by public funding for iron ore and reaches a critical value of 80 % with a similar indicator for the entire program at 65,7 %. The level of financing of the III stage of exploration for iron ore accounts for 20 % of the total volume, with a rather low level of geological risks of 10 % and mining risks at 10 %, respectively.\",\"PeriodicalId\":52937,\"journal\":{\"name\":\"Mineral''ni resursi Ukraini\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mineral''ni resursi Ukraini\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31996/MRU.2019.2.34-39\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mineral''ni resursi Ukraini","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31996/MRU.2019.2.34-39","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

铁矿的矿物基础具有集约利用的特点,包括已探明储量和预探明储量,大部分属于分布的地下基金。会计核算的对象(存款)是根据股票的大小和参与工业发展的程度来分组的。分配的储量组分为1亿吨、1 - 5亿吨、5 - 10亿吨。超过10亿吨。将铁矿床储量按大小分组,我们可以说,在已开发矿床中,约80%的铁矿石储量为5亿吨储量。还有更多,这证实了他们的平均疲惫程度。介绍了根据现有底土利用特别许可证和项目产量提供铁矿储量的程度。设置期限的字段组为30年、30 - 50年、50-100年和100年以上。已确定,在目前的《到2030年乌克兰矿产基地发展国家计划》框架内,铁矿石勘探工程(GAR)的融资完全以国家成本提供,不考虑非国家资金。为了确定勘探工程分期融资的最优分配,将计划下至2030年的融资率与主要地质风险和采矿业务一般风险的分布进行了比较。在勘查和勘查评价阶段,高水平的地质风险为50%,高水平的采矿风险为70%,伴随着铁矿的公共资金,达到80%的临界值,整个项目的类似指标为65.7%。铁矿勘探第三阶段融资水平占总量的20%,地质风险水平较低,为10%,采矿风险水平较低,为10%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
DOMESTIC PECULIARITIES OF FINANCING AND ORGANIZING GEOLOGICAL RESEARCH OF IRON ORES
The mineral base of iron ores is characterized by intensive use and includes explored and pre-explored reserves, most of which belong to a distributed subsurface fund. The objects of accounting (deposits) are grouped according to the size of stocks and on the basis of involvement in industrial development. The allocated groups of deposits, for which the volumes of reserves are set, make up 100 million tons, 100–500 million tons, 500–1000 million tons. and more than 1000 million tons. The grouping of reserves of iron ore deposits by size allows us to state that about 80 % of the reserves of iron ores for the developed deposits are provided with reserves of 500 million tons. and more, which confirms the average level of their exhaustion. The degree of provision of iron ore reserves according to the existing special permits for the use of subsoil and project output for production was introduced. Groups of fields for which the terms are set are up to 30 years, 30–50 years, 50–100 years and over 100 years. It has been determined that financing of exploration works (GAR) for iron ores in the framework of the current National Program for the Development of the Mineral Base of Ukraine until 2030 is provided exclusively at state cost and non-state funding is not taken into account. In order to identify the optimal distribution of financing for exploration works by stages, comparison of funding rates under the Program up to 2030 with the distribution of the main geological risks and general risks of mining business has been made. At the stage of search and search-and-appraisal, a high level of geological risks of 50 % and mining risks in 70 % is accompanied by public funding for iron ore and reaches a critical value of 80 % with a similar indicator for the entire program at 65,7 %. The level of financing of the III stage of exploration for iron ore accounts for 20 % of the total volume, with a rather low level of geological risks of 10 % and mining risks at 10 %, respectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.30
自引率
0.00%
发文量
6
审稿时长
6 weeks
期刊最新文献
Gas-dynamic processes and causes of accidents at mines Деякі аспекти впровадження сучасних технологій буріння глибоких нафтових і газових свердловин (оглядова стаття) Scientific and applied significance of late devonian paleontological thin sections collection (algoflora) stored in the Institute of Geological Sciences of the National Academy of Sciences of Ukraine Геодинамічні сили – визначальні фактори в еволюції фауни і флори земної кори Дослідження процесів ретроградної конденсації важких вуглеводнів у привибійній зоні газоконденсатних свердловин
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1