{"title":"分析城市人行横道上行人与车辆的冲突行为","authors":"B. Mirbaha","doi":"10.1680/jmuen.21.00016","DOIUrl":null,"url":null,"abstract":"Pedestrian safety has become a serious problem with the rapid growth of motorised vehicle in transportation system in developing counties. Pedestrians often respond differently to changes in surrounding and traffic conditions. A study was undertaken to investigate pedestrians’ gap acceptance and the parameters affecting their risk-taking behaviours based on time-to-collision and post-encroachment-time indexes. Three signalised intersections and two midblock crossings were selected in Qazvin, Iran. A total of 752 pedestrians were examined by video recording and field observation, and pedestrians’ gap acceptance behaviour was estimated by using binary logit model. Results showed that the average time to collision and post-encroachment time were 4.27 s and 1.44 s, respectively. In addition, the presence of children alongside the older pedestrians led to a less risk-taking crossing. Additionally, pedestrian risk-taking was reduced by increasing both time indexes. Rainy weather also reduced pedestrians’ risk-taking behaviour. Elasticity analysis indicated that parameters such as pedestrians’ conflict with vehicles at the first or second half of the crossings, walking with a child, speed of the approaching vehicle, the crossing type and running while crossing were the most important factors in pedestrian risk-taking.","PeriodicalId":54571,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Municipal Engineer","volume":"39 9 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysing pedestrian–vehicle conflicts behaviour at urban pedestrian crossings\",\"authors\":\"B. Mirbaha\",\"doi\":\"10.1680/jmuen.21.00016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pedestrian safety has become a serious problem with the rapid growth of motorised vehicle in transportation system in developing counties. Pedestrians often respond differently to changes in surrounding and traffic conditions. A study was undertaken to investigate pedestrians’ gap acceptance and the parameters affecting their risk-taking behaviours based on time-to-collision and post-encroachment-time indexes. Three signalised intersections and two midblock crossings were selected in Qazvin, Iran. A total of 752 pedestrians were examined by video recording and field observation, and pedestrians’ gap acceptance behaviour was estimated by using binary logit model. Results showed that the average time to collision and post-encroachment time were 4.27 s and 1.44 s, respectively. In addition, the presence of children alongside the older pedestrians led to a less risk-taking crossing. Additionally, pedestrian risk-taking was reduced by increasing both time indexes. Rainy weather also reduced pedestrians’ risk-taking behaviour. Elasticity analysis indicated that parameters such as pedestrians’ conflict with vehicles at the first or second half of the crossings, walking with a child, speed of the approaching vehicle, the crossing type and running while crossing were the most important factors in pedestrian risk-taking.\",\"PeriodicalId\":54571,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Municipal Engineer\",\"volume\":\"39 9 1\",\"pages\":\"\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Municipal Engineer\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jmuen.21.00016\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Municipal Engineer","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jmuen.21.00016","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Analysing pedestrian–vehicle conflicts behaviour at urban pedestrian crossings
Pedestrian safety has become a serious problem with the rapid growth of motorised vehicle in transportation system in developing counties. Pedestrians often respond differently to changes in surrounding and traffic conditions. A study was undertaken to investigate pedestrians’ gap acceptance and the parameters affecting their risk-taking behaviours based on time-to-collision and post-encroachment-time indexes. Three signalised intersections and two midblock crossings were selected in Qazvin, Iran. A total of 752 pedestrians were examined by video recording and field observation, and pedestrians’ gap acceptance behaviour was estimated by using binary logit model. Results showed that the average time to collision and post-encroachment time were 4.27 s and 1.44 s, respectively. In addition, the presence of children alongside the older pedestrians led to a less risk-taking crossing. Additionally, pedestrian risk-taking was reduced by increasing both time indexes. Rainy weather also reduced pedestrians’ risk-taking behaviour. Elasticity analysis indicated that parameters such as pedestrians’ conflict with vehicles at the first or second half of the crossings, walking with a child, speed of the approaching vehicle, the crossing type and running while crossing were the most important factors in pedestrian risk-taking.
期刊介绍:
Municipal Engineer publishes international peer reviewed research, best practice, case study and project papers reports. The journal proudly enjoys an international readership and actively encourages international Panel members and authors. The journal covers the effect of civil engineering on local community such as technical issues, political interface and community participation, the sustainability agenda, cultural context, and the key dimensions of procurement, management and finance. This also includes public services, utilities, and transport. Research needs to be transferable and of interest to a wide international audience. Please ensure that municipal aspects are considered in all submissions. We are happy to consider research papers/reviews/briefing articles.