{"title":"在确定最佳铁路干预方案时,需要信息的准确性","authors":"M. Burkhalter, B. Adey","doi":"10.1680/jinam.20.00032","DOIUrl":null,"url":null,"abstract":"Over the past decade, there has been a notable increase in mathematical models for determining optimal intervention programmes – that is, those with the highest net benefits. These increasingly sop...","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"19 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2021-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Required accuracy of information when determining optimal railway intervention programmes\",\"authors\":\"M. Burkhalter, B. Adey\",\"doi\":\"10.1680/jinam.20.00032\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Over the past decade, there has been a notable increase in mathematical models for determining optimal intervention programmes – that is, those with the highest net benefits. These increasingly sop...\",\"PeriodicalId\":43387,\"journal\":{\"name\":\"Infrastructure Asset Management\",\"volume\":\"19 1\",\"pages\":\"\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2021-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Infrastructure Asset Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jinam.20.00032\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.20.00032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Required accuracy of information when determining optimal railway intervention programmes
Over the past decade, there has been a notable increase in mathematical models for determining optimal intervention programmes – that is, those with the highest net benefits. These increasingly sop...