{"title":"拔钻时钻头下压力下降预测方法分析","authors":"F. Akhundov","doi":"10.37474/0365-8554/2022-11-15-19","DOIUrl":null,"url":null,"abstract":"The analysis of existing surveys associated with the occurrence of gas shows in the well drilling, for the elimination of which a great amount of cost and time spent has been carried out. The most widespread of them are the complications of gas shows while pulling-out of drilling tool from the well. It was revealed that to prevent such complications, it is necessary to reduce the pressure of drilling mud under the bit of pulled-out drill stem from the well. Existing methods of reducing the fluid pressure under the drill bit of a pulled-out drilling tool lie in the fill-up of drilling mud through the borehole annulus with special fill-up devices. Therefore, the fill-up is conducted through various quantities of pulled-out flares. Considering this, we offer a method of specification of reducing fluid pressure under the bit of pulled-out drill stem via squeezing the drilling mud through the drilling tubes. The fill-up period is defined from the graphics of continuous changes of shearing strength in time obtained during the periodic deterioration of structure in the moments of a maximum value of shearing strength via stirring the drilling mud in shearing rates corresponding to the speed of pulling-out of drilling tool. The maximum value of the shearing strength is specified via the dependence provided","PeriodicalId":8668,"journal":{"name":"Azerbaijan Oil Industry","volume":"83 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of prediction methods of pressure decrease under drill bit while pulling-out drilling tool\",\"authors\":\"F. Akhundov\",\"doi\":\"10.37474/0365-8554/2022-11-15-19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The analysis of existing surveys associated with the occurrence of gas shows in the well drilling, for the elimination of which a great amount of cost and time spent has been carried out. The most widespread of them are the complications of gas shows while pulling-out of drilling tool from the well. It was revealed that to prevent such complications, it is necessary to reduce the pressure of drilling mud under the bit of pulled-out drill stem from the well. Existing methods of reducing the fluid pressure under the drill bit of a pulled-out drilling tool lie in the fill-up of drilling mud through the borehole annulus with special fill-up devices. Therefore, the fill-up is conducted through various quantities of pulled-out flares. Considering this, we offer a method of specification of reducing fluid pressure under the bit of pulled-out drill stem via squeezing the drilling mud through the drilling tubes. The fill-up period is defined from the graphics of continuous changes of shearing strength in time obtained during the periodic deterioration of structure in the moments of a maximum value of shearing strength via stirring the drilling mud in shearing rates corresponding to the speed of pulling-out of drilling tool. The maximum value of the shearing strength is specified via the dependence provided\",\"PeriodicalId\":8668,\"journal\":{\"name\":\"Azerbaijan Oil Industry\",\"volume\":\"83 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Azerbaijan Oil Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37474/0365-8554/2022-11-15-19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Azerbaijan Oil Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37474/0365-8554/2022-11-15-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis of prediction methods of pressure decrease under drill bit while pulling-out drilling tool
The analysis of existing surveys associated with the occurrence of gas shows in the well drilling, for the elimination of which a great amount of cost and time spent has been carried out. The most widespread of them are the complications of gas shows while pulling-out of drilling tool from the well. It was revealed that to prevent such complications, it is necessary to reduce the pressure of drilling mud under the bit of pulled-out drill stem from the well. Existing methods of reducing the fluid pressure under the drill bit of a pulled-out drilling tool lie in the fill-up of drilling mud through the borehole annulus with special fill-up devices. Therefore, the fill-up is conducted through various quantities of pulled-out flares. Considering this, we offer a method of specification of reducing fluid pressure under the bit of pulled-out drill stem via squeezing the drilling mud through the drilling tubes. The fill-up period is defined from the graphics of continuous changes of shearing strength in time obtained during the periodic deterioration of structure in the moments of a maximum value of shearing strength via stirring the drilling mud in shearing rates corresponding to the speed of pulling-out of drilling tool. The maximum value of the shearing strength is specified via the dependence provided