变化的地质条件对泰晤士河潮汐隧道掘进机性能的影响

IF 2 4区 工程技术 Q3 ENGINEERING, GEOLOGICAL Proceedings of the Institution of Civil Engineers-Geotechnical Engineering Pub Date : 2022-06-20 DOI:10.1680/jgeen.22.00060
T. Newman, Oscar Hueso Cuberos, Mikel Martinez Goirigolzarri
{"title":"变化的地质条件对泰晤士河潮汐隧道掘进机性能的影响","authors":"T. Newman, Oscar Hueso Cuberos, Mikel Martinez Goirigolzarri","doi":"10.1680/jgeen.22.00060","DOIUrl":null,"url":null,"abstract":"An 8.8 m diameter earth pressure balance tunnel boring machine has been used to construct a 7.6 km section of the Thames Tideway Tunnel through central London, UK, between Battersea and Bermondsey. Two major geological structures: the Lambeth Anticline and the London Bridge Fault Zone have imposed significant changes in the tunnel face geology. The tunnel boring machine was continually monitored for operating parameters, such as cutterhead torque, thrust and injection of spoil conditioning additives. This led to the recognition of the structures, in addition to a high frequency of sand channels within the upper Lambeth Group strata. The monitoring led to validation of the preconstruction geological model and in conjunction with inspection of the tunnel face during scheduled interventions and geological logging of several interception shafts, has provided valuable assurances for the predicted ground ahead of tunnelling operations.","PeriodicalId":54572,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","volume":"11 1","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2022-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Effects of changing geology on the performance of a Thames Tideway tunnel boring machine\",\"authors\":\"T. Newman, Oscar Hueso Cuberos, Mikel Martinez Goirigolzarri\",\"doi\":\"10.1680/jgeen.22.00060\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An 8.8 m diameter earth pressure balance tunnel boring machine has been used to construct a 7.6 km section of the Thames Tideway Tunnel through central London, UK, between Battersea and Bermondsey. Two major geological structures: the Lambeth Anticline and the London Bridge Fault Zone have imposed significant changes in the tunnel face geology. The tunnel boring machine was continually monitored for operating parameters, such as cutterhead torque, thrust and injection of spoil conditioning additives. This led to the recognition of the structures, in addition to a high frequency of sand channels within the upper Lambeth Group strata. The monitoring led to validation of the preconstruction geological model and in conjunction with inspection of the tunnel face during scheduled interventions and geological logging of several interception shafts, has provided valuable assurances for the predicted ground ahead of tunnelling operations.\",\"PeriodicalId\":54572,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jgeen.22.00060\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jgeen.22.00060","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 1

摘要

一台直径8.8米的土压平衡隧道掘进机已被用于建造一段7.6公里的泰晤士河潮汐隧道,该隧道穿过英国伦敦市中心,位于巴特西和伯蒙德之间。兰贝斯背斜和伦敦桥断裂带两大地质构造使隧道工作面地质发生了重大变化。连续监测隧道掘进机的工作参数,如刀盘扭矩、推力和废石调理添加剂的注入。这导致了构造的识别,以及在Lambeth群上部地层中砂道的高频率。监测结果验证了施工前的地质模型,并在预定的干预期间对隧道工作面进行了检查,并对几个拦截井进行了地质测井,为隧道施工前的预测地面提供了宝贵的保证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Effects of changing geology on the performance of a Thames Tideway tunnel boring machine
An 8.8 m diameter earth pressure balance tunnel boring machine has been used to construct a 7.6 km section of the Thames Tideway Tunnel through central London, UK, between Battersea and Bermondsey. Two major geological structures: the Lambeth Anticline and the London Bridge Fault Zone have imposed significant changes in the tunnel face geology. The tunnel boring machine was continually monitored for operating parameters, such as cutterhead torque, thrust and injection of spoil conditioning additives. This led to the recognition of the structures, in addition to a high frequency of sand channels within the upper Lambeth Group strata. The monitoring led to validation of the preconstruction geological model and in conjunction with inspection of the tunnel face during scheduled interventions and geological logging of several interception shafts, has provided valuable assurances for the predicted ground ahead of tunnelling operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.40
自引率
4.50%
发文量
68
审稿时长
3 months
期刊介绍: Geotechnical Engineering provides a forum for the publication of high quality, topical and relevant technical papers covering all aspects of geotechnical research, design, construction and performance. The journal aims to be of interest to those civil, structural or geotechnical engineering practitioners wishing to develop a greater understanding of the influence of geotechnics on the built environment.
期刊最新文献
A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data Torsional vibration of a tapered pile considering circumferential support of surrounding soil Applicability of construction dewatering techniques for randomly fractured rock Sensitivity investigation of drilling efficiency to operational parameters of a drifter Hyperbolic load-displacement analysis of helical and expanded piles: database approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1