{"title":"导流技术在非常规资源领域的应用","authors":"A. Sadykov, S. Baki, Karim Mechkak, A. Momin, J. Rueda, S. Kazakoff, Abdullah Kalbani, Mohammed Kurdi, N. Mulhim","doi":"10.2118/194791-MS","DOIUrl":null,"url":null,"abstract":"\n Saudi Aramco has made substantial progress in developing its unconventional gas resources with Plug and Perf (PnP) completions and multistage slickwater fracturing, with optimal production performance. Wells in Jafurah basin are generally completed with 5,000 feet horizontal lateral and up to 33 stages with 4 to 5 clusters per stage. Increasing the number of clusters per stage in such completions could lead to cost and efficiency optimization, but also increases the risk of having non-stimulated clusters, considering geomechanical heterogeneity, and without providing sufficient pumping rate. Thus introducing diversion techniques becomes a necessity in this unconventional play to optimize cluster efficiency, improve operational efficiency, and thus reduce cost.\n Near wellbore chemical particulates and intra-well perforation mechanical diversion techniques from degradable materials found their wide application in different unconventional assets. A mega-diversion experiment with both techniques took place in one of the wells, where a damaged section of the lateral did not allow regular PnP operations at the toe. Laboratory tests before operation ensured degradation of the material is within operational thresholds for positive isolation. The lateral section below the casing deformation (1,200 ft in the toe section) was planned with 30 clusters in one single stage, with the intrawell diversion technique. Another eight stages in 1,200 feet were attempted with a standard five cluster stages as a baseline. The remaining 2,400 feet of the lateral were stimulated with eight stages, 10 clusters per stage, and sequential application of both intrawell mechanical and near wellbore diversion technologies. Other wells in the area, which had damage in the casing, were also completed with mechanical diverters.\n The 1,200 ft lateral section was successfully stimulated without additional well intervention operations with a selected diversion technique. Proppant placement challenges were encountered in the regular five cluster stages with significant improvement in the subsequent 10 cluster stages introducing diversion. Positive diversion indication was confirmed by surface pressure observations and mainly proppant placement success. Multiple instances of non-typical pressure behavior were observed during placement of the mega-diversion stages. This pressure behavior is the subject of technical analysis and results will feed into the future design strategy.\n The intrawell mechanical diversion technique showed positive diversion indications in different wells in Saudi Arabia, with good repeatability of slickwater propped fracturing treatment success. This technique could be utilized whenever wellbore accessibility challenges are encountered, or during refracturing application cases. Both diversion technques could be used efficiently to stimulate the clusters and optimize well intervention operations, by minimizing the number of stages per well without compromising stimulated reservoir volume.","PeriodicalId":10908,"journal":{"name":"Day 2 Tue, March 19, 2019","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Diversion Techniques Applications in Unconventional Resources Fields\",\"authors\":\"A. Sadykov, S. Baki, Karim Mechkak, A. Momin, J. Rueda, S. Kazakoff, Abdullah Kalbani, Mohammed Kurdi, N. Mulhim\",\"doi\":\"10.2118/194791-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Saudi Aramco has made substantial progress in developing its unconventional gas resources with Plug and Perf (PnP) completions and multistage slickwater fracturing, with optimal production performance. Wells in Jafurah basin are generally completed with 5,000 feet horizontal lateral and up to 33 stages with 4 to 5 clusters per stage. Increasing the number of clusters per stage in such completions could lead to cost and efficiency optimization, but also increases the risk of having non-stimulated clusters, considering geomechanical heterogeneity, and without providing sufficient pumping rate. Thus introducing diversion techniques becomes a necessity in this unconventional play to optimize cluster efficiency, improve operational efficiency, and thus reduce cost.\\n Near wellbore chemical particulates and intra-well perforation mechanical diversion techniques from degradable materials found their wide application in different unconventional assets. A mega-diversion experiment with both techniques took place in one of the wells, where a damaged section of the lateral did not allow regular PnP operations at the toe. Laboratory tests before operation ensured degradation of the material is within operational thresholds for positive isolation. The lateral section below the casing deformation (1,200 ft in the toe section) was planned with 30 clusters in one single stage, with the intrawell diversion technique. Another eight stages in 1,200 feet were attempted with a standard five cluster stages as a baseline. The remaining 2,400 feet of the lateral were stimulated with eight stages, 10 clusters per stage, and sequential application of both intrawell mechanical and near wellbore diversion technologies. Other wells in the area, which had damage in the casing, were also completed with mechanical diverters.\\n The 1,200 ft lateral section was successfully stimulated without additional well intervention operations with a selected diversion technique. Proppant placement challenges were encountered in the regular five cluster stages with significant improvement in the subsequent 10 cluster stages introducing diversion. Positive diversion indication was confirmed by surface pressure observations and mainly proppant placement success. Multiple instances of non-typical pressure behavior were observed during placement of the mega-diversion stages. This pressure behavior is the subject of technical analysis and results will feed into the future design strategy.\\n The intrawell mechanical diversion technique showed positive diversion indications in different wells in Saudi Arabia, with good repeatability of slickwater propped fracturing treatment success. This technique could be utilized whenever wellbore accessibility challenges are encountered, or during refracturing application cases. Both diversion technques could be used efficiently to stimulate the clusters and optimize well intervention operations, by minimizing the number of stages per well without compromising stimulated reservoir volume.\",\"PeriodicalId\":10908,\"journal\":{\"name\":\"Day 2 Tue, March 19, 2019\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, March 19, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/194791-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, March 19, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194791-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

沙特阿美公司在非常规天然气资源开发方面取得了重大进展,采用了Plug and Perf (PnP)完井和多级滑溜水压裂技术,并取得了最佳的生产性能。Jafurah盆地的井通常有5000英尺的水平段,最多可达33级,每级4到5个簇。在此类完井中,增加每级压裂簇的数量可以实现成本和效率的优化,但考虑到地质力学的非均匀性,并且没有提供足够的泵速,也会增加未增产压裂簇的风险。因此,为了优化簇效率,提高作业效率,从而降低成本,在非常规油气藏中引入导流技术是必要的。近井化学颗粒和井内可降解材料射孔机械导流技术在不同的非常规资产中得到了广泛的应用。在其中一口井中进行了两种技术的大型转向试验,该井的分支段受损,无法在趾部进行常规的PnP操作。操作前的实验室测试确保材料的降解在正隔离的操作阈值范围内。在套管变形段以下的水平段(趾段1200英尺处),计划采用井内导流技术,一次压裂30个簇。在1200英尺的井段中,以标准的5级井段为基准,尝试了另外8级井段。其余2400英尺的分支段采用8级压裂,每级压裂10个压裂簇,并依次采用井内机械和近井导流技术。该地区其他套管受损的井也使用了机械转喷器。采用选定的导流技术,在没有额外干预井作业的情况下,成功增产了1200英尺的水平段。在常规的5个压裂段中,支撑剂的放置遇到了挑战,在随后的10个压裂段中,引入了导流技术,支撑剂的放置得到了显著改善。通过地面压力观测和支撑剂投放成功,证实了正向导流迹象。在巨型导流段的布置过程中,观察到多个非典型压力行为。这种压力行为是技术分析的主题,其结果将提供给未来的设计策略。在沙特阿拉伯的不同井中,井内机械导流技术显示出积极的导流迹象,具有良好的滑溜水支撑压裂成功重复性。每当遇到井筒可达性问题或重复压裂应用时,都可以使用该技术。这两种导流技术都可以有效地用于增产簇和优化油井干预作业,在不影响增产油藏体积的情况下,减少每口井的压裂段数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Diversion Techniques Applications in Unconventional Resources Fields
Saudi Aramco has made substantial progress in developing its unconventional gas resources with Plug and Perf (PnP) completions and multistage slickwater fracturing, with optimal production performance. Wells in Jafurah basin are generally completed with 5,000 feet horizontal lateral and up to 33 stages with 4 to 5 clusters per stage. Increasing the number of clusters per stage in such completions could lead to cost and efficiency optimization, but also increases the risk of having non-stimulated clusters, considering geomechanical heterogeneity, and without providing sufficient pumping rate. Thus introducing diversion techniques becomes a necessity in this unconventional play to optimize cluster efficiency, improve operational efficiency, and thus reduce cost. Near wellbore chemical particulates and intra-well perforation mechanical diversion techniques from degradable materials found their wide application in different unconventional assets. A mega-diversion experiment with both techniques took place in one of the wells, where a damaged section of the lateral did not allow regular PnP operations at the toe. Laboratory tests before operation ensured degradation of the material is within operational thresholds for positive isolation. The lateral section below the casing deformation (1,200 ft in the toe section) was planned with 30 clusters in one single stage, with the intrawell diversion technique. Another eight stages in 1,200 feet were attempted with a standard five cluster stages as a baseline. The remaining 2,400 feet of the lateral were stimulated with eight stages, 10 clusters per stage, and sequential application of both intrawell mechanical and near wellbore diversion technologies. Other wells in the area, which had damage in the casing, were also completed with mechanical diverters. The 1,200 ft lateral section was successfully stimulated without additional well intervention operations with a selected diversion technique. Proppant placement challenges were encountered in the regular five cluster stages with significant improvement in the subsequent 10 cluster stages introducing diversion. Positive diversion indication was confirmed by surface pressure observations and mainly proppant placement success. Multiple instances of non-typical pressure behavior were observed during placement of the mega-diversion stages. This pressure behavior is the subject of technical analysis and results will feed into the future design strategy. The intrawell mechanical diversion technique showed positive diversion indications in different wells in Saudi Arabia, with good repeatability of slickwater propped fracturing treatment success. This technique could be utilized whenever wellbore accessibility challenges are encountered, or during refracturing application cases. Both diversion technques could be used efficiently to stimulate the clusters and optimize well intervention operations, by minimizing the number of stages per well without compromising stimulated reservoir volume.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Cost and Time Effective Stimulation Technique in Horizontal Cemented Liner Application in Carbonate Reservoir With HPCT Hydrajetting Tools Single Trip Multizone Perforation and Gravel Pack STPP: Success Story and Lessons Learned in Malaysian Application Machine Learning and the Analysis of High-Power Electromagnetic Interaction with Subsurface Matter Acoustic Properties of Carbonate: An Experimental and Modelling Study Application of Renewable Energy in the Oil and Gas Industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1