{"title":"约束理论与时间驱动的作业成本法在中小企业生产过程改进中的整合","authors":"İrem Kefe, Veyis Naci Tanış","doi":"10.6018/rcsar.413411","DOIUrl":null,"url":null,"abstract":"In this study, the Time-Driven Activity-Based Costing System (TDABC) is discussed with the Theory of Constraints (TOC). The integration of TDABC and TOC has enabled the determination of the bottleneck activities by the examination of the entire production capacity. For this purpose, a case study was carried out in a manufacturing company. In line with the aim of the case study, the capacity usage based on the TDABC system and capacity constraints were determined within the framework of the TOC. As a result of this study, the following findings were obtained: The activities in the production process of the company were divided into 10 resource centers. Capacity constraints were determined in two of them and it was determined that the order received in the period subject to the study could not meet the production. It was also understood that the degree of products' utilization of operating activities changed due to the differences in the production processes and that the product with a more complex production process required more capacity utilization. This creates a resource constraint for some activities. Then the solutions based on the five-stage improvement of the theory of constraints were proposed to reduce the identified capacity constraints. The solutions were proposed considering the short and long term. The decision of the product mix that would provide the highest profitability in the short term was made by linear programming and products to be discontinued were decided. Overwork or recruitment of additional staff was proposed to increase the capacity in the long run. The results of the study support the managerial decisions in terms of capacity management, product mix decisions, and improvement of production processes by using the time equations of TDABC. Based on the results of this study, businesses that manufacture products that go through different production processes can benefit from the determination of the utilization degree of the products, the idle and bottleneck capacity, and solutions for their improvement.\n En este estudio se analiza el sistema de cálculo de costes por actividades en función del tiempo (TDABC) con la teoría de las restricciones (TOC). La integración de TDABC y TOC ha permitido determinar las actividades de cuello de botella mediante el examen de toda la capacidad de producción. Para ello, se llevó a cabo un estudio de caso en una empresa manufacturera. De acuerdo con el objetivo del estudio de caso, se determinó la utilización de la capacidad basada en el sistema TDABC y las limitaciones de capacidad en el marco de la COT. Como resultado de este estudio, se obtuvieron las siguientes conclusiones: Las actividades del proceso de producción de la empresa se dividieron en 10 centros de recursos. Se determinaron las limitaciones de capacidad en dos de ellos y se designó que el pedido recibido en el periodo objeto del estudio no podía satisfacer la producción. También se entendió que el grado de utilización de los productos de las actividades operativas cambiaba debido a las diferencias en los procesos de producción y que el producto con un proceso de producción más complejo requería una mayor utilización de la capacidad. Esto crea una limitación de recursos para algunas actividades. A continuación, se propusieron las soluciones basadas en la mejora de cinco etapas de la teoría de las restricciones para reducir las limitaciones de capacidad identificadas. Las soluciones se propusieron considerando el corto y el largo plazo. La decisión de la combinación de productos que proporcionara la mayor rentabilidad a corto plazo se determinó mediante programación lineal y se decidieron los productos que debían dejarse de fabricar. Se propuso el exceso de trabajo o la contratación de personal adicional para aumentar la capacidad a largo plazo. Los resultados del estudio apoyan las decisiones de la dirección en cuanto a la gestión de la capacidad, la combinación de productos y la mejora de los procesos de producción mediante el uso de las ecuaciones temporales de TDABC. A partir de los resultados de este estudio, las empresas que fabrican productos que pasan por diferentes procesos de producción pueden beneficiarse de la determinación del grado de utilización de los productos, la capacidad ociosa y el cuello de botella, y las soluciones para su mejora.","PeriodicalId":45652,"journal":{"name":"Revista De Contabilidad-Spanish Accounting Review","volume":null,"pages":null},"PeriodicalIF":1.5000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Integration of the Theory of Constraints and the Time-Driven Activity-Based Costing System for the Improvement of Production Processes in an SME\",\"authors\":\"İrem Kefe, Veyis Naci Tanış\",\"doi\":\"10.6018/rcsar.413411\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, the Time-Driven Activity-Based Costing System (TDABC) is discussed with the Theory of Constraints (TOC). The integration of TDABC and TOC has enabled the determination of the bottleneck activities by the examination of the entire production capacity. For this purpose, a case study was carried out in a manufacturing company. In line with the aim of the case study, the capacity usage based on the TDABC system and capacity constraints were determined within the framework of the TOC. As a result of this study, the following findings were obtained: The activities in the production process of the company were divided into 10 resource centers. Capacity constraints were determined in two of them and it was determined that the order received in the period subject to the study could not meet the production. It was also understood that the degree of products' utilization of operating activities changed due to the differences in the production processes and that the product with a more complex production process required more capacity utilization. This creates a resource constraint for some activities. Then the solutions based on the five-stage improvement of the theory of constraints were proposed to reduce the identified capacity constraints. The solutions were proposed considering the short and long term. The decision of the product mix that would provide the highest profitability in the short term was made by linear programming and products to be discontinued were decided. Overwork or recruitment of additional staff was proposed to increase the capacity in the long run. The results of the study support the managerial decisions in terms of capacity management, product mix decisions, and improvement of production processes by using the time equations of TDABC. Based on the results of this study, businesses that manufacture products that go through different production processes can benefit from the determination of the utilization degree of the products, the idle and bottleneck capacity, and solutions for their improvement.\\n En este estudio se analiza el sistema de cálculo de costes por actividades en función del tiempo (TDABC) con la teoría de las restricciones (TOC). La integración de TDABC y TOC ha permitido determinar las actividades de cuello de botella mediante el examen de toda la capacidad de producción. Para ello, se llevó a cabo un estudio de caso en una empresa manufacturera. De acuerdo con el objetivo del estudio de caso, se determinó la utilización de la capacidad basada en el sistema TDABC y las limitaciones de capacidad en el marco de la COT. Como resultado de este estudio, se obtuvieron las siguientes conclusiones: Las actividades del proceso de producción de la empresa se dividieron en 10 centros de recursos. Se determinaron las limitaciones de capacidad en dos de ellos y se designó que el pedido recibido en el periodo objeto del estudio no podía satisfacer la producción. También se entendió que el grado de utilización de los productos de las actividades operativas cambiaba debido a las diferencias en los procesos de producción y que el producto con un proceso de producción más complejo requería una mayor utilización de la capacidad. Esto crea una limitación de recursos para algunas actividades. A continuación, se propusieron las soluciones basadas en la mejora de cinco etapas de la teoría de las restricciones para reducir las limitaciones de capacidad identificadas. Las soluciones se propusieron considerando el corto y el largo plazo. La decisión de la combinación de productos que proporcionara la mayor rentabilidad a corto plazo se determinó mediante programación lineal y se decidieron los productos que debían dejarse de fabricar. Se propuso el exceso de trabajo o la contratación de personal adicional para aumentar la capacidad a largo plazo. Los resultados del estudio apoyan las decisiones de la dirección en cuanto a la gestión de la capacidad, la combinación de productos y la mejora de los procesos de producción mediante el uso de las ecuaciones temporales de TDABC. A partir de los resultados de este estudio, las empresas que fabrican productos que pasan por diferentes procesos de producción pueden beneficiarse de la determinación del grado de utilización de los productos, la capacidad ociosa y el cuello de botella, y las soluciones para su mejora.\",\"PeriodicalId\":45652,\"journal\":{\"name\":\"Revista De Contabilidad-Spanish Accounting Review\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista De Contabilidad-Spanish Accounting Review\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.6018/rcsar.413411\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista De Contabilidad-Spanish Accounting Review","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.6018/rcsar.413411","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

摘要

本文运用约束理论(TOC)对时间驱动型作业成本核算系统(TDABC)进行了探讨。TDABC和TOC的结合,使得通过对整个生产能力的考察来确定瓶颈活动成为可能。为此,在一家制造公司进行了案例研究。根据案例研究的目的,在TOC框架内确定了基于TDABC系统的容量使用情况和容量约束。通过本文的研究,得出以下结论:将公司生产过程中的活动划分为10个资源中心。在其中两个确定了能力限制,并确定在研究期间收到的订单不能满足生产。还有一项了解是,由于生产过程的不同,产品对经营活动的利用程度也有所不同,生产过程较复杂的产品需要更多的能力利用。这为某些活动创建了资源约束。在此基础上,提出了基于约束理论五阶段改进的解决方案,以减少已识别的容量约束。提出了短期和长期考虑的解决方案。通过线性规划确定短期内利润最高的产品组合,并决定停止生产的产品。建议通过过度工作或增聘工作人员来增加长期的能力。研究结果表明,在产能管理、产品组合决策和生产过程改进方面,TDABC的时间方程为管理决策提供了支持。基于本研究的结果,生产不同生产过程的产品的企业可以从确定产品的利用程度,闲置和瓶颈产能以及改善方案中受益。En este estudio se analysis el sistema de cálculo de costes - povidades En función del time (TDABC)和la teoría de las restricciones (TOC)。La integración de TDABC y TOC允许在确定的情况下进行活动,例如在确定的情况下进行活动,例如在确定的情况下进行活动,例如在确定的情况下进行活动,例如在确定的情况下进行活动,例如在确定的情况下进行活动。Para ello, see llevó a cabo unestudio de caso enuna empresa manufacera。De acuerdo con el objtivo del estudio De caso, se determinó la utilización De la capacidad basada和el sistema TDABC由las limitaciones De capacidad en el marco De la COT。结论:在10个研究中心中,有10个研究中心的研究活动和研究过程。Se determinaron de capacidad en dos de las limitaciones嗨y Se designo, el pedido recibido en el periodo objeto del工厂化没有足satisfacer produccion。tamamacimen se entendió与utilización的产品分类、活动分类、cambiababdebido和producción的产品分类、producción más复杂分类、requería的产品分类、utilización的能力分类有很大的不同。创建一个una limitación de recursos para alguna活动。1 . continuación,这一建议是关于如何解决基础设施问题的建议,以及如何解决基础设施问题的建议teoría关于如何限制基础设施问题的建议,以及如何限制基础设施问题的建议。这些解决方案都是在大型广场上提出的。La decisión de La combinación de productos que proporcionara La mayor rentabilidad a corto plaza se determinó mediante programación线性地通过se decidieron los productos que debían dejarse de fabricar。他建议在一个大广场上设立一个个人额外的公共空间。结果显示,在生产过程中,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示,生产过程的结果显示。不同的加工过程,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺,不同的加工工艺。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Integration of the Theory of Constraints and the Time-Driven Activity-Based Costing System for the Improvement of Production Processes in an SME
In this study, the Time-Driven Activity-Based Costing System (TDABC) is discussed with the Theory of Constraints (TOC). The integration of TDABC and TOC has enabled the determination of the bottleneck activities by the examination of the entire production capacity. For this purpose, a case study was carried out in a manufacturing company. In line with the aim of the case study, the capacity usage based on the TDABC system and capacity constraints were determined within the framework of the TOC. As a result of this study, the following findings were obtained: The activities in the production process of the company were divided into 10 resource centers. Capacity constraints were determined in two of them and it was determined that the order received in the period subject to the study could not meet the production. It was also understood that the degree of products' utilization of operating activities changed due to the differences in the production processes and that the product with a more complex production process required more capacity utilization. This creates a resource constraint for some activities. Then the solutions based on the five-stage improvement of the theory of constraints were proposed to reduce the identified capacity constraints. The solutions were proposed considering the short and long term. The decision of the product mix that would provide the highest profitability in the short term was made by linear programming and products to be discontinued were decided. Overwork or recruitment of additional staff was proposed to increase the capacity in the long run. The results of the study support the managerial decisions in terms of capacity management, product mix decisions, and improvement of production processes by using the time equations of TDABC. Based on the results of this study, businesses that manufacture products that go through different production processes can benefit from the determination of the utilization degree of the products, the idle and bottleneck capacity, and solutions for their improvement. En este estudio se analiza el sistema de cálculo de costes por actividades en función del tiempo (TDABC) con la teoría de las restricciones (TOC). La integración de TDABC y TOC ha permitido determinar las actividades de cuello de botella mediante el examen de toda la capacidad de producción. Para ello, se llevó a cabo un estudio de caso en una empresa manufacturera. De acuerdo con el objetivo del estudio de caso, se determinó la utilización de la capacidad basada en el sistema TDABC y las limitaciones de capacidad en el marco de la COT. Como resultado de este estudio, se obtuvieron las siguientes conclusiones: Las actividades del proceso de producción de la empresa se dividieron en 10 centros de recursos. Se determinaron las limitaciones de capacidad en dos de ellos y se designó que el pedido recibido en el periodo objeto del estudio no podía satisfacer la producción. También se entendió que el grado de utilización de los productos de las actividades operativas cambiaba debido a las diferencias en los procesos de producción y que el producto con un proceso de producción más complejo requería una mayor utilización de la capacidad. Esto crea una limitación de recursos para algunas actividades. A continuación, se propusieron las soluciones basadas en la mejora de cinco etapas de la teoría de las restricciones para reducir las limitaciones de capacidad identificadas. Las soluciones se propusieron considerando el corto y el largo plazo. La decisión de la combinación de productos que proporcionara la mayor rentabilidad a corto plazo se determinó mediante programación lineal y se decidieron los productos que debían dejarse de fabricar. Se propuso el exceso de trabajo o la contratación de personal adicional para aumentar la capacidad a largo plazo. Los resultados del estudio apoyan las decisiones de la dirección en cuanto a la gestión de la capacidad, la combinación de productos y la mejora de los procesos de producción mediante el uso de las ecuaciones temporales de TDABC. A partir de los resultados de este estudio, las empresas que fabrican productos que pasan por diferentes procesos de producción pueden beneficiarse de la determinación del grado de utilización de los productos, la capacidad ociosa y el cuello de botella, y las soluciones para su mejora.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.80
自引率
11.10%
发文量
24
审稿时长
10 weeks
期刊最新文献
Circular Economy and Social Sustainability: A Transdisciplinary Approach to the Basque Country´s automotive sector Editorial letter. Sustainability accounting, accountability and disclosure in a Circular Economy “Old” financial instruments in “new” circular models: Applied environmental accounting in the banking sector for reporting in a circular economy A circularity accounting network: CO2 measurement along supply chains using machine learning Circular reporting, strategy and performance in agri-food companies: a natural resource-based theoretical approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1