Y. Ahmadov, I.G. Huseynov, Sh.I. Mustafayev, A.T. Ismailova
{"title":"海上设施技术状态的即时控制方法","authors":"Y. Ahmadov, I.G. Huseynov, Sh.I. Mustafayev, A.T. Ismailova","doi":"10.37474/0365-8554/2022-10-29-35","DOIUrl":null,"url":null,"abstract":"A method of immediate estimation of technical state and possibilities of further operation of offshore oil-gas hydrotechnical facilities is suggested. Predictive capability of suggested technique is described through the implementation on the structure of a specific deep-water jacket in “Guneshli” field.","PeriodicalId":8668,"journal":{"name":"Azerbaijan Oil Industry","volume":"113 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Method of immediate control on technical state of offshore facilities\",\"authors\":\"Y. Ahmadov, I.G. Huseynov, Sh.I. Mustafayev, A.T. Ismailova\",\"doi\":\"10.37474/0365-8554/2022-10-29-35\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A method of immediate estimation of technical state and possibilities of further operation of offshore oil-gas hydrotechnical facilities is suggested. Predictive capability of suggested technique is described through the implementation on the structure of a specific deep-water jacket in “Guneshli” field.\",\"PeriodicalId\":8668,\"journal\":{\"name\":\"Azerbaijan Oil Industry\",\"volume\":\"113 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Azerbaijan Oil Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37474/0365-8554/2022-10-29-35\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Azerbaijan Oil Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37474/0365-8554/2022-10-29-35","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Method of immediate control on technical state of offshore facilities
A method of immediate estimation of technical state and possibilities of further operation of offshore oil-gas hydrotechnical facilities is suggested. Predictive capability of suggested technique is described through the implementation on the structure of a specific deep-water jacket in “Guneshli” field.