{"title":"考虑电网可靠性的多相PMU配置","authors":"Sanjay Kumar, B. Tyagi, Vishal Kumar, S. Chohan","doi":"10.1109/TDC.2018.8440454","DOIUrl":null,"url":null,"abstract":"This paper presents a novel technique to improve the reliability of observability for the power system by placing Phasor Measurement Units (PMU) in multi-phasing manner. Initially, a method is discussed which utilizes the availability/reliability of power system components for selecting the optimal locations for PMU placement. The PMU placement problem gives multiple solutions with same number of PMUs for complete observability. Against every solution a bus index called reliability index is evaluated for each bus. Next, overall system index (OSI) is obtained by averaging the reliability index for each optimal solution. The optimal solution having maximum OSI has been selected for PMU placement. This index determines the overall insight of observability for wide area monitoring system. Finally, an index called as Reliability Observability Criteria (ROC) is proposed and evaluated for each PMU installed bus using reliability index. ROC shows the contribution of PMU installed bus in enhancing the observability of the network. The proposed technique has been demonstrated on Eastern Region Indian Power Grid (ERIPG 90 bus system).","PeriodicalId":6568,"journal":{"name":"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"63 1","pages":"1-9"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multi-Phase PMU Placement Considering Reliability of Power System Network\",\"authors\":\"Sanjay Kumar, B. Tyagi, Vishal Kumar, S. Chohan\",\"doi\":\"10.1109/TDC.2018.8440454\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a novel technique to improve the reliability of observability for the power system by placing Phasor Measurement Units (PMU) in multi-phasing manner. Initially, a method is discussed which utilizes the availability/reliability of power system components for selecting the optimal locations for PMU placement. The PMU placement problem gives multiple solutions with same number of PMUs for complete observability. Against every solution a bus index called reliability index is evaluated for each bus. Next, overall system index (OSI) is obtained by averaging the reliability index for each optimal solution. The optimal solution having maximum OSI has been selected for PMU placement. This index determines the overall insight of observability for wide area monitoring system. Finally, an index called as Reliability Observability Criteria (ROC) is proposed and evaluated for each PMU installed bus using reliability index. ROC shows the contribution of PMU installed bus in enhancing the observability of the network. The proposed technique has been demonstrated on Eastern Region Indian Power Grid (ERIPG 90 bus system).\",\"PeriodicalId\":6568,\"journal\":{\"name\":\"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"63 1\",\"pages\":\"1-9\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2018.8440454\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2018.8440454","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Multi-Phase PMU Placement Considering Reliability of Power System Network
This paper presents a novel technique to improve the reliability of observability for the power system by placing Phasor Measurement Units (PMU) in multi-phasing manner. Initially, a method is discussed which utilizes the availability/reliability of power system components for selecting the optimal locations for PMU placement. The PMU placement problem gives multiple solutions with same number of PMUs for complete observability. Against every solution a bus index called reliability index is evaluated for each bus. Next, overall system index (OSI) is obtained by averaging the reliability index for each optimal solution. The optimal solution having maximum OSI has been selected for PMU placement. This index determines the overall insight of observability for wide area monitoring system. Finally, an index called as Reliability Observability Criteria (ROC) is proposed and evaluated for each PMU installed bus using reliability index. ROC shows the contribution of PMU installed bus in enhancing the observability of the network. The proposed technique has been demonstrated on Eastern Region Indian Power Grid (ERIPG 90 bus system).