{"title":"仪器混凝土桩试验。第1部分:仪器和程序的回顾","authors":"K. N. Flynn, B. A. McCabe","doi":"10.1680/jgeen.21.00126","DOIUrl":null,"url":null,"abstract":"Preliminary pile tests are becoming increasingly routine in piling projects, some of which are instrumented to help optimise parameters for working pile design. However, the execution of a successf...","PeriodicalId":54572,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","volume":"202 1","pages":""},"PeriodicalIF":1.7000,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Instrumented Concrete Pile Tests – Part 1: A Review of Instrumentation and Procedures\",\"authors\":\"K. N. Flynn, B. A. McCabe\",\"doi\":\"10.1680/jgeen.21.00126\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Preliminary pile tests are becoming increasingly routine in piling projects, some of which are instrumented to help optimise parameters for working pile design. However, the execution of a successf...\",\"PeriodicalId\":54572,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"volume\":\"202 1\",\"pages\":\"\"},\"PeriodicalIF\":1.7000,\"publicationDate\":\"2021-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jgeen.21.00126\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jgeen.21.00126","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
Instrumented Concrete Pile Tests – Part 1: A Review of Instrumentation and Procedures
Preliminary pile tests are becoming increasingly routine in piling projects, some of which are instrumented to help optimise parameters for working pile design. However, the execution of a successf...
期刊介绍:
Geotechnical Engineering provides a forum for the publication of high quality, topical and relevant technical papers covering all aspects of geotechnical research, design, construction and performance. The journal aims to be of interest to those civil, structural or geotechnical engineering practitioners wishing to develop a greater understanding of the influence of geotechnics on the built environment.