{"title":"大断面煤巷锚杆支护技术现场试验","authors":"Yue Zhong-wen, Yang Ren-shu, Yan Zhen-dong, Han Peng-Fei, Zhang Yao-hui","doi":"10.1109/CDCIEM.2011.102","DOIUrl":null,"url":null,"abstract":"In order to study the support design of large section roadway, filed experiment research of anchor- cable roadway support was carried out, with the engineering background of Zhaozhuang Mine of Jincheng Coal Industry Group. Field monitoring results indicate that, total deformation of Lane5101 is greater than Lane 5102 at the same amount of time, the ribs convergence value of Lane 5101 is 250mm, while Lane5102 is between 130mm to 150mm. The anchor¡¯s anchorage of upper rib is greater than lower rib, and the activity level of rock of upper roadway rib is greater than lower rib. The anchorage of cable at the middle of roof is larger than the sides of roof. The anchorage of cable at the middle of roof floats between 165KN and 168KN, while there is a big difference between the two sides of roof. Geological conditions are the main factors affecting the stability of roadway. The research also shows that the support of bolt and cable integration is an effective method to improve the surrounding rock stability of large section roadway.","PeriodicalId":6328,"journal":{"name":"2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring","volume":"23 1","pages":"2443-2447"},"PeriodicalIF":0.0000,"publicationDate":"2011-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Field Experiment on Bolt-Anchor Support Technology of Coal Roadway with Large Cross Section\",\"authors\":\"Yue Zhong-wen, Yang Ren-shu, Yan Zhen-dong, Han Peng-Fei, Zhang Yao-hui\",\"doi\":\"10.1109/CDCIEM.2011.102\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to study the support design of large section roadway, filed experiment research of anchor- cable roadway support was carried out, with the engineering background of Zhaozhuang Mine of Jincheng Coal Industry Group. Field monitoring results indicate that, total deformation of Lane5101 is greater than Lane 5102 at the same amount of time, the ribs convergence value of Lane 5101 is 250mm, while Lane5102 is between 130mm to 150mm. The anchor¡¯s anchorage of upper rib is greater than lower rib, and the activity level of rock of upper roadway rib is greater than lower rib. The anchorage of cable at the middle of roof is larger than the sides of roof. The anchorage of cable at the middle of roof floats between 165KN and 168KN, while there is a big difference between the two sides of roof. Geological conditions are the main factors affecting the stability of roadway. The research also shows that the support of bolt and cable integration is an effective method to improve the surrounding rock stability of large section roadway.\",\"PeriodicalId\":6328,\"journal\":{\"name\":\"2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring\",\"volume\":\"23 1\",\"pages\":\"2443-2447\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-04-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDCIEM.2011.102\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDCIEM.2011.102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

为研究大断面巷道支护设计,以晋城煤业集团赵庄矿为工程背景,开展了锚索巷道支护的现场试验研究。现场监测结果表明,相同时间,巷道巷5101的总变形量大于巷道巷5102,巷道巷5101的肋部收敛值为250mm,巷道巷5102的肋部收敛值在130mm ~ 150mm之间。上肋锚杆锚固力大于下肋,上肋围岩活动性大于下肋。顶板中部锚索锚固量大于顶板两侧锚索锚固量。顶板中部锚索锚固量在165KN ~ 168KN之间浮动,而顶板两侧锚索锚固量差异较大。地质条件是影响巷道稳定性的主要因素。研究还表明,锚索一体化支护是提高大断面巷道围岩稳定性的有效方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Field Experiment on Bolt-Anchor Support Technology of Coal Roadway with Large Cross Section
In order to study the support design of large section roadway, filed experiment research of anchor- cable roadway support was carried out, with the engineering background of Zhaozhuang Mine of Jincheng Coal Industry Group. Field monitoring results indicate that, total deformation of Lane5101 is greater than Lane 5102 at the same amount of time, the ribs convergence value of Lane 5101 is 250mm, while Lane5102 is between 130mm to 150mm. The anchor¡¯s anchorage of upper rib is greater than lower rib, and the activity level of rock of upper roadway rib is greater than lower rib. The anchorage of cable at the middle of roof is larger than the sides of roof. The anchorage of cable at the middle of roof floats between 165KN and 168KN, while there is a big difference between the two sides of roof. Geological conditions are the main factors affecting the stability of roadway. The research also shows that the support of bolt and cable integration is an effective method to improve the surrounding rock stability of large section roadway.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Research on Equivalence Network Concentrated with Wind Farms Synthesis and Characterization of the Pb5(PxAs1-xO4)3Cl Solid Solutions Initial Identification of an Manganese Resistant Microorgnism The Study of Underground Water Treatment Techniques for Acid In-Situ Leaching of Uranium: Surface Water Treatment Combined with the Natural Purification Instruction Experiment of Study on BAF to Extract Potassium from Molasses Alcohol Wastewater
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1